Elephant Oil Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: ENI
  • Country: Libya
  • Location: South-western desert some 800 km from Tripoli
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The field infrastructure comprises power supply, oil treatment and transmission facilities to the oil export terminal

+++ Contractors

  • **J P Kenny:** Review of Front End Engineering & Design
  • **Simeco:** Water Injection System & Power Generation Plant Multidiscipline Engineering Design and ITB for EPC

+++ History

  • 2004 - Oil production started
  • 2011 - Gazprom buys a stake from ENI

+++ Geology

+++ Links

  1. J P Kenny Subsea References
  2. Simeco Refining References
  3. Eni: production start up from Elephant, an important oil field in Libya
  4. Eni and Gazprom sign new agreements
  5. Gazprom acquires a stake in Libya’s Elephant oil project from Eni