Difference between revisions of "Eemshaven LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 35: | Line 35: | ||
- | - | ||
=== Links === | === Links === | ||
+ | # [https://abarrelfull.blogspot.com/2022/08/second-floating-lng-facility-contracted.html Second floating LNG facility contracted for Eemshaven] | ||
# [https://lng-news.blogspot.com/2022/08/eemsenergyterminal-in-eemshaven.html EemsEnergyTerminal in Eemshaven completely 'sold out’: ENGIE becoming its new shipper] | # [https://lng-news.blogspot.com/2022/08/eemsenergyterminal-in-eemshaven.html EemsEnergyTerminal in Eemshaven completely 'sold out’: ENGIE becoming its new shipper] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:Netherlands]] | [[category:Netherlands]] |
Revision as of 11:06, 10 August 2022
Contents
Summary Information
- Ownership: EemsEnergyTerminal (Gasunie)
- Website: https://www.eemsenergyterminal.nl/
- Location: Eemshaven port, Groningen province
- Capacity: 6.0 million tons/annum
- Status: Under construction
Brief Description
- The terminal will consist of two floating storage and regasification units (FSRU) and a jetty.
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
- The terminal is expected to start operations later in 2022
Suppliers / Customers
- Suppliers:
- Customers:
- From Eemshaven, Gasunie will continue to ensure the onward transport of gas in the Netherlands via the national gas pipeline network.
- Engie will buy 1 BCM per annum
History
- 2022 - All capacity for the terminal was sold out
Other Information
-