Difference between revisions of "Dvalin Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 31: | Line 31: | ||
* 2022 - PDO submitted for Dvalin North | * 2022 - PDO submitted for Dvalin North | ||
− | === Geology | + | === Geology === |
* Dvalin consists of two separate structures, Dvalin East and Dvalin West. Both discoveries contain gas in Middle Jurassic sandstones of the Garn and Ile Formations. | * Dvalin consists of two separate structures, Dvalin East and Dvalin West. Both discoveries contain gas in Middle Jurassic sandstones of the Garn and Ile Formations. | ||
=== Links === | === Links === | ||
# [http://factpages.npd.no/ReportServer?/FactPages/PageView/discovery&rs:Command=Render&rc:Toolbar=false&rc:Parameters=f&NpdId=18229140&IpAddress=185.40.73.253&CultureCode=en 6507/7-14 S DVALIN, NPD] | # [http://factpages.npd.no/ReportServer?/FactPages/PageView/discovery&rs:Command=Render&rc:Toolbar=false&rc:Parameters=f&NpdId=18229140&IpAddress=185.40.73.253&CultureCode=en 6507/7-14 S DVALIN, NPD] | ||
− | # [https:// | + | # [https://wintershalldea.no/en/where-we-are/dvalin Dvalin, Wintershall Dea] |
# [http://killajoules.wikidot.com/archive:aker-solutions-wins-subsea-contracts-for-dvalin-gas Aker Solutions Wins Subsea Contracts for Dvalin Gas Field] | # [http://killajoules.wikidot.com/archive:aker-solutions-wins-subsea-contracts-for-dvalin-gas Aker Solutions Wins Subsea Contracts for Dvalin Gas Field] | ||
# [http://killajoules.wikidot.com/archive:technip-awarded-important-contract-for-dvalin-subsea Technip awarded important contract for Dvalin subsea development] | # [http://killajoules.wikidot.com/archive:technip-awarded-important-contract-for-dvalin-subsea Technip awarded important contract for Dvalin subsea development] | ||
# [https://abarrelfull.blogspot.com/2023/01/dvalin-commercial-production-delayed.html Dvalin commercial production delayed] | # [https://abarrelfull.blogspot.com/2023/01/dvalin-commercial-production-delayed.html Dvalin commercial production delayed] | ||
# [https://abarrelfull.blogspot.com/2023/01/wintershall-dea-submits-plan-for.html Wintershall Dea submits plan for development of the Dvalin North gas field] | # [https://abarrelfull.blogspot.com/2023/01/wintershall-dea-submits-plan-for.html Wintershall Dea submits plan for development of the Dvalin North gas field] |
Revision as of 14:43, 5 January 2023
Contents
Summary Information
- Operator: DEA
- Country: Norway
- Location: Norwegian Sea
- Production start: First gas is expected in 2023
- Partners: DEA Norge AS (40%), Edison (20%), Maersk Oil Norway AS (20%), OMV Norge (20%)
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The Dvalin gas field was previously known as Zidane, consists of two separate structures: Dvalin East and Dvalin West. The water depth is 400 metres.
- The field is located in Production Licence (PL) 435, approximately 15 kilometres northwest of the Heidrun field and 35 kilometres south of the Skarv field in the Norwegian Sea.
- The development concept is a subsea template with four gas producers tied back to the Heidrun platform.
- Gas from the field will be transported via Heidrun through the Polarled Gas Pipeline to the Nyhamna Gas Plant
- Production was delayed when the level of mercury in the gas exceeded what was expected.
Dvalin North
- The Dvalin North gas field is located around 200 km off the coast of Northern Norway, west of Sandnessjøen at a water depth of 420 metres. It is estimated to contain around 84 million barrels of oil equivalent
- The development concept includes drilling three producing wells from a single subsea template, and pipeline connections to the existing Dvalin field located 10km to the south
Contractors
- **Technip**: EPCI contract for the subsea development
- **Aker Solutions:** A production system encompassing a manifold, four subsea trees and a 15-kilometer long umbilical
History
- 2010 - Dvalin Gas Field discovered
- 2012 - A second gas-bearing reservoir was discovered
- 2016 - Contracts awarded for the development
- 2019 - First production wells drilled
- 2021 - Project delayed due to high levels of mercury
- 2022 - PDO submitted for Dvalin North
Geology
- Dvalin consists of two separate structures, Dvalin East and Dvalin West. Both discoveries contain gas in Middle Jurassic sandstones of the Garn and Ile Formations.