Difference between revisions of "El Segundo Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Chevron Website: http://www.chevron.com/ List of Chevron Refineries Location: Los Angeles Capacity: 13.5 million tons/annum & 270,000 bbl/day Ne...") |
Abarrelfull (talk | contribs) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | Ownership: Chevron | + | * Ownership: Chevron |
− | Website: http://www.chevron.com/ | + | * Website: http://www.chevron.com/ |
− | List of Chevron Refineries | + | * List of [[Chevron Refineries]] |
− | Location: Los Angeles | + | * Location: Los Angeles |
− | Capacity: 13.5 million tons/annum & 270,000 bbl/day | + | * Capacity: 13.5 million tons/annum & 270,000 bbl/day |
− | Nelson Complexity: | + | * Nelson Complexity: |
− | Refining Units | + | === Refining Units === |
− | CDU - 270,000 bbl/day | + | * CDU - 270,000 bbl/day |
− | VDU - 155,000 bbl/day | + | * VDU - 155,000 bbl/day |
− | Naphtha Hydrotreating - 59,000 bbl/day | + | * Naphtha Hydrotreating - 59,000 bbl/day |
− | Diesel Desulphurisation - 172,000 | + | * Diesel Desulphurisation - 172,000 |
− | Delayed Coker, 83,500 bbl/day | + | * Delayed Coker, 83,500 bbl/day |
− | Hydrocracker - 59,500 bbl/day | + | * Hydrocracker - 59,500 bbl/day |
− | FCC - 82,000 | + | * FCC - 82,000 |
− | + | * Hydrogen Unit, | |
− | Catalytic Reforming - 49,000 bbl/day | + | * Catalytic Reforming - 49,000 bbl/day |
− | Alkylation | + | * Alkylation |
− | Terminal Capacity | + | === Terminal Capacity === |
− | Crude Oil: | + | * Crude Oil: |
− | Refined Products: | + | * Refined Products: |
− | Crude Supply | + | === Crude Supply === |
+ | * Majority of the crude oil is supplied by vessel to the company's marine terminal | ||
+ | * Crude is also supplied from local oilfields by pipeline | ||
+ | |||
+ | === Products Produced === | ||
+ | * Propane, Butane, Gasoline, Diesel, Jet Fuel, Coke, Sulphur | ||
+ | * Some of the products are sold via the [[Calnev Oil Products Pipeline]] | ||
+ | |||
+ | === Projects === | ||
- | - | ||
− | + | === Other Information === | |
− | |||
− | |||
- | - | ||
− | + | === History === | |
− | + | * El Segundo was selected as the site for the second refinery in California in 1911 | |
− | History | + | * 2013 - The coke drums were replaced on the delayed coker |
− | El Segundo was selected as the site for the second refinery in California in 1911 | + | * 2023 - The renewable diesel unit came on stream |
− | + | ||
− | + | === Links === | |
− | Refinery Webpage | + | # [https://elsegundo.chevron.com/ Refinery Webpage] |
− | In Cooperation with Cal OSHA, CSB Releases Technical Report on Corrosion Found in Chevron El Segundo Refinery Crude Unit Piping | + | # [http://killajoules.wikidot.com/blog:4137 In Cooperation with Cal OSHA, CSB Releases Technical Report on Corrosion Found in Chevron El Segundo Refinery Crude Unit Piping] |
+ | # [https://elsegundo.chevron.com/about/projects/coke-drum-project Coke drum project] | ||
+ | https://refiningnews.blogspot.com/2023/11/chevron-lummus-global-commissions.html Chevron Lummus Global Commissions ISOTERRA Unit at Chevron's El Segundo Refinery] | ||
+ | |||
+ | [[category:Refinery]] | ||
+ | [[category:USA]] | ||
+ | [[category:Chevron]] |
Latest revision as of 10:25, 9 November 2023
Contents
Summary Information
- Ownership: Chevron
- Website: http://www.chevron.com/
- List of Chevron Refineries
- Location: Los Angeles
- Capacity: 13.5 million tons/annum & 270,000 bbl/day
- Nelson Complexity:
Refining Units
- CDU - 270,000 bbl/day
- VDU - 155,000 bbl/day
- Naphtha Hydrotreating - 59,000 bbl/day
- Diesel Desulphurisation - 172,000
- Delayed Coker, 83,500 bbl/day
- Hydrocracker - 59,500 bbl/day
- FCC - 82,000
- Hydrogen Unit,
- Catalytic Reforming - 49,000 bbl/day
- Alkylation
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- Majority of the crude oil is supplied by vessel to the company's marine terminal
- Crude is also supplied from local oilfields by pipeline
Products Produced
- Propane, Butane, Gasoline, Diesel, Jet Fuel, Coke, Sulphur
- Some of the products are sold via the Calnev Oil Products Pipeline
Projects
-
Other Information
-
History
- El Segundo was selected as the site for the second refinery in California in 1911
- 2013 - The coke drums were replaced on the delayed coker
- 2023 - The renewable diesel unit came on stream
Links
- Refinery Webpage
- In Cooperation with Cal OSHA, CSB Releases Technical Report on Corrosion Found in Chevron El Segundo Refinery Crude Unit Piping
- Coke drum project
https://refiningnews.blogspot.com/2023/11/chevron-lummus-global-commissions.html Chevron Lummus Global Commissions ISOTERRA Unit at Chevron's El Segundo Refinery]