EIED Oil and Gas Projects

From A Barrel Full
Jump to navigation Jump to search
  1. Siraf Refinery Complex Project
    • 8 Refineries of 60,000 BPD
    • 2015-2018
    • SIRAF Condensate Refineries
    • Basic Design (Cooperation with TOYO after 2016.03)
  2. Condensate Refinery Farzanegan. P. S.E. Z (Asaluyeh) 40,000 BPD 2015-2018 Farzanegan Fars Nikoo Basic Engineering Design
  3. PDH Kangan – 2017-2018 Oil Industries Engineering Co. (OIEC) Feasibility Study
  4. 5 Stations T.C. re-Installastions Qazvin/Khoramdare, Parchin, Semnan, Nizar Qom 3 5 Stations Gas Compressor 2016-2018 Iranian Gas Engineering & Development Co. (IGEDC) Management & Site Supervision for Installation of Spare T.C. of five Stations
  5. South Pars Gas Field Development – Phases 17&18 Assaluyeh 1,000 MMSCFD Natural Gas 2×40,000 BBLS/D Condensate 2006-2016 Pars Oil & Gas Company (POGC)/ OIEC Basic Design Review, Detail Design, Procurement Engineering Services, Field Engineering Services
  6. Kian Petrochemical 1395 KTPA Aromatic &2236 KTPA Olefin 2016-2017 Kian Petrochemical Company Conceptual Study (Cooperation with Axens)
  7. North-Northeast Six Gas Compressor Stations 58, 57, 54, 52, 30, 30 MMSCMD 2007 IGEDC MC & SSC
  8. Heavy Oil Refinery Production and Lights Bitumen 1000000 TN Bitumen 2015 IPMI Feasibility Study
  9. TGTU of South Pars Gas Field Development– Phases 2 & 3, Assaluyeh 2 ´ 130 Ton/day, Liquid sulphur from acid gas TGTU 95% to 99.7% efficiency 2012 (Hold by Owner) Pars Oil & Gas Company (POGC) EPC
  10. Tabriz Refinery
    • Gasoline Production Plant, Tabriz
    • 20,000 BPSD 2007-2013
    • Tabriz Oil Refinery Co.
    • EPCC, Partnership with SEI (China), Construction with TANAVOB
  11. Ilam HDPE Plant, Ilam 300,000 t/y, HDPE 2004-2013 Ilam Petrochemical Company EPCC, Partnership with MES (Japan)
  12. Mahshahr Jetty No.2 – 2008-2010 Mahshahr, Petrochemical Special, Economic Zone, Management MC & SSC
  13. Hormoz Heavy Oil Refinery
    • 300,000, BBL/D
    • 2008-2012
    • (Hold by Owner) NIOEC EPC (as a member of consortium), Part of Utility & Offsite unites
  14. Tehran Refinery
    • Products Quality Upgrading Plant
    • 80,000 BBL/D,
    • De-sulfurization
    • 2007-2012
    • NIOEC
    • MC & SSC
  15. Pars Polystyrene Plant, Assaluyeh 250, 000 t/y, Polystyrene 2005-2008 (Hold by Owner) Pars Petrochemical, Company EPCC, Partnership with Simon Carves (UK)
  16. Sirri Island, Gas Gathering & NGL Recovery 50 MMSCFD Natural Gas, 6,900 BPD Propane, 3,750 BPD Butane, 3,180 BPD Condensate 2004-2007, (Engineering) IOOC/NIOC Basic Design Review, Detail Design, Procurement Engineering Services, Field Engineering Services
  17. Bid Boland II Gas Processing & Pipiline 57 MMSCMD 2007-2012 IGEDC MC & SSC
  18. Day & Sepid Zakhur, Gas Field Development – 2009-2011 ICOFC MC & SSC
  19. Khuzestan Extra Heavy Crude Oil Refinery 180,000, BPSD 2008-2009 NIOEC Basic Design
  20. Darquain Oil Field Development-Phase 2 2 ´ 55000, BPSD 2007-2009 PEDEC MC & SSC
  21. South Pars Gas Field Development Project, Phases 9 & 10, Bandar Assaluyeh 2 ´ 1,000 MMSCFD Natural Gas 2 ´ 40,000 BBLS/D Condensate 2004-2008 Pars Oil & Gas Company (POGC) FES, Field Engineering Services
  22. South Pars Gas Field Development Project – Phases 9 & 10, Assaluyeh 2 ´ 1,000 MMSCFD Natural Gas 2 ´ 40,000 BBLS/D Condensate 2003-2006 Pars Oil & Gas Company (POGC) Detail Engineering and Procurement Engineering Services, As Engineering Sub-Contractor of OIEC
  23. Qom-III Gas Compressor Station 90 MMSCMD 2004-2006 NIGC Complete Basic Design, Detail Engineering and Engineering Services of Procurement
  24. Four Gas Compressor Stations – North West 4 ´ 60 MMSCMD 2006-2007 NIGC SSC, Site Supervision Contractor
  25. Six Gas Compressor Station 87,87,90,90, 90,160 MMSCMD 2002-2005 NIGC SSC, Site Supervision Contractor
