  1. Deka Offshore Gas Fields
    • DEKA (Denis – Kawaran) Subsea Field Development
    • Project Description: The project aims to develop Denis and Karawan areas by drilling 5 new wells and collecting the produced gas be PLEMs, and protecting the pipelines using HIPPS, and controlling the wells throw umbilicals, utilizing Subsea X-mas tree technology
    • Contract Type: Lump-sum for professional services
    • Scope of Services: Technical Support and issuance of technical evaluation report for project equipment suppliers
  2. Seth Gas Field
    • SETH Offshore Development Project 2011 / 2012
    • Project Description
      • The project aims to install a new platform in water depth of 83.3m at PTB Seth gas field in the Ras El Barr Concession West Nile Delta area (Mediterranean Sea), total field production flow rate is 4.5 MMSCMD.
    • Contract Type
      • EPC LSTK – Consortium of Enppi / Petrojet / Tecnomare
    • Scope of Services
      • Detailed engineering for topside facilities, procurement services and material supply and assistance for commissioning and startup
  3. GUPCO Rehabilitation Project
    • Project Description
      • The project aims to the Rehabilitation of BP offshore facilities including steel structural platforms, topside facilities and subsea pipelines. The offshore facilities consist of 9 complexes & 69 satellites (with an overall count of 119 platforms and 400 wells) and 1600 km of sub-sea pipelines. The aim of the overall rehabilitation project was to make sure that the whole system could safely operate for at least additional 25 years maintaining the best possible operating conditions and capacities. A qualitative risk based approach had been followed for the whole 119 platforms in order to evaluate the hazard of structural failure.
    • Contract Type
      • Professional services and cost plus for material & subcontractors
    • Scope of Services
      • _basic & detailed engineering, procurement services and construction management
    • 2005 / 2015
  4. Al Khafji Oil Field
    • Al-Khafji Field Development Phase 1, Offshore Facilities 2006 / 2012
    • Project Description
      • The field development for Khafji has been developed to maintain the maximum sustainable capacity of 300,000 Barrel Oil per Day and production of 125 Million Standard Cubic Feet Per Day of Associated gases, as well as, 50 Million Standard Cubic Feet Per Day gas lift, by installation of 6 new platforms, 8500 tons total structure weight and modification of 9 existing platforms, in addition to subsea pipelines with a total length of 110 kilometer sizing 24 inches, 28 inches, 36 inches and 42 inches and laying of 59 kilometer subsea cables.
    • Contract Type
      • EPC LSTK – Consortium
    • Scope of Services
      • Engineering, material supply, supervision of onshore structure fabrication & offshore laying/installation, overall management, consortium leader and commissioning & start-up


Hilal Re-Development Project (FEED Stage) 2010 / 2011

Project Description The project aims to replace the old Hilal platform which was damaged due to a ship Collision by installing a 4 legged, nine-slot normally unmanned production platform at 80 m water depth. Contract Type Lump-sum for professional services Scope of Services Front End Engineering Design (FEED) including engineering of the platform jacket, topsides and tie-ins to subsea pipelines, long lead requests for RFQs, project cost estimate and FEED technical package.

Amer 8 Platform and related Onshore & Offshore Facilities Development Project 2008 / 2013

Project Description The project aims to install a 4 legged, six-slot production platform with 1100 tons lift weight at 24 m water depth. The production capacity is 10,000 BPD. The platform is designed to support two risers & two J-tubes. The platform is equipped with Bell 412 helideck. Contract Type EPC – Consortium (Enppi/Petrojet/PMS) – Enppi (Leader) Scope of Services Basic & detailed engineering, procurement services, construction, offshore installation works, commissioning & start-up and overall management.


Re-Feed for Northwest October Field 2010 –2011

Owner / Client PETROSALAM (J.V. with Arabian Oil Company Ltd. - AOC) Project Description The project aims to develop of a single nine-slot platform with ESP, 10” subsea pipeline 22 km total length, and onshore receiving facilities at Gulf of Suez. Expected production rate 10,000 BOPD. The offshore platform will be installed by using the Mobile Offshore Application Barge (MOAB) system (design concept by Overdick GMBH – Germany) Contract Type Lump Sum for professional services Scope of Services Front End Engineering Design (FEED)

Global Re-Assessment of Structures in MM & BHPH 2009 / 2010

Project Description The re-assessment of the platforms structure consists of the following: 16 platforms 22 connecting bridges 3 support jackets 3 satellite platforms 54 wellhead platforms 4 flare systems Contract Type Lump-sum for professional services Scope of Services Engineering Services




