Douglas Channel LNG Terminal Project
Jump to navigation
Jump to search
Summary Information
- Ownership: Douglas Channel Energy Partners (DCEP)
- Website: http://douglaschannelenergy.com/
- Location: Douglas Channel, BC, Canada
- Capacity: 0.9 million tons/annum
- Status: Planned
+++ Brief Description
- The barge-based liquefaction plant will utilize the proven Prico LNG process and be largely self-contained.
- The plant will be fabricated and assembled in a shipyard, then towed to its permanent location in Douglas Channel where it will be grounded on a prepared foundation and interconnected to support systems and the berth.
- A small LNG buffer tank, electrical substation, and other support facilities will be located on land adjacent to the liquifaction plant.
+++ Technical Details
- Storage capacity:
- Constructor:
* **EXMAR:** Design, contract, and deliver a newbuild floating barge
- Licensor: **Black & Veatch** PRICO® LNG Process
+++ Ongoing Projects/Project Status
- Engineering design and construction schedules to be confirmed in January/February 2012
+++ Suppliers / Customers
- Suppliers: Pacific Northern Gas Pipeline
- Customers: Golar LNG will buy 700,000 metric tonnes per annum of LNG
+++ History
- 2011 - Black & Veatch awarded FEED contract
- 2012 - BC LNG gets 20-year Licence to Export Liquefied Natural Gas from the proposed facility
- 2013 - Golar LNG sign take off contract
- 2013 - Exmar awarded barge contract
- 2015 - Project acquired be consortium
+++ Other Information
- -
+++ Relevant Links
- Western Canada natural gas export facility features Black & Veatch’s PRICO® process
- BC LNG gets 20-year Licence to Export Liquefied Natural Gas
- Government of Canada Approves Licence to Export Liquefied Natural Gas
- BC LNG Export Co-Operative LLC Finalises Contract Awards
- BC LNG Pre-FID Steering Committee Clarification to recent media articles
- EXMAR teams up with LNG Partners for BC LNG Project
- Export Licence
- Fresh Start for Douglas Channel LNG Project as New Owners Take Control