  26. Consulting Services To “MATN” – 2005-2006 PEDEC, “MATN” Consulting Engineering Services
  27. Acetic Acid Plant, Mahshahr 150,000 t/y, Acetic Acid 2003-2006 Fanavaran, Petrochemical Company FES (Field Engineering Services)
  28. 7th Olefin Plant, Mahshahr 1,100,000 t/y, Ethylyne 200000 t/y propylene 2001- 2005 Maroun Petrochemical Company (MPC) SSC, Site Supervision Contractor
  29. 4th Aromatic, Bandar Assaluyeh 750,000 t/y Paraxylene 2002-2005 Borzuyeh Petrochemical Company (BPC) MC, Partnership with Foster Wheeler
  30. Petrochemical Storage Facilities Lots of and facilities Storage Tanks 2004-2005 PIDMCO FES, Field Engineering Services
  31. Six Gas Compressor Stations 87, 87, 90, 90,90, 160 MMSCMD 2002-2004 NIGC Complete Basic Design, Detail Engineering and Engineering Services of Procurement
  32. Acetic Acid Plant, Bandar Imam 150,000 t/y Acetic Acid 2001-2004 Fanavaran Petrochemical Company Detailed Engineering, Procurement and Technical Assistance Services, 29Partnership with GS
  33. Petrochemical Storage Facilities, Bandar Imam Lots of and facilities Storage Tanks 2002-2004 PIDMCO Complete Basic Design, Detail Engineering and Procurement Services
  34. 7th Olefin Plant, Mahshahr 1,100,000 t/y, Ethylene 200,000 t/y, Propylene 2000-2004 Marun Petrochemical Company (MPC) Detailed Engineering, Procurement Partnership with Linde
  35. NGL 1300 180, MMSCFD, of Feed Gas 4400 BBIS/D,of Feed Condensate 1999- 2003 NPC Detailed Design, Procurement Services, Pre-Comm. & Commissioning Supervision
  36. NGL 1200 260, MMSCFD, Of Feed Gas 1999- 2003 NPC Detailed Design, Procurement Services, Pre-Comm. & Commissioning Supervision
  37. Turkmenbashy Refinery
    • Gasoline unit MSCC, LPG & Gasoline
    • Merox Units 24,000, BPSD Gasoline
    • 1999-2000
    • NIOEC Detail Design, and Procurement, Services
  38. 6th Olefin Plant, Mahshahr 520,000 t/y, Ethylene 154,000 t/y, Propylene 1998- 2003 Amirkabir Petrochemical Company (AKPC) Detailed Engineering , Procurement & Field Engineering Services, Partnership with Linde
  39. Noor Abad Gas Compressor Station 86, MMSCMD 2001-2003 OIEC/NIGC Complete Process Basic Design, and Detail Design
  40. S3 & S6 Gas Compressor Stations 90MMSCMD, For S3 station, & 62MMSCMD for S6 Sstation 2000-2002 NIGC Basic Design for Civil & Structural Discipline and Complete Detail Engineering
  41. Norooz Oil Field Master Development Plan Altern.A 90,000 BFPD Altern B 120,000 BFPD 1998-1999 Repsol Exploration Pre- Basic Design, for the total Surface Facilities
  42. South Pars Gas Field Development Phase 1, Stage 2 – 1997-1998 PEDEC Detailed Design (Terminated At 50% Progress)
  43. Norooz Oil Field Renovation the Persian Gulf Offshore & Onshore 90,000 BBL/D 1997-1998 NIOC Offshore Extended Basic Design
  44. Khangiran Gas Treating Plant Phase II, Khangiran Two GTU One SRU & Utility Expansion 1996-1999 NIGC Basic Design Review, Detailed Design, Procurement Services & Technical Support
  45. NGL-600 – 1996-1998 DICE Supervision of Plant Installation
  46. Gachsaran Gas Treating and Injection, Gachsaran – 1995-1998 NIOC Basic Design Review, Detailed Design, Procurement Services & Technical Support
  47. Tehran Refinery
    • Waste Water Treatment
    • 1995-1998
    • Tehran Refinery
    • Optimization Study
  48. Sarkhun II Gas Refinery Gas Sweetening Unit 1000 – 1995-1998 NIGC Basic & Detailed Design Technical Assistance
  49. Tabriz Petrochemical Complex, Tabriz HVAC Engineering 1995-1998 Tabriz Petrochemical Complex Detailed Design and Procurement Services
  50. Iran Gas Europe Altern. A LNG Altern. B Pipeline, Iran- Europe A:10 LNG Trains each 2.5 million t/y, B: 35 bncm/ySales Gas 1995-1996 Linde Feasibility Study
  51. ISO Standards Translation – 1995-1996 Plan & Budget, Organization Translation of 137 ISO Standards in to Farsi