Northwest October Field Development (FEED Stage) 2008 / 2009

Project Description The project aims to develop a single six-slot platform at the Gulf of Suez with ESP, subsea 8” multiphase pipeline, subsea 6” water injection pipeline and onshore receiving facilities within SUCO Ras Badran existing facility. The expected production rate is 6,000 BOPD. The onshore receiving facilities will have a three-phase production separator, metering equipments and onshore control room. The separated fluids will be further treated onshore. Contract Type Lump-sum for professional services – reimbursable for number of specialized studies (e.g. RAM, EIA, etc… Scope of Services Front End Engineering Design (FEED)

  1. North Idku Gas Field
    • North Idku Development Project - 2008 / 2010
    • Project Description:
#* The project aims to install two new platforms and topside facilities as well as the export pipeline and flow line systems at North of Idku in addition to the required modifications at WEPCO plant in Maadi. 
    • Contract Type: Lump-sum for professional services
    • Scope of Services: Engineering services for the platform structure and topside facilities including issuance of MRQ’s and participation in technical evaluation.
  1. Tuna Gas Field
    • TUNA Field Development 2008 / 2010
    • Project Description
#* PETROBEL intends 	to 	develop 	Tuna 	field 	at 	the Mediterranean Sea by installing a new platform (4-legged platform approx. 82 m of water) and connecting pipelines (24’’ subsea pipeline approx. 15 km from Tuna platform to new PLEM and eventually to the existing Denise-A SSIV and 32” P/L to onshore plant near T-NW2 existing platform) to support the production of 4.5 MMSCFD. 
    • Contract Type
#* EPC LSTK– Consortium of Enppi, Technomare and Petrojet 
    • Scope of Services
#* Detailed engineering, procurement services for subsea pipeline and material supply of topside facilities 

North Bardawil Development 2007 / 2008

Project Description The project aims to upgrade the Barboni Platform (topside and structure) to accommodate the new gas production of Assad and Zaraf fields, including a new sub-sea system, umbilical, control and subsea pipeline tied from Assad & Zaraf fields to Barboni platform, 14”, 25 km. Contract Type Lump-sum professional services Scope of Services Basic engineering review, detailed engineering and project management

Denise Platform 2006 / 2008

Project Description Upgrade of TNW2 existing platform to suit Denise gas field production, transmit additional capacity to onshore through 32” 61 Km offshore pipelines and 32” 1 KM onshore and upgrade of El Gamil onshore facilities. Contract Type Lump-sum for professional services Scope of Services Basic and detailed engineering and procurement services

Baltim-NW2 Platform 2003 / 2005

Project Description The project aims to install a 12-slots RULE platform with a capacity of 10 MMSCMD Gas. Gas, water, & condensate are transmitted onshore through 24”, 10” & 4” and subsea PLEM-2km distance Contract Type Lump sum for professional services Scope of Services Basic & detailed engineering and procurement services

  1. Rashid Oil Field
    • Rashid-2 Platform Project
    • Project Description
      • The project aims to install 4 legged unmanned steel jacket platform located at Rosetta 49 m water deep with a capacity of 265 MMSCFD and weighing 450 tons. The gas is transmitted through a 24” subsea pipeline to the onshore terminal for final processing, along with 3 (1X70 mm2) XLPE 12/20 KV 61 KM submarine cable with optical fiber bundle.
    • Contract Type - Lump-sum for professional services
    • Scope of Services - Basic & detailed engineering and procurement services
    • Date - 2003 / 2004


Semman Field Development 2006 / 2008

Project Description Installation of new Semman platform (tripod plus deck) and laying of new 18” sea line from Semman to existing Darfeel platform with total length 20 Km. Contract Type Professional services reimbursable Scope of Services Basic engineering review, detailed engineering and procurement services


Al Hamd Platform 2004 / 2005

Project Description The project aims to install 1000 tons well head platform at 37 m water depth with a capacity of 12,000 BPD crude oil. The production is transmitted onshore through an 8" pipeline and submarine power cable at Ras Bakr. Contract Type EPC main contractor: Lump sum for professional services, construction, and offshore fabrication works disbursable for material supply Scope of Services Basic & detailed engineering, procurement services, construction, offshore fabrication works, commissioning, start-up, and overall management


Offshore North Sinai Field Development ONS 2005 / 2007 - NOSPCO

Project Description Development of Tao offshore gas field, 60 km north of Rommana producing 130 MMSCFD of gas. The development includes offshore production wells, production platform, submarine pipeline, onshore gas treatment plant and sales gas pipeline, in addition to gas dehydration. Contract Type Lump-sum for professional services and disbursable for material supply Scope of Services Detailed engineering for offshore topside facilities and onshore gas central processing facility, overall procurement services except pipelines and offshore structure steel, and construction supervision



