El Franig Gas Field
Jump to navigation
Jump to search
Summary Information
- Operator: Perenco
- Country: Tunisia
- Location: Central Tunisia
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- Production from the El Franig field is transported to the central processing facility in Oum-Chiah via 120km of pipeline. Condensate is transferred to the La Skhira terminal for export, and gas is delivered to the Gabes plant for domestic consumption.
+++ Contractors
- -
+++ History
- 2002 - Perenco acquired the field
- 2008 - El Franig-6 well was completed, the first frac in the reservoir
- 2010 - 1st successful shale fraccing on the El Franig field
+++ Geology
+++ Links