  52. Norooz Oil Field Living Quarters, the Persian Gulf – 1995-1996 NIOC- offshore Basic Engineering
  53. Master Development Plan for Kharg, Siri, Lavan Islands, & Bahregan Oil Centre, the Persian Gulf – 1995-1996 NIOC- offshore Engineering
  54. Foundation of Drilling Rigs, Kharg Island – 1995-1996 NIOC- Offshore Engineering & Tech. Support
  55. 1.33 Million Barrel Crude Oil Storage Tank, Kharg Island 1.33 Million Barrel Crude Oil 1995-1996 NIOC-Offshore Engineering
  56. Dorood Oil Field Development in the Persian Gulf – 1995-1996 NIOC- Offshore Engineering & Tech. Support
  57. Arak Lube Oil Arak – 1995 Bonyad Mostazafan Feasibility Study
  58. NGL 1200 &1300 Plants, Gachsaran Bibi Hakimeh – 1995 NIOC- Onshore Preliminary Engineering Study
  59. Pak Arab Refinery
    • Pakistan Iran- Pak Refinery
    • 1995-1996
    • NIOC- PERAK
    • Engineering, Preparation of Tender Document
  60. South Pars Gas Field Development (phase-1) – 1995-1997 PEDEC Conceptual Study & Basic Design
  61. Tehran Refinery,
    • Modernisation of Control Systems
    • 1995
    • Tehran Refinery NIOC
    • Basic Design & Optimization Study
  62. Furfural Unit, Tehran Pars Oil Refinery, Tehran– 1994 -1996 Pars Oil Company Contribution in Detailed Design (Renovation & Capacity Increase)
  63. Aromatic Unit, Bandar Imam Petrochemical Company, Bandar Imam – 1994-1998 BPC Site Activities, Supervision, Technical Services, Field Engineering & Engineering support
  64. Esfahan Pipeline River Crossing Bridges Karoon, Jarahi, Zayandehrood River – 1994-1997 NIOC Design Of Bridges & River Crossing (Basic & Detailed Design)
  65. Sarkhun Pump Station 12,000, BBL/D 1993-1998 NIGC Basic and Detailed Design Engineering & Technical Assistance
  66. Ahwaz Pipeline Facilities Pump Station for Mile 40 Ahwaz & Tabriz Pipeline, Pump Station for Tabriz-Sarab-Ardabil Pipeline Technical Service (200,000 BBL/D) 1993-1995 NIOC Basic and Detail Design Engineering & Procurement Services, Basic and Detailed Design Engineering & Procurement Services
  67. Esfahan Polyacryle Complex, Esfahan Air Pollution Control & Recovery System Optimization of Monomer in Polyacryle Co. 1992-1993 1994-1998 Iran Polyacryle Company Basic and Detailed Engineering.
  68. Khoramabad Nyl-Iran Tire Production Co. , Khoramabad – 1992-1993 Bank of Industry and Mines of Iran Optimization Study for the Use of Nylon Fibbers in the Tire Industry
  69. Tehran Planning & Information System Design Management Services 1992-1994 Hormozgan Cement Co. Design and Development of Project Planning and Controlling System
  70. Pakistan/Iran Pak Refinery – 1992-1993 ABB Lummus Crest (Germany) Feasibility Studies
  71. Ninth (Condensate) Refinery, Bandar Taheri 70,000 BBL/D, DCS Control, The Refinery Includes DEA Gas Treater 1991-1993 NIOC Complete Basic Design of Condensate Refinery
  72. Khorasan Petrochemical Complex, Bojnurd, Khorasan – 1990-1991 Khorasan Petrochemical Complex Consultancy Services for the Entire Complex
  73. Esfahan Petrochemical Complex, Esfahan 7,500 BPD 1990-1991 Esfahan Petrochemical Complex Basic & Detailed Design of Feed Facilities
  74. Arak Refinery
    • Arak
    • 21,600 BPD,
    • DCS Control
    • 1990-1991
    • TPL, Italy
    • Detailed Design NHT/CCR Platformer Units
  75. L.A.B Complex, Esfahan 12,000 BPD 1988-1991 Iran Chemical Industries Investment Company Basic & Detailed Engineering of Feed facilities Design
  76. Iranian Petroleum Standards (IPS) Preparation of Standards in all Related Fields For the Ministry of Petroleum 1988-1996 NIOC 398 Standards With More Than 20,000 Pages in 12 Work Disciplines
  77. Bandar Abbas Refinery
    • Bandar Abbas
    • Two Separate Trains, each 116,000 BBL/D Vacuum Unit Capacity 63,000 BBL/D
    • 1988-1990
    • 1990-1997
    • Snamprogetti Italy - Basic & Detailed Design of Vacuum & Atmospheric Distillation Unit