Summary Information
+
=== Summary Information ===
  
* Ownership: Enagas
+
* Ownership: Enagas / Reganosa
 
* Website: http://www.enagas.es/
 
* Website: http://www.enagas.es/
 
* Location:  Near the city of Gijon in the province of Asturias, North Coast of Spain
 
* Location:  Near the city of Gijon in the province of Asturias, North Coast of Spain
Line 7: Line 7:
 
* Status: Under Construction
 
* Status: Under Construction
  
+++ Brief Description
+
=== Brief Description ===
* A regasifiaction terminal with two large tanks and unloading facilities for the largest tankers
+
* A regasification terminal with two large tanks and unloading facilities for the largest tankers
  
+++ Technical Details
+
=== Technical Details ===
 
* Storage capacity: two 150,000 cubic meter LNG tanks  
 
* Storage capacity: two 150,000 cubic meter LNG tanks  
 
* Unloading capacity: A jetty will allow the unloading of LNG carriers with a capacity up to 230,000 m3
 
* Unloading capacity: A jetty will allow the unloading of LNG carriers with a capacity up to 230,000 m3
 
* Send out capacity:  800,000 normal cubic meters/hour
 
* Send out capacity:  800,000 normal cubic meters/hour
 
* Constructor:  
 
* Constructor:  
* **Fluor:** Detailed engineering, procurement services and construction management (EPCM)
+
** **Fluor:** Detailed engineering, procurement services and construction management (EPCM)
* **Sofregaz-SENER:** Basic engineering  
+
** **Sofregaz-SENER:** Basic engineering  
* **IKM Testing:** Pre-commissioning and commissioning contract
+
** **IKM Testing:** Pre-commissioning and commissioning contract
* Licensor:
 
  
  
+++ Ongoing Projects/Project Status
+
 
 +
=== Ongoing Projects/Project Status ===
 
* The project has been postponed by order of the energy regulator
 
* The project has been postponed by order of the energy regulator
* Commissioning is expected in [[[LNG Terminals to be Completed in 2012 | 2012]]]
+
* Commissioning is expected in [[LNG Terminals to be Completed in 2012 | 2012]]
  
+++ Suppliers / Customers
+
=== Suppliers / Customers ===
 
* Suppliers:  
 
* Suppliers:  
 
* Customers: The terminal will supply the domestic gas grid and two combined cycle power stations in the Asturia province
 
* Customers: The terminal will supply the domestic gas grid and two combined cycle power stations in the Asturia province
  
  
+++ History
+
=== History ===
 
* 2006 - The Ministry of Industry awarded the terminal contract to Enagas
 
* 2006 - The Ministry of Industry awarded the terminal contract to Enagas
 
* 2008 - Fluor awarded EPC contract  
 
* 2008 - Fluor awarded EPC contract  
 
* 2012 - IKM Testing awarded commissioning contract
 
* 2012 - IKM Testing awarded commissioning contract
 +
* 2023 - Reganosa buys a 25% stake
  
+++ Other Information
+
=== Other Information ===
 
* The terminal is being built on land reclaimed from the sea
 
* The terminal is being built on land reclaimed from the sea
  
+++ Relevant Links
+
=== Links ===
  
 
# [http://killajoules.wikidot.com/archive:the-new-regasification-plant-in-el-musel-has-been-aw The new regasification plant in El Musel has been awarded to Enagas]
 
# [http://killajoules.wikidot.com/archive:the-new-regasification-plant-in-el-musel-has-been-aw The new regasification plant in El Musel has been awarded to Enagas]
Line 44: Line 45:
 
# [http://www.sener-power-process.com/ENERGIA/ProjectsI/liquified-natural-gas-terminal-to-be-located-at-el-musel-gijon/en?pag=0&agno=&area=&categoria=ENERGIA_GAS&totalperpage=5 LIQUIFIED NATURAL GAS TERMINAL TO BE LOCATED AT EL MUSEL, GIJÓN]
 
# [http://www.sener-power-process.com/ENERGIA/ProjectsI/liquified-natural-gas-terminal-to-be-located-at-el-musel-gijon/en?pag=0&agno=&area=&categoria=ENERGIA_GAS&totalperpage=5 LIQUIFIED NATURAL GAS TERMINAL TO BE LOCATED AT EL MUSEL, GIJÓN]
 
# [http://killajoules.wikidot.com/archive:enagas-has-recently-awarded-ikm-testing-spain-a-new Enagas has recently awarded IKM Testing Spain a new contract]
 
# [http://killajoules.wikidot.com/archive:enagas-has-recently-awarded-ikm-testing-spain-a-new Enagas has recently awarded IKM Testing Spain a new contract]
 +
# [https://lng-news.blogspot.com/2023/03/enagas-has-acquired-reganosa-network-of.html Enagás has acquired the Reganosa network of natural gas pipelines, which will enter into the shareholding of El Musel Regasification Plant with 25%]
  
 
[[category:LNG]]
 
[[category:LNG]]
 
[[category:Spain]]
 
[[category:Spain]]
 
[[category:Endesa]]
 
[[category:Endesa]]

Latest revision as of 15:15, 5 March 2023

Summary Information

  • Ownership: Enagas / Reganosa
  • Website: http://www.enagas.es/
  • Location: Near the city of Gijon in the province of Asturias, North Coast of Spain
  • Capacity: million tons/annum
  • Status: Under Construction

Brief Description

  • A regasification terminal with two large tanks and unloading facilities for the largest tankers

Technical Details

  • Storage capacity: two 150,000 cubic meter LNG tanks
  • Unloading capacity: A jetty will allow the unloading of LNG carriers with a capacity up to 230,000 m3
  • Send out capacity: 800,000 normal cubic meters/hour
  • Constructor:
    • **Fluor:** Detailed engineering, procurement services and construction management (EPCM)
    • **Sofregaz-SENER:** Basic engineering
    • **IKM Testing:** Pre-commissioning and commissioning contract


Ongoing Projects/Project Status

  • The project has been postponed by order of the energy regulator
  • Commissioning is expected in 2012

Suppliers / Customers

  • Suppliers:
  • Customers: The terminal will supply the domestic gas grid and two combined cycle power stations in the Asturia province


History

  • 2006 - The Ministry of Industry awarded the terminal contract to Enagas
  • 2008 - Fluor awarded EPC contract
  • 2012 - IKM Testing awarded commissioning contract
  • 2023 - Reganosa buys a 25% stake

Other Information

  • The terminal is being built on land reclaimed from the sea

Links

  1. The new regasification plant in El Musel has been awarded to Enagas
  2. to Build New Enagas LNG Terminal on Spain's North Coast
  3. LIQUIFIED NATURAL GAS TERMINAL TO BE LOCATED AT EL MUSEL, GIJÓN
  4. Enagas has recently awarded IKM Testing Spain a new contract
  5. Enagás has acquired the Reganosa network of natural gas pipelines, which will enter into the shareholding of El Musel Regasification Plant with 25%