Difference between revisions of "ELNG IDCO LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Ownership: Egyptian Lng * Website: http://www.egyptianlng.com/ * Location: 3 kilometres away from the town of Idku and 40 kilometers east of Alexandria...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Ownership: Egyptian Lng | * Ownership: Egyptian Lng | ||
Line 7: | Line 7: | ||
* Status: In Operation | * Status: In Operation | ||
− | + | === Brief Description === | |
* A large LNG processing terminal | * A large LNG processing terminal | ||
− | + | === Technical Details === | |
* Storage capacity: | * Storage capacity: | ||
* Constructor: Bechtel | * Constructor: Bechtel | ||
− | * Licensor: | + | * Licensor: [[Phillips Optimised Cascade LNG Process | Conocophillips]] |
− | + | === Ongoing Projects/Project Status === | |
* | * | ||
− | + | === Suppliers / Customers === | |
* Suppliers: BG Group and partners supply Trains 1 and 2 of Egyptian LNG with gas from the [[[Simian Sienna Gas Field]]] and [[[Sapphire Gas Field]]] | * Suppliers: BG Group and partners supply Trains 1 and 2 of Egyptian LNG with gas from the [[[Simian Sienna Gas Field]]] and [[[Sapphire Gas Field]]] | ||
* Customers: Gaz de France, BG Gas Marketing | * Customers: Gaz de France, BG Gas Marketing | ||
− | + | === History === | |
* 2000 - Agreement reached on Egypt LNG Export Project | * 2000 - Agreement reached on Egypt LNG Export Project | ||
* 2001 - Front End Engineering and Design (FEED) contract awarded to Bechtel | * 2001 - Front End Engineering and Design (FEED) contract awarded to Bechtel | ||
Line 29: | Line 29: | ||
* 2005 - Terminal came on stream | * 2005 - Terminal came on stream | ||
− | + | === Other Information === | |
* The plant was built by Bechtel | * The plant was built by Bechtel | ||
* The Egyptian LNG facilities, located at Idku, comprise the two LNG production trains and include the common facilities such as storage tanks, loading jetty and utilities. There is sufficient space at the Idku site for a further four LNG trains. The commercial structure of Egyptian LNG has been designed to allow future expansion without the need to involve all existing partners, and it is possible that third parties could supply gas to future Egyptian LNG trains. | * The Egyptian LNG facilities, located at Idku, comprise the two LNG production trains and include the common facilities such as storage tanks, loading jetty and utilities. There is sufficient space at the Idku site for a further four LNG trains. The commercial structure of Egyptian LNG has been designed to allow future expansion without the need to involve all existing partners, and it is possible that third parties could supply gas to future Egyptian LNG trains. | ||
Line 35: | Line 35: | ||
− | + | === Links === | |
# [http://www.bg-group.com/OurBusiness/WhereWeOperate/Pages/pgEgypt.aspx BG Group Egypt Operations] | # [http://www.bg-group.com/OurBusiness/WhereWeOperate/Pages/pgEgypt.aspx BG Group Egypt Operations] | ||
# [http://killajoules.wikidot.com/archive:bg-and-partners-agree-principal-terms-for-egyptian-l BG and partners agree principal terms for Egyptian LNG Train 2] | # [http://killajoules.wikidot.com/archive:bg-and-partners-agree-principal-terms-for-egyptian-l BG and partners agree principal terms for Egyptian LNG Train 2] | ||
# [http://killajoules.wikidot.com/archive:agreement-reached-on-egypt-lng-export-project Agreement reached on Egypt LNG Export Project] | # [http://killajoules.wikidot.com/archive:agreement-reached-on-egypt-lng-export-project Agreement reached on Egypt LNG Export Project] | ||
# [http://killajoules.wikidot.com/archive:front-end-engineering-and-design-feed-contract-award Front End Engineering and Design (FEED) contract awarded for Egyptian LNG] | # [http://killajoules.wikidot.com/archive:front-end-engineering-and-design-feed-contract-award Front End Engineering and Design (FEED) contract awarded for Egyptian LNG] | ||
+ | |||
+ | [[category:LNG]] | ||
+ | [[category:Egypt]] | ||
+ | [[category:Petronas]] |
Revision as of 14:38, 21 January 2023
Contents
Summary Information
- Ownership: Egyptian Lng
- Website: http://www.egyptianlng.com/
- Location: 3 kilometres away from the town of Idku and 40 kilometers east of Alexandria on the Egyptian Mediterranean coast
- Capacity: 7.2 million tons/annum
- Status: In Operation
Brief Description
- A large LNG processing terminal
Technical Details
- Storage capacity:
- Constructor: Bechtel
- Licensor: Conocophillips
Ongoing Projects/Project Status
Suppliers / Customers
- Suppliers: BG Group and partners supply Trains 1 and 2 of Egyptian LNG with gas from the [[[Simian Sienna Gas Field]]] and [[[Sapphire Gas Field]]]
- Customers: Gaz de France, BG Gas Marketing
History
- 2000 - Agreement reached on Egypt LNG Export Project
- 2001 - Front End Engineering and Design (FEED) contract awarded to Bechtel
- 2002 - Construction of the plant began
- 2005 - Terminal came on stream
Other Information
- The plant was built by Bechtel
- The Egyptian LNG facilities, located at Idku, comprise the two LNG production trains and include the common facilities such as storage tanks, loading jetty and utilities. There is sufficient space at the Idku site for a further four LNG trains. The commercial structure of Egyptian LNG has been designed to allow future expansion without the need to involve all existing partners, and it is possible that third parties could supply gas to future Egyptian LNG trains.