* Ownership:  Hellenic Petroleum
 
* Ownership:  Hellenic Petroleum
Line 11: Line 11:
 
* Budget: €1.2 Billion
 
* Budget: €1.2 Billion
  
+++ The Project
+
=== The Project ===
  
 
* Project Type: Major Upgrade
 
* Project Type: Major Upgrade
 
* Project Summary: The project is designed to improve the refinery's complexity, through the addition of a Flexicoker, Hydrocracker and other units.  
 
* Project Summary: The project is designed to improve the refinery's complexity, through the addition of a Flexicoker, Hydrocracker and other units.  
 
* Main Contractors:
 
* Main Contractors:
* Foster Wheeler, FEED
+
** Foster Wheeler, FEED
* Tecnicas Reunidas, EPCM
+
** Tecnicas Reunidas, EPCM
  
+++ Refining Units
+
=== Refining Units ===
  
 
* Vacuum Distillation Unit - 45,300 bbls/day
 
* Vacuum Distillation Unit - 45,300 bbls/day
Line 30: Line 30:
 
* Associated utilities and offsites.
 
* Associated utilities and offsites.
  
+++ Terminal Capacity
+
=== Terminal Capacity ===
  
 
* Crude Oil:  
 
* Crude Oil:  
 
* Refined Products:  
 
* Refined Products:  
  
+++ Crude Supply
+
=== Crude Supply ===
  
 
* The share of heavy crudes processed will increase from 60% to 100%
 
* The share of heavy crudes processed will increase from 60% to 100%
  
  
+++ Products Produced
+
=== Products Produced ===
  
 
* The project increases production of white products at the expense of fuel oil.
 
* The project increases production of white products at the expense of fuel oil.
Line 47: Line 47:
  
  
+++ Other Information
+
=== Other Information ===
  
 
* Aims of the upgrade:
 
* Aims of the upgrade:
* Increase processing of medium- to highsulfur crudes: 60% 100%
+
** Increase processing of medium- to highsulfur crudes: 60% 100%
* Increase production of white products at the expense of fuel oil:  
+
** Increase production of white products at the expense of fuel oil:  
  * Light Products: 52% - 100%  
+
*** Light Products: 52% - 100%  
  * Black products: 48% - 0%  
+
*** Black products: 48% - 0%  
* Reduce emissions:  
+
** Reduce emissions:  
  * SO2: 642 kg/hr < 200 kg/hr  
+
*** SO2: 642 kg/hr < 200 kg/hr  
  * NOx: 92 kg/hr < 90 kg/hr  
+
*** NOx: 92 kg/hr < 90 kg/hr  
  * PM: 45 kg/hr < 20 kg/hr
+
*** PM: 45 kg/hr < 20 kg/hr
  
+++ History
+
=== History ===
  
 
* 2006 - Foster Wheeler Awarded Front-End Engineering Design Contract
 
* 2006 - Foster Wheeler Awarded Front-End Engineering Design Contract
 
* 2012 - Refinery upgrade completed
 
* 2012 - Refinery upgrade completed
  
+++ Relevant Links
+
=== Links ===
  
 
# [http://www.hellenic-petroleum.gr/online/generic.aspx?mid=163&pid=109 Hellenic Petroleum Refining Page]
 
# [http://www.hellenic-petroleum.gr/online/generic.aspx?mid=163&pid=109 Hellenic Petroleum Refining Page]

Latest revision as of 16:30, 26 January 2021

Summary Information

  • Ownership: Hellenic Petroleum
  • Website: http://www.hellenic-petroleum.gr/online/index.aspx
  • Wiki Page: Elefsina Refinery
  • Location: South of Athens, Greece
  • Capacity: million tons/annum & bbl/day
  • Nelson Complexity: Current, 1.5, After Completion, 7.2
  • Project Stage: [[[Completed Refinery Projects | Completed]]]
  • Expected Completion: [[[Refinery Projects to be Completed in 2012 | 2012]]]
  • Budget: €1.2 Billion

The Project

  • Project Type: Major Upgrade
  • Project Summary: The project is designed to improve the refinery's complexity, through the addition of a Flexicoker, Hydrocracker and other units.
  • Main Contractors:
    • Foster Wheeler, FEED
    • Tecnicas Reunidas, EPCM

Refining Units

  • Vacuum Distillation Unit - 45,300 bbls/day
  • [[[Flexicoking]]] - Exxon Mobil - 20,050 bbls/day
  • [[[Hydrocracker]]] - UOP - 40,000 bbls/day
  • Hydrogen Plant - Haldor Topsøe- 120,000 m3/h
  • Sulphur Recovery Unit 2 X 140 t/d
  • Sour Water Stripper 120 m3/h
  • Amine Recovery Unit 280 t/d
  • Associated utilities and offsites.

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • The share of heavy crudes processed will increase from 60% to 100%


Products Produced

  • The project increases production of white products at the expense of fuel oil.
  • It will address the shortage of diesel locally and regionally
  • Middle Distillate yield will increase to 75%


Other Information

  • Aims of the upgrade:
    • Increase processing of medium- to highsulfur crudes: 60% 100%
    • Increase production of white products at the expense of fuel oil:
      • Light Products: 52% - 100%
      • Black products: 48% - 0%
    • Reduce emissions:
      • SO2: 642 kg/hr < 200 kg/hr
      • NOx: 92 kg/hr < 90 kg/hr
      • PM: 45 kg/hr < 20 kg/hr

History

  • 2006 - Foster Wheeler Awarded Front-End Engineering Design Contract
  • 2012 - Refinery upgrade completed

Links

  1. Hellenic Petroleum Refining Page
  2. Foster Wheeler Awarded Front-End Engineering Design Contract for Greek Refinery Upgrade
  3. Investor Presentation April 2010
  4. ELEFSIS REFINERY UPGRADING PROJECT, Foster Wheeler
  5. Tecnicas Reunidas, Under projects