* El Segundo was selected as the site for the second refinery in California in 1911
 
* El Segundo was selected as the site for the second refinery in California in 1911
* 2012 - The Richmond Refinery experienced a major process fire
+
* 2013 - The coke drums were replaced on the delayed coker
 +
 
 
=== Links ===
 
=== Links ===
 
# [https://elsegundo.chevron.com/ Refinery Webpage]
 
# [https://elsegundo.chevron.com/ Refinery Webpage]

Revision as of 11:47, 12 March 2020

Summary Information

Refining Units

  • CDU - 270,000 bbl/day
  • VDU - 155,000 bbl/day
  • Naphtha Hydrotreating - 59,000 bbl/day
  • Diesel Desulphurisation - 172,000
  • Delayed Coker, 83,500 bbl/day
  • Hydrocracker - 59,500 bbl/day
  • FCC - 82,000
  • Hydrogen Unit,
  • Catalytic Reforming - 49,000 bbl/day
  • Alkylation

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • Majority of the crude oil is supplied by vessel to the company's marine terminal
  • Crude is also supplied from local oilfields by pipeline

Products Produced

  • Propane, Butane, Gasoline, Diesel, Jet Fuel, Coke, Sulphur

Projects

-

Other Information

-

History

  • El Segundo was selected as the site for the second refinery in California in 1911
  • 2013 - The coke drums were replaced on the delayed coker

Links

  1. Refinery Webpage
  2. In Cooperation with Cal OSHA, CSB Releases Technical Report on Corrosion Found in Chevron El Segundo Refinery Crude Unit Piping