=== Brief Description ===
 
=== Brief Description ===
 
+
* The terminal will consist of two floating storage and regasification units (FSRU) and a jetty.
 +
* The vessels are Golar Igloo and the Eemshaven LNG installation
 +
* The incoming boats transporting LNG will moor ship-to-ship to the Golar Igloo for unloading
 +
* A new underground gas pipeline has been laid from the quay to Gasunie's existing network.
  
 
=== Technical Details ===
 
=== Technical Details ===
Line 16: Line 19:
 
* Send out capacity:
 
* Send out capacity:
 
* Constructor:
 
* Constructor:
 +
** New Fortress Energy: Golar Igloo
 +
** Exmar: Eemshaven LNG installation
  
 
=== Ongoing Projects/Project Status ===
 
=== Ongoing Projects/Project Status ===
 
+
* The terminal is expected to start operations later in 2022
  
 
=== Suppliers / Customers ===
 
=== Suppliers / Customers ===
Line 24: Line 29:
 
* Suppliers:
 
* Suppliers:
 
* Customers:
 
* Customers:
 +
** From Eemshaven, Gasunie will continue to ensure the onward transport of gas in the Netherlands via the national gas pipeline network.
 +
** Engie will buy 1 BCM per annum
  
 
=== History ===
 
=== History ===
  
 
* 2022 - All capacity for the terminal was sold out
 
* 2022 - All capacity for the terminal was sold out
 +
* 2022 - The terminal begaon operations
 +
* 2023 - Gasunie started a feasibility study on capacity expansion
  
 
=== Other Information ===
 
=== Other Information ===
Line 33: Line 42:
 
-
 
-
 
=== Links ===
 
=== Links ===
 +
# [https://abarrelfull.blogspot.com/2022/08/gasunie-charters-floating-lng-terminal.html Gasunie charters floating LNG terminal]
 +
# [https://abarrelfull.blogspot.com/2022/08/second-floating-lng-facility-contracted.html Second floating LNG facility contracted for Eemshaven]
 
# [https://lng-news.blogspot.com/2022/08/eemsenergyterminal-in-eemshaven.html EemsEnergyTerminal in Eemshaven completely 'sold out’: ENGIE becoming its new shipper]
 
# [https://lng-news.blogspot.com/2022/08/eemsenergyterminal-in-eemshaven.html EemsEnergyTerminal in Eemshaven completely 'sold out’: ENGIE becoming its new shipper]
 +
# [https://lng-news.blogspot.com/2022/09/eemsenergyterminals-fsrus-have-arrived.html EemsEnergyTerminal's FSRUs have arrived in Eemshaven]
 +
# [https://lng-news.blogspot.com/2022/09/first-natural-gas-available-from-new.html First natural gas available from new floating LNG terminal in Eemshaven in mid-September]
 +
# [https://abarrelfull.blogspot.com/2023/02/eemsenergyterminal-for-lng-out-of.html EemsEnergyTerminal for LNG out of the starting blocks]
 +
# [https://lng-news.blogspot.com/2023/02/continuing-study-to-expand-lng-capacity.html Continuing study to expand LNG capacity at Eemshaven and Maasvlakte; additional Terneuzen terminal not feasible]
 +
  
 
[[category:LNG]]
 
[[category:LNG]]
 
[[category:Netherlands]]
 
[[category:Netherlands]]
 +
[[category:Gasunie]]

Latest revision as of 15:42, 18 February 2023

Summary Information

  • Ownership: EemsEnergyTerminal (Gasunie)
  • Website: https://www.eemsenergyterminal.nl/
  • Location: Eemshaven port, Groningen province
  • Capacity: 6.0 million tons/annum
  • Status: Under construction

Brief Description

  • The terminal will consist of two floating storage and regasification units (FSRU) and a jetty.
  • The vessels are Golar Igloo and the Eemshaven LNG installation
  • The incoming boats transporting LNG will moor ship-to-ship to the Golar Igloo for unloading
  • A new underground gas pipeline has been laid from the quay to Gasunie's existing network.

Technical Details

  • Storage capacity:
  • Unloading capacity:
  • Send out capacity:
  • Constructor:
    • New Fortress Energy: Golar Igloo
    • Exmar: Eemshaven LNG installation

Ongoing Projects/Project Status

  • The terminal is expected to start operations later in 2022

Suppliers / Customers

  • Suppliers:
  • Customers:
    • From Eemshaven, Gasunie will continue to ensure the onward transport of gas in the Netherlands via the national gas pipeline network.
    • Engie will buy 1 BCM per annum

History

  • 2022 - All capacity for the terminal was sold out
  • 2022 - The terminal begaon operations
  • 2023 - Gasunie started a feasibility study on capacity expansion

Other Information

-

Links

  1. Gasunie charters floating LNG terminal
  2. Second floating LNG facility contracted for Eemshaven
  3. EemsEnergyTerminal in Eemshaven completely 'sold out’: ENGIE becoming its new shipper
  4. EemsEnergyTerminal's FSRUs have arrived in Eemshaven
  5. First natural gas available from new floating LNG terminal in Eemshaven in mid-September
  6. EemsEnergyTerminal for LNG out of the starting blocks
  7. Continuing study to expand LNG capacity at Eemshaven and Maasvlakte; additional Terneuzen terminal not feasible