Difference between revisions of "Dragon LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Ownership: Dragon LNG (BG Group, Petronas, 4Gas) * Website: http://www.dragonlng.co.uk/ * Location: Milford Haven, Wales, UK * Capacity: 2.2 m...")
 
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
  
* Ownership: Dragon LNG (BG Group, Petronas, 4Gas)  
+
* Ownership: Dragon LNG (Shell / Ancala)  
 
* Website: http://www.dragonlng.co.uk/
 
* Website: http://www.dragonlng.co.uk/
 
* Location:  Milford Haven, Wales, UK
 
* Location:  Milford Haven, Wales, UK
* Capacity: 2.2 million tons/annum  
+
* Capacity: 7 million tons/annum  
 
* Status: In Operation
 
* Status: In Operation
  
+++ Brief Description
+
=== Brief Description ===
 
* Dragon’s liquefied natural gas terminal consists of: a jetty, storage tanks and regasification facilities combined with gas export capabilities for 365 days per year continuous operation. The terminal has the capacity to receive and unload up to 217,000 cubic metre capacity carriers in approximately 24 hours.
 
* Dragon’s liquefied natural gas terminal consists of: a jetty, storage tanks and regasification facilities combined with gas export capabilities for 365 days per year continuous operation. The terminal has the capacity to receive and unload up to 217,000 cubic metre capacity carriers in approximately 24 hours.
  
+++ Technical Details
+
=== Technical Details ===
 
* Storage capacity: 2 x 160,000 m3 full containment LNG tanks
 
* Storage capacity: 2 x 160,000 m3 full containment LNG tanks
 
* Unloading capacity: 217,000 cubic metre capacity carriers in approximately 24 hours
 
* Unloading capacity: 217,000 cubic metre capacity carriers in approximately 24 hours
 
* Send out capacity:  
 
* Send out capacity:  
* 1,200,000 standard cubic metres per hour,  
+
** 1,200,000 standard cubic metres per hour,  
* 6 billion cubic metres of gas per annum  
+
** 6 billion cubic metres of gas per annum  
 
* Constructor:
 
* Constructor:
* Whessoe: Pre-feasibility/scoping studies and EPC contract
+
** Whessoe: Pre-feasibility/scoping studies and EPC contract
* Licensor:
 
  
+++ History
+
 
 +
=== History ===
 
* 2003 - BG Group and Petroplus form Dragon LNG which is given ownership of the site
 
* 2003 - BG Group and Petroplus form Dragon LNG which is given ownership of the site
 
* 2003 - Petronas acwquires a stake
 
* 2003 - Petronas acwquires a stake
Line 27: Line 27:
 
* 2009 - Terminal is commissioned
 
* 2009 - Terminal is commissioned
 
* 2013 - Petronas signs supply agreement with Qatargas
 
* 2013 - Petronas signs supply agreement with Qatargas
 +
* 2015 - Shell acquired BG Group and became a partner
 +
* 2019 - Ancala acquired a 50% stake from Petronas
  
+++ Ongoing Projects/Project Status
+
=== Ongoing Projects/Project Status ===
 
* -
 
* -
  
+++ Suppliers / Customers
+
=== Suppliers / Customers ===
 
* Suppliers:  
 
* Suppliers:  
* The partners each have the right to utilise a portion of the capacity and will supply it from their global portfolios
+
** The partners each have the right to utilise a portion of the capacity and will supply it from their global portfolios
* Petronas has a supply agreement with Qatargas
+
** Petronas has a supply agreement with Qatargas
* Customers:  
+
* Customers:
 +
** Two pipelines to connect the terminal to the grid were constructed at the same time as the terminal itself.
 +
** One runs from Milford Haven to Aberdulais, near Neath and the other from Felindre, near Swansea to Tirley in Gloucestershire
  
+++ Other Information
+
=== Other Information ===
* The terminal is situated on the site of the former [[[Gulf Oil Milford Haven Refinery]]]
+
* The terminal is situated on the site of the former [[Gulf Oil Milford Haven Refinery]]
  
 
=== Links ===
 
=== Links ===
  
 +
# [[Whessoe Engineering LNG References]]
 
# [http://killajoules.wikidot.com/archive:bg-group-and-partners-in-dragon-lng-sign-agreements BG Group and partners in Dragon LNG sign agreements to trigger go-ahead for Milford Haven importation terminal]
 
