Dunga Oil Field
Revision as of 13:40, 11 October 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Maersk * Country: Kazakhstan * Location: * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: +...")
Summary Information
- Operator: Maersk
- Country: Kazakhstan
- Location:
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The first phase of the pilot project was completed in 2001 and included the drilling of seven wells and the construction of surface facilities.
- The second appraisal phase was initiated to evaluate the field’s production performance under various development schemes,
- A full field development plan (FDP) was formulated and approved comprising the drilling eight vertical wells and six horizontal wells.
+++ Contractors
- -
+++ History
- 1994 - Production Sharing Agreement (PSA) which was signed
- 2001 - The first phase of the pilot project was completed
- 2002 - The second appraisal phase was initiated
- 2007 - A full field development plan (FDP) was formulated and approved by the Kazakh authorities
- 2009 - The first phase of the FDP was completed
- 2012 - First oil at Dunga Phase II
+++ Geology
+++ Links