Difference between revisions of "Durward and Dauntless Oil Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
* Country: UK | * Country: UK | ||
* Location: | * Location: | ||
− | * Production start: | + | * Production start: 1997 |
* Partners: | * Partners: | ||
− | * Type: Oil | + | * Type: Oil |
* Estimated Reserves: | * Estimated Reserves: | ||
* Production Volume: | * Production Volume: | ||
=== Description === | === Description === | ||
+ | * The fields were developed using the [[Glas Dowr FPSO]] which had crude processing capacity of 60,000 bopd, 85 MMscfd of gas and storage of 660,000 barrels | ||
* The field has been decommissioned | * The field has been decommissioned | ||
=== Contractors === | === Contractors === | ||
− | * | + | * '''Bluewater:''' Provision of FPSO |
+ | * '''Seaway:''' FPSO mooring | ||
=== History === | === History === | ||
+ | * 1994 - Dauntless field discovered | ||
* 1996 - Field development approved by regulators | * 1996 - Field development approved by regulators | ||
* 2002 - Decommissioning plan approved | * 2002 - Decommissioning plan approved | ||
Line 23: | Line 26: | ||
=== Links === | === Links === | ||
− | # [[UK Oil and Gas Field Approved Decommissioning Programmes]] | + | # [[UK Oil and Gas Fields by Approval Date]] |
+ | # [[UK Oil and Gas Field Approved Decommissioning Programmes]] | ||
+ | # [[Bluewater FPSO References]] | ||
+ | # [[Seaway Heavy Lifting Europe Oil And Gas References]] | ||
[[category:Field]] | [[category:Field]] | ||
[[category:UK]] | [[category:UK]] | ||
− | [[category: | + | [[category:Hess]] |
Latest revision as of 07:22, 19 February 2024
Summary Information
- Operator: Amerada Hess
- Country: UK
- Location:
- Production start: 1997
- Partners:
- Type: Oil
- Estimated Reserves:
- Production Volume:
Description
- The fields were developed using the Glas Dowr FPSO which had crude processing capacity of 60,000 bopd, 85 MMscfd of gas and storage of 660,000 barrels
- The field has been decommissioned
Contractors
- Bluewater: Provision of FPSO
- Seaway: FPSO mooring
History
- 1994 - Dauntless field discovered
- 1996 - Field development approved by regulators
- 2002 - Decommissioning plan approved