Difference between revisions of "Dunkerque LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: EDF Website: http://dunkerque-lng.edf.com/uk/index.html Location: Dunkirk Capacity: 13 billion cubic metres/annum Status: Under construction Br...") |
Abarrelfull (talk | contribs) (→Links) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | Ownership: EDF | + | * Ownership: EDF |
− | Website: http://dunkerque-lng.edf.com/uk/index.html | + | * Website: http://dunkerque-lng.edf.com/uk/index.html |
− | Location: Dunkirk | + | * Location: Dunkirk |
− | Capacity: 13 billion cubic metres/annum | + | * Capacity: 13 billion cubic metres/annum |
− | Status: | + | * Status: In operation |
− | |||
− | + | === Brief Description === | |
− | |||
− | + | * Dunkirk's intended LNG terminal has an annual hosting capacity of 9 Gm3 (billions of m3), or around 20% of France's current consumption. | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | === Technical Details === | |
− | |||
− | + | * Storage capacity: Three LNG storage tanks each with a capacity of 190,000 m3; a tank measures around 50 m in height and has a diameter of 90 m ; | |
− | + | * Unloading capacity: | |
− | + | * Send out capacity: 1.9 million m3(n)/h (cubic meters per hour) | |
− | |||
− | 2008 - Dunkerque LNG awarded SOFREGAZ an engineering and project Management contract | + | === Constructor: === |
− | 2011 - EDF confirms its investment in Dunkirk methane terminal project | + | * SOFREGAZ: engineering and project Management contract |
− | 2011 - SENER and Techint were awarded an EPC contract | + | * SENER and Techint have been awarded an EPC contract as the TS LNG consortium |
− | 2011 - Final investment decision made | + | * SMM: Contract for erection of 3 cryogenic LNG tanks |
− | 2012 - SMM Wins Contract for erection of 3 cryogenic LNG tanks | + | * Licensor: |
− | 2012 - Foundation stone laid | + | |
− | 2015 - EDF signs purchase agreement with Cheniere | + | === Project Status === |
− | Other Information | + | |
+ | * The construction was completed in [[LNG Terminal Projects Completed in 2017 | 2017]] | ||
+ | |||
+ | === Customers / Suppliers === | ||
+ | * Customers | ||
+ | |||
+ | * Total will utilise some of the capacity for its needs | ||
+ | * EDF will use majority of the capacity to supply 3 new gas fired plants which it is building | ||
+ | * Supplies will come from the [[Sabine Pass LNG Terminal]] | ||
+ | |||
+ | === History === | ||
+ | |||
+ | * 2008 - Dunkerque LNG awarded SOFREGAZ an engineering and project Management contract | ||
+ | * 2011 - EDF confirms its investment in Dunkirk methane terminal project | ||
+ | * 2011 - SENER and Techint were awarded an EPC contract | ||
+ | * 2011 - Final investment decision made | ||
+ | * 2012 - SMM Wins Contract for erection of 3 cryogenic LNG tanks | ||
+ | * 2012 - Foundation stone laid | ||
+ | * 2015 - EDF signs purchase agreement with Cheniere | ||
+ | * 2017 - Commercial Operation begins | ||
+ | |||
+ | === Other Information === | ||
- | - | ||
− | + | === Links === | |
+ | # [http://press.edf.com/press-releases/all-press-releases/2008/edf-pushes-ahead-with-the-development-of-dunkirk-methane-terminal-43008.html EDF pushes ahead with the development of Dunkirk methane terminal] | ||
+ | # [http://dunkerque-lng.edf.com/uk/environnement/environnement_d.html Environmental Impact] | ||
+ | # [http://www.total.com/en/about-total/news/news-940500.html&idActu=2317 EDF and Total Sign an agreement in the Planned Dunkirk LNG Terminal] | ||
+ | # [http://killajoules.wikidot.com/blog:783 EDF confirms its investment in Dunkirk methane terminal project] | ||
+ | # [http://www.sofregaz.fr/en/news/2008/dunkirk-france-lng-receiving-terminal DUNKIRK - FRANCE - LNG RECEIVING TERMINAL] | ||
+ | # [http://killajoules.wikidot.com/blog:925 SENER to perform turnkey project for the Dunkerque Regasification Plant] | ||
+ | # [http://killajoules.wikidot.com/blog:1006 EDF announces its final investment decision in the methane terminal at Dunkirk] | ||
+ | # [http://killajoules.wikidot.com/blog:2771 SMM Wins Contract for erection of 3 cryogenic LNG tanks] | ||
+ | # [http://killajoules.wikidot.com/blog:3257 Foundation stone laid for the Dunkirk LNG terminal] | ||
+ | # [http://killajoules.wikidot.com/blog:3935 Dunkirk LNG TANKS] | ||
+ | # [http://killajoules.wikidot.com/blog:5991 Cheniere Marketing] | ||
+ | # [https://a-barrel-full.blogspot.com/2020/08/commercial-commissioning-of-dunkirk.html Commercial commissioning of the Dunkirk regasification terminal] | ||
− | + | [[category:LNG]] | |
− | + | [[category:France]] | |
− | + | [[category:EDF]] | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Latest revision as of 16:22, 29 June 2022
Contents
Summary Information
- Ownership: EDF
- Website: http://dunkerque-lng.edf.com/uk/index.html
- Location: Dunkirk
- Capacity: 13 billion cubic metres/annum
- Status: In operation
Brief Description
- Dunkirk's intended LNG terminal has an annual hosting capacity of 9 Gm3 (billions of m3), or around 20% of France's current consumption.
Technical Details
- Storage capacity: Three LNG storage tanks each with a capacity of 190,000 m3; a tank measures around 50 m in height and has a diameter of 90 m ;
- Unloading capacity:
- Send out capacity: 1.9 million m3(n)/h (cubic meters per hour)
Constructor:
- SOFREGAZ: engineering and project Management contract
- SENER and Techint have been awarded an EPC contract as the TS LNG consortium
- SMM: Contract for erection of 3 cryogenic LNG tanks
- Licensor:
Project Status
- The construction was completed in 2017
Customers / Suppliers
- Customers
- Total will utilise some of the capacity for its needs
- EDF will use majority of the capacity to supply 3 new gas fired plants which it is building
- Supplies will come from the Sabine Pass LNG Terminal
History
- 2008 - Dunkerque LNG awarded SOFREGAZ an engineering and project Management contract
- 2011 - EDF confirms its investment in Dunkirk methane terminal project
- 2011 - SENER and Techint were awarded an EPC contract
- 2011 - Final investment decision made
- 2012 - SMM Wins Contract for erection of 3 cryogenic LNG tanks
- 2012 - Foundation stone laid
- 2015 - EDF signs purchase agreement with Cheniere
- 2017 - Commercial Operation begins
Other Information
-
Links
- EDF pushes ahead with the development of Dunkirk methane terminal
- Environmental Impact
- EDF and Total Sign an agreement in the Planned Dunkirk LNG Terminal
- EDF confirms its investment in Dunkirk methane terminal project
- DUNKIRK - FRANCE - LNG RECEIVING TERMINAL
- SENER to perform turnkey project for the Dunkerque Regasification Plant
- EDF announces its final investment decision in the methane terminal at Dunkirk
- SMM Wins Contract for erection of 3 cryogenic LNG tanks
- Foundation stone laid for the Dunkirk LNG terminal
- Dunkirk LNG TANKS
- Cheniere Marketing
- Commercial commissioning of the Dunkirk regasification terminal