Temsah – 4 Platform 2005 / 2007

Project Description The project aims to install 4 legs, 12-slot unmanned fixed offshore production platform at 85 m water depth with a capacity of 10 MMSCFD gas plus 3000 BBLD condensate. Contract Type Lump-sum for professional services Scope of Services Basic & detailed engineering and procurement services



Barboni Platform 2003 / 2005

Project Description The project aims to install a new platform at 91 m water depth, capacity of 4.4 MMSCMD. Gas is transmitted to Noras P.L.E.M. through 26” subsea pipeline. Contract Type Lump-sum for professional services Scope of Services Basic & detailed engineering and procurement services




Baltim-N Platform 2003 / 2005

Project Description The project aims to install 4 legs 9-slots tubular steel frame jacket, and a fixed offshore production platform with a Capacity of 4.7 MMSCMD Gas. Gas & condensate are directed to Baltim east existing platform through an 18" Pipeline. Contract Type Lump sum for professional services Scope of Services Basic & detailed engineering and procurement services


Simian / Sienna Control Platform 2002 / 2004

Project Description Development of the Simian / Sienna field through deep water subsea facilities, tied back to the existing Scarab / Saffron offshore pipeline system - control platform – upgrading / modification onshore gas plant facilities. Contract Type Lump-sum (Subcontract services to Technip) Scope of Services Engineering for the platform structure and utilities, in addition to platform control system

  1. Scarab Saffron Gas Field
    • West Delta Deep Marine Concession Scarab / Saffron Development Project
    • 2000 / 2003
    • Project Description
#* Development of the deep marine Scarab / Saffron field located 90 km offshore the West Delta Coast to produce 600 MMSCFD of gas. The production is transmitted through two P/L systems to onshore long distance subsea tieback. 
    • Contract Type
#* Reimbursable man-hours
    • Scope of Services
#* FEED scope by INTEC supported by Enppi’s engineering specialists (pipeline, instrumentation & offshore structures) 
  1. Ras El Barr Concession Oil and Gas Fields
    • West Akhen Field Development 2001 / 2003
    • Project Description:
#* The project aims to install a 6-slot 4-pile fixed offshore platform at 82m water depth in the Mediterranean Sea with one full deck producing 80 MMSCFD gas plus 4500 B/D condensate and installation of 3” glycol, 6” condensate, and 14” gas subsea pipelines connecting West Akhen. 
#* Contract Type: Lump-sum for professional services
#* Scope of Services: Detailed engineering, construction support engineering and installation analysis for the offshore platform structure (Jacket – with launching configuration – deck, piles and 

appurtenances) plus three subsea pipelines

  1. Rosetta Gas Field
    • Rosetta Field Development 1999 / 2001
    • Project Description
#* The project aims to install offshore production platform with a capacity of 275 MMSCFD. Gas is transmitted through a 24” gas subsea P/L 67 km to onshore terminal.
    • Contract Type:
#* Lump-sum for basic & detailed engineering, reimbursable for construction supervision, commissioning & start-up assistance
    • Scope of Services
#* Basic & detailed engineering, procurement services, construction supervision, commissioning & start-up assistance 



North July Offshore Field Development 1999 / 2000

Project Description Offshore facilities to develop north July field comprising a Tripod-3 Slots Platform at 52m water depth initially including Christmas trees, well head control panel, production & test manifold. The NJ-10 & GUPCO offshore facilities shall be connected through an 8”, 9 km pipeline. GUPCO offshore J-10 shall be modified to include the three-phase separator, gas & liquid metering equipped with common prover to accommodate the production of Fanpetco NJ-1. Contract Type Reimbursable for professional services Scope of Services Basic and detailed engineering work for FANPETCO facilities; including offshore platform and pipeline. In addition to engineering of tie-Ins to GUPCO facilities on J-10, and study to investigate adequacy of the J-10 flare and blow down system to accommodate the new FANPECTCO production.


