* The Edradour discovery is located in Block 206/4a, in approximately 300 meters of water, 75 kilometers northwest of the Shetlands. | * The Edradour discovery is located in Block 206/4a, in approximately 300 meters of water, 75 kilometers northwest of the Shetlands. | ||
− | * The development plan consists of the conversion of the discovery well into a production well and a 16 kilometer production pipeline tied back to the main [[Laggan | + | * The development plan consists of the conversion of the discovery well into a production well and a 16 kilometer production pipeline tied back to the main [[Laggan and Tormore Gas Fields | Laggan-Tormore]] flowline. |
* The Glenlivet field is being developed as part of the project | * The Glenlivet field is being developed as part of the project | ||
* Edradour is expected to start up in the fourth quarter of 2017 and will reach a plateau of 17,000 barrels of oil equivalent per day (boe/d) with an estimated development cost of 340 million GBP. | * Edradour is expected to start up in the fourth quarter of 2017 and will reach a plateau of 17,000 barrels of oil equivalent per day (boe/d) with an estimated development cost of 340 million GBP. | ||
Line 29: | Line 29: | ||
* 2014 - Total announces the final investment decision | * 2014 - Total announces the final investment decision | ||
* 2014 - Dong sells 5% to Total | * 2014 - Dong sells 5% to Total | ||
+ | * 2015 - UK government approval granted | ||
* 2015 - Subsea contract awarded for Glenlivet | * 2015 - Subsea contract awarded for Glenlivet | ||
* 2017 - Ineos acquired a 20% stake from DONG | * 2017 - Ineos acquired a 20% stake from DONG | ||
Line 37: | Line 38: | ||
=== Links === | === Links === | ||
+ | # [[UK Oil and Gas Fields by Approval Date]] | ||
# [http://killajoules.wikidot.com/blog:344 Total: new gas and condensate discovery in the West of Shetland] | # [http://killajoules.wikidot.com/blog:344 Total: new gas and condensate discovery in the West of Shetland] | ||
# [http://killajoules.wikidot.com/blog:4306 EPC Offshore signs deal with Total on Edradour] | # [http://killajoules.wikidot.com/blog:4306 EPC Offshore signs deal with Total on Edradour] | ||
Line 46: | Line 48: | ||
# [https://abarrelfull.blogspot.com/2021/03/total-starts-up-production-of-edradour.html Total Starts-Up Production Of The Edradour & Glenlivet Fields In The West Of Shetland] | # [https://abarrelfull.blogspot.com/2021/03/total-starts-up-production-of-edradour.html Total Starts-Up Production Of The Edradour & Glenlivet Fields In The West Of Shetland] | ||
# [https://abarrelfull.blogspot.com/2021/03/ineos-to-buy-entire-oil-gas-business.html INEOS to buy the entire Oil & Gas business from DONG Energy A/S for a headline price of $1.05 billion plus $250m contingent] | # [https://abarrelfull.blogspot.com/2021/03/ineos-to-buy-entire-oil-gas-business.html INEOS to buy the entire Oil & Gas business from DONG Energy A/S for a headline price of $1.05 billion plus $250m contingent] | ||
+ | |||
+ | [[Category:Field]] | ||
+ | [[Category:UK]] | ||
+ | [[Category:Total]] |
Latest revision as of 13:35, 31 August 2023
Summary Information
- Operator: Total
- Country: UK
- Location: Block 206/4a, Atlantic, West of Shetland
- Partners: Total - 80%, Ineos - (20%).
- Production start: 2017 (Expected)
- Type: Gas and Condensate
- Estimated Reserves:
- Production Volume:
Description
- The Edradour discovery is located in Block 206/4a, in approximately 300 meters of water, 75 kilometers northwest of the Shetlands.
- The development plan consists of the conversion of the discovery well into a production well and a 16 kilometer production pipeline tied back to the main Laggan-Tormore flowline.
- The Glenlivet field is being developed as part of the project
- Edradour is expected to start up in the fourth quarter of 2017 and will reach a plateau of 17,000 barrels of oil equivalent per day (boe/d) with an estimated development cost of 340 million GBP.
Contractors
- **EPC Offshore:** Project management services
- **Technip:**
- fabrication and installation of 12” production pipelines, 6” MEG(1) pipeline complete with 2" piggy backed service line,
- supply and installation of steel tube umbilical,
- fabrication and installation of pipeline end manifold, flowline end termination, flexible tails
- and rigid well tie-in spools, as well as the installation of templates and manifolds provided by the client,
- rock dumping and pre-commissioning.
- **FMC Technologies:** Subsea equipment including manifolds and associated connections and controls equipment, wellhead systems, subsea tie back connection equipment and a subsea production tree
History
- 2011 - Edradour Gas and Condensate Field discovered
- 2014 - Total announces the final investment decision
- 2014 - Dong sells 5% to Total
- 2015 - UK government approval granted
- 2015 - Subsea contract awarded for Glenlivet
- 2017 - Ineos acquired a 20% stake from DONG
- 2017 - Both fields start production
Geology
- A Cretaceous reservoir
Links
- UK Oil and Gas Fields by Approval Date
- Total: new gas and condensate discovery in the West of Shetland
- EPC Offshore signs deal with Total on Edradour
- UK: Total launches Edradour development and acquires a 60% interest in Glenlivet
- Technip awarded large contract for the Edradour Subsea Development, West of Shetlands, UK
- FMC Technologies Awarded Subsea Systems Contract for Total's Edradour and Glenlivet Fields
- DONG Energy to divest 5% of West of Shetland Edradour field to Total - DONG Energy and Total to develop the Glenlivet and Edra
- Technip awarded subsea contract for the Glenlivet project, West of Shetlands, UK
- Total Starts-Up Production Of The Edradour & Glenlivet Fields In The West Of Shetland
- INEOS to buy the entire Oil & Gas business from DONG Energy A/S for a headline price of $1.05 billion plus $250m contingent