Difference between revisions of "Donggi Senoro LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 10: | Line 10: | ||
* Status: Under Construction | * Status: Under Construction | ||
− | + | === Brief Description === | |
* PT DSLNG aims to produce and deliver approximately two million tonnes of LNG per year, along with associated condensate (approximately 47,000 B/D crude oil equivalent). | * PT DSLNG aims to produce and deliver approximately two million tonnes of LNG per year, along with associated condensate (approximately 47,000 B/D crude oil equivalent). | ||
− | + | === Technical Details === | |
* Storage capacity: | * Storage capacity: | ||
* Constructor: | * Constructor: | ||
Line 21: | Line 21: | ||
− | + | === Ongoing Projects/Project Status === | |
* First LNG was shipped in [[LNG Terminal Projects Completed in 2015 | 2015]] | * First LNG was shipped in [[LNG Terminal Projects Completed in 2015 | 2015]] | ||
− | + | === Suppliers / Customers === | |
* Suppliers: It will be supplied from the [[Senoro Gas Field]] Development and [[Matindok Gas Fields | four fields in Matindok Block]] | * Suppliers: It will be supplied from the [[Senoro Gas Field]] Development and [[Matindok Gas Fields | four fields in Matindok Block]] | ||
* Customers: | * Customers: | ||
− | + | ** PT Donggi Senoro LNG has signed a head of agreement (HoA) with Japan’s Chubu Power Co. Inc stipulating that the company would be supplied with 1 million tons of LNG per annum from the plant for twelve years. | |
− | + | ** Kogas may buy 0.7 MPTA of LNG and Kyushu may buy 0.3 MPTA of LNG | |
− | + | ** It supplies LNG to the [[[Arun LNG Import Terminal Project | Arun LNG Import Terminal]]] | |
− | + | === History === | |
* 2006 - Pertamina decided to build an LNG terminal for the Matindok and Senoro blocks | * 2006 - Pertamina decided to build an LNG terminal for the Matindok and Senoro blocks | ||
* 2007 - Pertamina-Medco And Mitsubishi Agree On Senoro Gas Price | * 2007 - Pertamina-Medco And Mitsubishi Agree On Senoro Gas Price | ||
Line 40: | Line 40: | ||
* 2015 - First cargo shipped | * 2015 - First cargo shipped | ||
− | + | === Other Information === | |
* The project was originally expected to cost a total $3.7 billion -- $2 billion for the LNG plant and $1.7 billion for upstream infrastructure. | * The project was originally expected to cost a total $3.7 billion -- $2 billion for the LNG plant and $1.7 billion for upstream infrastructure. | ||
* Donggi Senoro LNG joint venture raised the cost estimate for the downstream 2 million mt/year liquefaction plant by 40% to $2.8 billion | * Donggi Senoro LNG joint venture raised the cost estimate for the downstream 2 million mt/year liquefaction plant by 40% to $2.8 billion |
Revision as of 10:31, 27 June 2022
Contents
Summary Information
- Ownership:
- Mitsubishi Corporation 51%,
- Pertamina Energy Services Pte Ltd 29%,
- PT Medco LNG Indonesia 20%
- Website: http://www.mitsubishicorp.com/
- Location: Banggai Regency, Central Sulawesi, Province Indonesia
- Capacity: 2.0 million tons/annum
- Status: Under Construction
Brief Description
- PT DSLNG aims to produce and deliver approximately two million tonnes of LNG per year, along with associated condensate (approximately 47,000 B/D crude oil equivalent).
Technical Details
- Storage capacity:
- Constructor:
- **JGC:** A lump-sum turnkey contract to provide engineering, procurement, construction and commissioning services
- Licensor: **Air Products**
Ongoing Projects/Project Status
- First LNG was shipped in 2015
Suppliers / Customers
- Suppliers: It will be supplied from the Senoro Gas Field Development and four fields in Matindok Block
- Customers:
- PT Donggi Senoro LNG has signed a head of agreement (HoA) with Japan’s Chubu Power Co. Inc stipulating that the company would be supplied with 1 million tons of LNG per annum from the plant for twelve years.
- Kogas may buy 0.7 MPTA of LNG and Kyushu may buy 0.3 MPTA of LNG
- It supplies LNG to the [[[Arun LNG Import Terminal Project | Arun LNG Import Terminal]]]
History
- 2006 - Pertamina decided to build an LNG terminal for the Matindok and Senoro blocks
- 2007 - Pertamina-Medco And Mitsubishi Agree On Senoro Gas Price
- 2010 - The Indonesian government agreed to allow 70% of the natural gas to be exported
- 2011 - Final Investment decision taken
- 2011 - JGC signs turn key agreement
- 2011 - Air Products chosen as technology provider
- 2015 - First cargo shipped
Other Information
- The project was originally expected to cost a total $3.7 billion -- $2 billion for the LNG plant and $1.7 billion for upstream infrastructure.
- Donggi Senoro LNG joint venture raised the cost estimate for the downstream 2 million mt/year liquefaction plant by 40% to $2.8 billion
Links
- Project Webpage from Mitsubishi
- Donggi Senoro LNG may get two new buyers
- Senoro Gas Development
- Indonesia's Donggi Senoro JV raises LNG plant cost estimate by 40%
- LNG Terminals Using Air Products Technology
- Final Investment Decision on Donggi-Senoro LNG Project in Indonesia
- Mitsubishi - Acquisition of Working Interest in Senoro-Toili Natural Gas Field in Indonesia
- Air Products’ LNG Technology Selected for Indonesia Energy Project
- Pertamina: Gas From Matindok And Senoro Blocks For LNG
- Pertamina-Medco And Mitsubishi Agree On Senoro Gas Price
- Air Products Celebrates Manufacturing of 100th LNG Heat Exchanger
- JGC Wins EPC Contract for LNG Project in Indonesia
- First Shipment of LNG from Donggi-Senoro Project in Indonesia