Difference between revisions of "Enbridge Line 3 Oil Pipeline"

From A Barrel Full
Jump to navigation Jump to search
Line 9: Line 9:
 
* Crude Type:
 
* Crude Type:
  
+++ Brief Description
+
=== Brief Description ===
  
 
* Line 3 is a 1,031 mile (1,660 kilometres), 34-inch diameter pipeline that has been in operation since 1968.  
 
* Line 3 is a 1,031 mile (1,660 kilometres), 34-inch diameter pipeline that has been in operation since 1968.  
 
* It is one of six crude oil pipelines that make up the Enbridge mainline system.
 
* It is one of six crude oil pipelines that make up the Enbridge mainline system.
  
+++ Pipeline Status
+
== Pipeline Status ===
* -
+
* The pipeline is the subject of a $2.6 Billion renewal project
  
 
=== History ===
 
=== History ===

Revision as of 20:00, 17 November 2020

Summary Information

  • Source: Edmonton, Alberta, Canada
  • Destination: Superior, Wisconsin, USA
  • Ownership: Enbridge
  • Website: http://www.enbridge.com/
  • Length: 1,031 mile (1,660 kilometres)
  • Capacity: barrels of oil per day
  • Crude Type:

Brief Description

  • Line 3 is a 1,031 mile (1,660 kilometres), 34-inch diameter pipeline that has been in operation since 1968.
  • It is one of six crude oil pipelines that make up the Enbridge mainline system.

Pipeline Status =

  • The pipeline is the subject of a $2.6 Billion renewal project

History

  • 2014 - Enbridge announces $7 Billion replacement project

+++ Other Information

  • -

Links

  1. Enbridge to Undertake $7 Billion Mainline Replacement Program
  2. Enbridge Finalizes $7.5 Billion Mainline Replacement Program Cost Estimate; Issues CDN$400 Million of Common Equity
  3. Enbridge Line 3 Replacement Project Receives MPCA Approvals and Remaining DNR Permits