Driftwood LNG Export Terminal Project

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Ownership: Tellurian
  • Website: https://www.tellurianinc.com/
  • Location: Calcasieu River, south of Lake Charles, Louisiana
  • Capacity: 27 million tons/annum
  • Status: Planned

Brief Description

  • The LNG Facility, includes five LNG plant facilities to liquefy natural gas, three tanks to store the LNG, LNG carrier loading/berthing facilities (Marine Facility), and other utilities
  • Construction and operation of about 96 miles of pipeline, three new compressor stations, and 15 new meter stations.

Technical Details

  • Storage capacity:
  • Constructor:
    • Bechtel: lump-sum turn key engineering, procurement and construction contract
  • Licensor:

Ongoing Projects/Project Status

  • Construction has begun in 2022 and commissioning is expected in 2025

Suppliers / Customers

History

  • 2017 - Bechtel awarded construction contracts
  • 2019 - The final environmental impact assessment was completed
  • 2019 - Total becomes a shareholder and signs gas purchase agreements
  • 2021 - Tellurian signed sales contracts with Gunvor and Vitol
  • 2022 - Construction of the facility started

Other Information

  • -

Links

  1. Bechtel to Deliver 27.6 MTPA Driftwood LNG Project for Tellurian
  2. Total further commits to Tellurian-led Driftwood LNG project through 2.5 Mtpa of LNG offtake and equity investments
  3. Final Environmental Impact Statement- Driftwood LNG, LLC and Driftwood Pipeline, LLC, collectively Driftwood
  4. Tellurian and Gunvor sign 10-year LNG agreement for 3 mtpa
  5. Tellurian and Vitol sign 10-year LNG agreement for 3 mtpa
  6. Tellurian’s Driftwood LNG Begins Construction