Abarrelfull (talk | contribs) (Created page with "Summary Information * Ownership: Enagas * Website: http://www.enagas.es/ * Location: Near the city of Gijon in the province of Asturias, North Coast of Spain * Capacity: mil...") |
Abarrelfull (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | * Ownership: Enagas | + | * Ownership: Enagas / Reganosa |
* Website: http://www.enagas.es/ | * Website: http://www.enagas.es/ | ||
* Location: Near the city of Gijon in the province of Asturias, North Coast of Spain | * Location: Near the city of Gijon in the province of Asturias, North Coast of Spain | ||
Line 7: | Line 7: | ||
* Status: Under Construction | * Status: Under Construction | ||
− | + | === Brief Description === | |
− | * A | + | * A regasification terminal with two large tanks and unloading facilities for the largest tankers |
− | + | === Technical Details === | |
* Storage capacity: two 150,000 cubic meter LNG tanks | * Storage capacity: two 150,000 cubic meter LNG tanks | ||
* Unloading capacity: A jetty will allow the unloading of LNG carriers with a capacity up to 230,000 m3 | * Unloading capacity: A jetty will allow the unloading of LNG carriers with a capacity up to 230,000 m3 | ||
* Send out capacity: 800,000 normal cubic meters/hour | * Send out capacity: 800,000 normal cubic meters/hour | ||
* Constructor: | * Constructor: | ||
− | + | ** **Fluor:** Detailed engineering, procurement services and construction management (EPCM) | |
− | + | ** **Sofregaz-SENER:** Basic engineering | |
− | + | ** **IKM Testing:** Pre-commissioning and commissioning contract | |
− | |||
− | + | ||
+ | === Ongoing Projects/Project Status === | ||
* The project has been postponed by order of the energy regulator | * The project has been postponed by order of the energy regulator | ||
− | * Commissioning is expected in | + | * Commissioning is expected in [[LNG Terminals to be Completed in 2012 | 2012]] |
− | + | === Suppliers / Customers === | |
* Suppliers: | * Suppliers: | ||
* Customers: The terminal will supply the domestic gas grid and two combined cycle power stations in the Asturia province | * Customers: The terminal will supply the domestic gas grid and two combined cycle power stations in the Asturia province | ||
− | + | === History === | |
* 2006 - The Ministry of Industry awarded the terminal contract to Enagas | * 2006 - The Ministry of Industry awarded the terminal contract to Enagas | ||
* 2008 - Fluor awarded EPC contract | * 2008 - Fluor awarded EPC contract | ||
* 2012 - IKM Testing awarded commissioning contract | * 2012 - IKM Testing awarded commissioning contract | ||
+ | * 2023 - Reganosa buys a 25% stake | ||
− | + | === Other Information === | |
* The terminal is being built on land reclaimed from the sea | * The terminal is being built on land reclaimed from the sea | ||
− | + | === Links === | |
# [http://killajoules.wikidot.com/archive:the-new-regasification-plant-in-el-musel-has-been-aw The new regasification plant in El Musel has been awarded to Enagas] | # [http://killajoules.wikidot.com/archive:the-new-regasification-plant-in-el-musel-has-been-aw The new regasification plant in El Musel has been awarded to Enagas] | ||
Line 44: | Line 45: | ||
# [http://www.sener-power-process.com/ENERGIA/ProjectsI/liquified-natural-gas-terminal-to-be-located-at-el-musel-gijon/en?pag=0&agno=&area=&categoria=ENERGIA_GAS&totalperpage=5 LIQUIFIED NATURAL GAS TERMINAL TO BE LOCATED AT EL MUSEL, GIJÓN] | # [http://www.sener-power-process.com/ENERGIA/ProjectsI/liquified-natural-gas-terminal-to-be-located-at-el-musel-gijon/en?pag=0&agno=&area=&categoria=ENERGIA_GAS&totalperpage=5 LIQUIFIED NATURAL GAS TERMINAL TO BE LOCATED AT EL MUSEL, GIJÓN] | ||
# [http://killajoules.wikidot.com/archive:enagas-has-recently-awarded-ikm-testing-spain-a-new Enagas has recently awarded IKM Testing Spain a new contract] | # [http://killajoules.wikidot.com/archive:enagas-has-recently-awarded-ikm-testing-spain-a-new Enagas has recently awarded IKM Testing Spain a new contract] | ||
+ | # [https://lng-news.blogspot.com/2023/03/enagas-has-acquired-reganosa-network-of.html Enagás has acquired the Reganosa network of natural gas pipelines, which will enter into the shareholding of El Musel Regasification Plant with 25%] | ||
+ | |||
+ | [[category:LNG]] | ||
+ | [[category:Spain]] | ||
+ | [[category:Endesa]] |
Latest revision as of 15:15, 5 March 2023
Contents
Summary Information
- Ownership: Enagas / Reganosa
- Website: http://www.enagas.es/
- Location: Near the city of Gijon in the province of Asturias, North Coast of Spain
- Capacity: million tons/annum
- Status: Under Construction
Brief Description
- A regasification terminal with two large tanks and unloading facilities for the largest tankers
Technical Details
- Storage capacity: two 150,000 cubic meter LNG tanks
- Unloading capacity: A jetty will allow the unloading of LNG carriers with a capacity up to 230,000 m3
- Send out capacity: 800,000 normal cubic meters/hour
- Constructor:
- **Fluor:** Detailed engineering, procurement services and construction management (EPCM)
- **Sofregaz-SENER:** Basic engineering
- **IKM Testing:** Pre-commissioning and commissioning contract
Ongoing Projects/Project Status
- The project has been postponed by order of the energy regulator
- Commissioning is expected in 2012
Suppliers / Customers
- Suppliers:
- Customers: The terminal will supply the domestic gas grid and two combined cycle power stations in the Asturia province
History
- 2006 - The Ministry of Industry awarded the terminal contract to Enagas
- 2008 - Fluor awarded EPC contract
- 2012 - IKM Testing awarded commissioning contract
- 2023 - Reganosa buys a 25% stake
Other Information
- The terminal is being built on land reclaimed from the sea
Links
- The new regasification plant in El Musel has been awarded to Enagas
- to Build New Enagas LNG Terminal on Spain's North Coast
- LIQUIFIED NATURAL GAS TERMINAL TO BE LOCATED AT EL MUSEL, GIJÓN
- Enagas has recently awarded IKM Testing Spain a new contract
- Enagás has acquired the Reganosa network of natural gas pipelines, which will enter into the shareholding of El Musel Regasification Plant with 25%