Difference between revisions of "Eemshaven LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
Line 35: Line 35:
 
-
 
-
 
=== Links ===
 
=== Links ===
 +
# [https://abarrelfull.blogspot.com/2022/08/gasunie-charters-floating-lng-terminal.html Gasunie charters floating LNG terminal]
 
# [https://abarrelfull.blogspot.com/2022/08/second-floating-lng-facility-contracted.html Second floating LNG facility contracted for Eemshaven]
 
# [https://abarrelfull.blogspot.com/2022/08/second-floating-lng-facility-contracted.html Second floating LNG facility contracted for Eemshaven]
 
# [https://lng-news.blogspot.com/2022/08/eemsenergyterminal-in-eemshaven.html EemsEnergyTerminal in Eemshaven completely 'sold out’: ENGIE becoming its new shipper]
 
# [https://lng-news.blogspot.com/2022/08/eemsenergyterminal-in-eemshaven.html EemsEnergyTerminal in Eemshaven completely 'sold out’: ENGIE becoming its new shipper]

Revision as of 11:08, 10 August 2022

Summary Information

  • Ownership: EemsEnergyTerminal (Gasunie)
  • Website: https://www.eemsenergyterminal.nl/
  • Location: Eemshaven port, Groningen province
  • Capacity: 6.0 million tons/annum
  • Status: Under construction

Brief Description

  • The terminal will consist of two floating storage and regasification units (FSRU) and a jetty.

Technical Details

  • Storage capacity:
  • Unloading capacity:
  • Send out capacity:
  • Constructor:

Ongoing Projects/Project Status

  • The terminal is expected to start operations later in 2022

Suppliers / Customers

  • Suppliers:
  • Customers:
    • From Eemshaven, Gasunie will continue to ensure the onward transport of gas in the Netherlands via the national gas pipeline network.
    • Engie will buy 1 BCM per annum

History

  • 2022 - All capacity for the terminal was sold out

Other Information

-

Links

  1. Gasunie charters floating LNG terminal
  2. Second floating LNG facility contracted for Eemshaven
  3. EemsEnergyTerminal in Eemshaven completely 'sold out’: ENGIE becoming its new shipper