Difference between revisions of "Durward and Dauntless Oil Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 10: | Line 10: | ||
=== Description === | === Description === | ||
+ | * The fields were developed using the [[Glas Dowr FPSO]] | ||
* The field has been decommissioned | * The field has been decommissioned | ||
=== Contractors === | === Contractors === | ||
+ | * '''Bluewater:''' Provision of FPSO | ||
* '''Seaway:''' FPSO mooring | * '''Seaway:''' FPSO mooring | ||
Line 25: | Line 27: | ||
# [[UK Oil and Gas Fields by Approval Date]] | # [[UK Oil and Gas Fields by Approval Date]] | ||
# [[UK Oil and Gas Field Approved Decommissioning Programmes]] | # [[UK Oil and Gas Field Approved Decommissioning Programmes]] | ||
+ | # [[Bluewater FPSO References]] | ||
# [[Seaway Heavy Lifting Europe Oil And Gas References]] | # [[Seaway Heavy Lifting Europe Oil And Gas References]] | ||
Revision as of 06:54, 19 February 2024
Summary Information
- Operator: Amerada Hess
- Country: UK
- Location:
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The fields were developed using the Glas Dowr FPSO
- The field has been decommissioned
Contractors
- Bluewater: Provision of FPSO
- Seaway: FPSO mooring
History
- 1996 - Field development approved by regulators
- 2002 - Decommissioning plan approved