# [http://killajoules.wikidot.com/archive:bg-group-and-partners-in-dragon-lng-sign-agreements BG Group and partners in Dragon LNG sign agreements to trigger go-ahead for Milford Haven importation terminal]
 
# [http://killajoules.wikidot.com/archive:air-products-to-supply-nitrogen-for-new-liquefied-na Air Products to Supply Nitrogen for New Liquefied Natural Gas Terminal]
 
# [http://killajoules.wikidot.com/archive:air-products-to-supply-nitrogen-for-new-liquefied-na Air Products to Supply Nitrogen for New Liquefied Natural Gas Terminal]
Line 48: Line 53:
 
# [http://www.whessoe.co.uk/projects/feed/dragon.aspx Whessoe, Dragon LNG FEED]
 
# [http://www.whessoe.co.uk/projects/feed/dragon.aspx Whessoe, Dragon LNG FEED]
 
# [http://killajoules.wikidot.com/blog:4555 Qatargas and PETRONAS LNG (UK) sign 5-year Sales and Purchase Agreement]
 
# [http://killajoules.wikidot.com/blog:4555 Qatargas and PETRONAS LNG (UK) sign 5-year Sales and Purchase Agreement]
 +
# [https://abarrelfull.blogspot.com/2023/09/recommended-cash-and-share-offer-for-bg.html Recommended cash and share offer for BG Group by Royal Dutch Shell]
 +
# [https://abarrelfull.blogspot.com/2022/01/ancala-acquires-50-interest-in-dragon.html Ancala acquires 50% interest in Dragon LNG]
 +
 +
[[Category:LNG]]
 +
[[Category:UK]]
 +
[[Category:Shell]]

Latest revision as of 06:52, 18 October 2023

Summary Information

  • Ownership: Dragon LNG (Shell / Ancala)
  • Website: http://www.dragonlng.co.uk/
  • Location: Milford Haven, Wales, UK
  • Capacity: 7 million tons/annum
  • Status: In Operation

Brief Description

  • Dragon’s liquefied natural gas terminal consists of: a jetty, storage tanks and regasification facilities combined with gas export capabilities for 365 days per year continuous operation. The terminal has the capacity to receive and unload up to 217,000 cubic metre capacity carriers in approximately 24 hours.

Technical Details

  • Storage capacity: 2 x 160,000 m3 full containment LNG tanks
  • Unloading capacity: 217,000 cubic metre capacity carriers in approximately 24 hours
  • Send out capacity:
    • 1,200,000 standard cubic metres per hour,
    • 6 billion cubic metres of gas per annum
  • Constructor:
    • Whessoe: Pre-feasibility/scoping studies and EPC contract


History

  • 2003 - BG Group and Petroplus form Dragon LNG which is given ownership of the site
  • 2003 - Petronas acwquires a stake
  • 2004 - The project partners in sign agreements to trigger go-ahead
  • 2007 - Air Products awarded contract to Supply Nitrogen
  • 2009 - Terminal is commissioned
  • 2013 - Petronas signs supply agreement with Qatargas
  • 2015 - Shell acquired BG Group and became a partner
  • 2019 - Ancala acquired a 50% stake from Petronas

Ongoing Projects/Project Status

  • -

Suppliers / Customers

  • Suppliers:
    • The partners each have the right to utilise a portion of the capacity and will supply it from their global portfolios
    • Petronas has a supply agreement with Qatargas
  • Customers:
    • Two pipelines to connect the terminal to the grid were constructed at the same time as the terminal itself.
    • One runs from Milford Haven to Aberdulais, near Neath and the other from Felindre, near Swansea to Tirley in Gloucestershire

Other Information

Links

  1. Whessoe Engineering LNG References
  2. BG Group and partners in Dragon LNG sign agreements to trigger go-ahead for Milford Haven importation terminal
  3. Air Products to Supply Nitrogen for New Liquefied Natural Gas Terminal
  4. BG Group delivers first Dragon LNG cargo
  5. BG Group and Petroplus to partner in UK Liquefied Natural Gas (LNG) Facility
  6. Whessoe, Dragon LNG FEED
  7. Qatargas and PETRONAS LNG (UK) sign 5-year Sales and Purchase Agreement
  8. Recommended cash and share offer for BG Group by Royal Dutch Shell
  9. Ancala acquires 50% interest in Dragon LNG