(Created page with "Summary Information Ownership: Chevron Website: http://www.chevron.com/ List of Chevron Refineries Location: Los Angeles Capacity: 13.5 million tons/annum & 270,000 bbl/day Ne...")
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
Ownership: Chevron
+
* Ownership: Chevron
Website: http://www.chevron.com/
+
* Website: http://www.chevron.com/
List of Chevron Refineries
+
* List of [[Chevron Refineries]]
Location: Los Angeles
+
* Location: Los Angeles
Capacity: 13.5 million tons/annum & 270,000 bbl/day
+
* Capacity: 13.5 million tons/annum & 270,000 bbl/day
Nelson Complexity:
+
* Nelson Complexity:
Refining Units
+
=== Refining Units ===
CDU - 270,000 bbl/day
+
* CDU - 270,000 bbl/day
VDU - 155,000 bbl/day
+
* VDU - 155,000 bbl/day
Naphtha Hydrotreating - 59,000 bbl/day
+
* Naphtha Hydrotreating - 59,000 bbl/day
Diesel Desulphurisation - 172,000
+
* Diesel Desulphurisation - 172,000
Delayed Coker, 83,500 bbl/day
+
* Delayed Coker, 83,500 bbl/day
Hydrocracker - 59,500 bbl/day
+
* Hydrocracker - 59,500 bbl/day
FCC - 82,000
+
* FCC - 82,000
SMR,
+
* Hydrogen Unit,
Catalytic Reforming - 49,000 bbl/day
+
* Catalytic Reforming - 49,000 bbl/day
Alkylation
+
* Alkylation
Terminal Capacity
+
=== Terminal Capacity ===
Crude Oil:
+
* Crude Oil:
Refined Products:
+
* Refined Products:
Crude Supply
+
=== Crude Supply ===
 
-
 
-
Products Produced
+
=== Products Produced ===
Propane, Butane, Gasoline, Diesel, Jet Fuel, Coke, Sulphur
+
* Propane, Butane, Gasoline, Diesel, Jet Fuel, Coke, Sulphur
Ongoing Projects
+
=== Projects ===
 
-
 
-
Other Information
+
=== Other Information ===
 
-
 
-
History
+
=== History ===
El Segundo was selected as the site for the second refinery in California in 1911
+
* El Segundo was selected as the site for the second refinery in California in 1911
2012 - The Richmond Refinery experienced a major process fire
+
* 2012 - The Richmond Refinery experienced a major process fire
Relevant Links
+
=== Links ===
Refinery Webpage
+
# [https://elsegundo.chevron.com/ Refinery Webpage]
In Cooperation with Cal OSHA, CSB Releases Technical Report on Corrosion Found in Chevron El Segundo Refinery Crude Unit Piping
+
# [http://killajoules.wikidot.com/blog:4137 In Cooperation with Cal OSHA, CSB Releases Technical Report on Corrosion Found in Chevron El Segundo Refinery Crude Unit Piping]
 +
 
 +
[[category:Refinery]]
 +
[[category:USA]]
 +
[[category:Chevron]]

Revision as of 11:02, 12 March 2020

Summary Information

Refining Units

  • CDU - 270,000 bbl/day
  • VDU - 155,000 bbl/day
  • Naphtha Hydrotreating - 59,000 bbl/day
  • Diesel Desulphurisation - 172,000
  • Delayed Coker, 83,500 bbl/day
  • Hydrocracker - 59,500 bbl/day
  • FCC - 82,000
  • Hydrogen Unit,
  • Catalytic Reforming - 49,000 bbl/day
  • Alkylation

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

-

Products Produced

  • Propane, Butane, Gasoline, Diesel, Jet Fuel, Coke, Sulphur

Projects

-

Other Information

-

History

  • El Segundo was selected as the site for the second refinery in California in 1911
  • 2012 - The Richmond Refinery experienced a major process fire

Links

  1. Refinery Webpage
  2. In Cooperation with Cal OSHA, CSB Releases Technical Report on Corrosion Found in Chevron El Segundo Refinery Crude Unit Piping