Difference between revisions of "Driftwood LNG Export Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 35: | Line 35: | ||
=== Links === | === Links === | ||
# [https://abarrelfull.blogspot.com/2022/02/bechtel-to-deliver-276-mtpa-driftwood.html Bechtel to Deliver 27.6 MTPA Driftwood LNG Project for Tellurian] | # [https://abarrelfull.blogspot.com/2022/02/bechtel-to-deliver-276-mtpa-driftwood.html Bechtel to Deliver 27.6 MTPA Driftwood LNG Project for Tellurian] | ||
+ | # [https://abarrelfull.blogspot.com/2022/02/final-environmental-impact-statement.html Final Environmental Impact Statement- Driftwood LNG, LLC and Driftwood Pipeline, LLC, collectively Driftwood] | ||
# [https://lng-news.blogspot.com/2021/06/tellurian-and-vitol-sign-10-year-lng.html Tellurian and Gunvor sign 10-year LNG agreement for 3 mtpa] | # [https://lng-news.blogspot.com/2021/06/tellurian-and-vitol-sign-10-year-lng.html Tellurian and Gunvor sign 10-year LNG agreement for 3 mtpa] | ||
# [https://lng-news.blogspot.com/2021/06/tellurian-and-vitol-sign-10-year-lng_4.html Tellurian and Vitol sign 10-year LNG agreement for 3 mtpa] | # [https://lng-news.blogspot.com/2021/06/tellurian-and-vitol-sign-10-year-lng_4.html Tellurian and Vitol sign 10-year LNG agreement for 3 mtpa] |
Revision as of 10:45, 3 February 2022
Contents
Summary Information
- Ownership: Tellurian
- Website: https://www.tellurianinc.com/
- Location: Calcasieu River, south of Lake Charles, Louisiana
- Capacity: 27 million tons/annum
- Status: Planned
Brief Description
- The LNG Facility, includes five LNG plant facilities to liquefy natural gas, three tanks to store the LNG, LNG carrier loading/berthing facilities (Marine Facility), and other utilities
- Construction and operation of about 96 miles of pipeline, three new compressor stations, and 15 new meter stations.
Technical Details
- Storage capacity:
- Constructor:
- Bechtel: lump-sum turn key engineering, procurement and construction contract
- Licensor:
Ongoing Projects/Project Status
- Construction has not yet begun and commissioning is expected in 2025
Suppliers / Customers
- Suppliers:
- Customers:
- Vitol - 3mtpa
- Gunvor - 3mtpa
History
- 2017 - Bechtel awarded construction contracts
- 2021 - Tellurian signed sales contracts with Gunvor and Vitol