A/Q Phase II Topside Facilities 1990 / 1992

Project Description The projects aims to install a new production platform (six legged) at 35m water depth. The platform is equipped with process and utility facilities for 150 MMSCFD and connected to the existing platform through a 45m bridge. Contract Type Lump-sum turnkey Scope of Services EPC turnkey, detailed engineering of topsides, structural modifications of existing platform, weight control, procurement services, load out of fully equipped deck, commissioning & start-up



A/Q Offshore Gas Compression (Utility Modules) 1993 / 1995

Project Description The project aims to install two new gas compression platforms A/Q P1-C and A/Q P2-C. The platforms are connected through a bridge to the existing P1 & P2 platforms at 20m water depth. The platforms support two turbo compressor trains and associated process & utility topside facilities. Contract Type Lump-sum Scope of Services Detailed engineering of topsides, structural modifications and procurement services for the utility / process modules


North AMER Offshore Platform 1986 / 1987

Project Description Two offshore wellhead platforms at water depths 62m and 64m; topside includes work over rig, suction pump, pig launcher manifold, X-MAS trees and power generation package Contract Type Lump-sum for professional services Scope of Services Basic & detailed engineering of jackets, deck and topsides, in addition to sea bed survey and soil investigation

  1. Belayim Oil and Gas Field
    • Repair of Belayim Offshore Installations, 3 Phases Project - 1989 / 1992
    • Project Description:
#* 1st Phase: Data bank generation and cathodic protection retrofitting for 40 of Belayim  offshore installations, repair intervention of 13 installations, including 3 platforms  and 10 templates. 
#* 2nd Phase: Structural re-qualification and repair intervention for 7 installations including 3 platforms, 1 cluster and 3 templates.
#* 3rd Phase: Structural re-qualification and repair intervention of 23   installations including 5 platforms, 4 clusters and 13 templates. 
    • Contract Type: Reimbursable for phase 1 and Lump-sum for phase 2 & 3
    • Scope of Services:
#* Detailed engineering including structural analysis assessment, repair works, long term inspection plan, maintenance and repair program, tender package preparation, technical bid evaluation and construction supervision.
#* Repair work interventions budgetary cost estimate. 

   	 

Transgulf Gas Utilization Project (Phase I) 1991 / 1994

Project Description The project aims at transporting and processing 107 MMSCFD of associated gases at GUPCO Ras Bakr processing unit. The gases are collected from Belayim fields in Sinai and GUPCO offshore October field. Contract Type Lump-sum turnkey for services, reimbursable for materials and construction Scope of Services Techno-economic study, basic and detailed engineering for onshore facilities and 12” diameter sub-sea pipeline, procurement services, construction supervision, overall management commissioning & start-up


SIDKY “B” Platform Topside Facilities 1992 / 1993

Project Description Topside facilities to produce 10 000 b/d of crude oil and 24 MMSCFD of associated gases Contract Type Lump-sum Scope of Services Detailed engineering for topsides including:

- Supply of material & equipment  - Commissioning & start-up assistance 



  1. Belayim Oil and Gas Field
    • Belayim Incremental Recovery - 1991 / 1993
    • Project Description:
#* Installation of 2 unmanned platforms mwp-3 & mwp-4 at 34 & 37 m water depths 
#* The project also included:  
#* 8” production subsea pipeline 
#* 6” test subsea pipeline
#* Two water injection subsea pipeline (8”& 4”) 
#* Two submarine electrical cables from mwp-4 to mwp-3 
    • Contract Type: Lump-sum Scope of Services
#* Basic & detailed engineering of topsides, including procurement assistance for mwp-3 & mwp-4 platforms 


Ras Ghara Production Facilities (Phase I, II) 1990 / 1992

Project Description Ras Ghara oil field development to produce 10 000 BSD, comprising: - Offshore platform & topside facilities - On/offshore launching / receiving traps - Onshore production facilities, utilities & power generation - 104 km onshore transfer pipeline to Petreco area - 6"/10" 3 km sub-sea pipeline - Tie-ins to the existing storage facilities Contract Type Reimbursable Scope of Services  Techno Economic Study (Phase I)  Project Management (Phase II)  Inspection Services (Phase II)


Gemsa Crude Field Development 1990 / 1991

Project Description - Installation of prefabricated deck on the existing piles - 8”, 12 km subsea pipelines Contract Type Reimbursable Scope of Services Basic & detailed engineering of jacket, decks, topsides, and subsea pipelines


A/Q Phase II Offshore Gas Production 1983 / 1985

Project Description The project aims to install a 6 legged production platform (P2) at 20m water depth. The platform production capacity is 125 MMSCFD and transmitted through a 20 km subsea pipeline. Contract Type Reimbursable Scope of Services Project management including construction management, supervision, and start-up services


  1. Belayim Oil and Gas Field
    • Belayim Topside Facilities 1984 / 1985
    • Project Description
#* Topside facilities on four new installed platforms & modifications of the topside of four existing platforms to upgrade oil production to 200 000 B/D and separate 60 MMSCFD of associated gas. 
    • Contract Type
#* Reimbursable 
    • Scope of Services
#* Project management including construction management and supervision, engineering review, commissioning, and start-up assistance 