Downeast LNG Terminal

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Ownership: Downeast LNG
  • Website: http://www.downeastlng.com/
  • Location: Passamaquoddy Bay, Maine, USA
  • Capacity: million tons/annum
  • Status: Planned

Brief Description

  • The proposed facility will consist of two storage tanks, a re-gasification plant and a pier to receive LNG carriers.
  • The licence application has been withdrawn

Technical Details

  • Storage capacity: two 160,000 m3 full containment type tanks
  • Unloading capacity: LNG vessels with cargo capacities no greater than 165,000 m3.
  • Send out capacity: the terminal would have an average total output of 500 MMcfd
  • Constructor:


Ongoing Projects/Project Status

  • Final EIS recieved (2014)

Suppliers / Customers

  • Suppliers:
  • Customers:
    • The sendout pipeline would extend from the LNG terminal to the existing M&NE pipeline system at the Baileyville Compressor Station
    • The M&NE pipeline system serves Maine, New Hampshire, and Massachusetts


History

  • 2005 - LNG Terminal Proposed
  • 2006 - Application filed with FERC
  • 2009 - Draft EIS published by FERC
  • 2014 - FERC publishes final EIS

Other Information

  • -

Links

  1. Long Term Applications Received by DOE/FE
  2. Draft EIS for the Downeast LNG Project
  3. DESCRIPTION OF THE PROPOSED ACTION
  4. CH·IV INTERNATIONAL CONTRIBUTES TO DOWNEAST LNG’S FEDERAL PERMIT APPLICATIONS
  5. FERC issues Final Environmental Impact Statement on the Downeast LNG Project