Difference between revisions of "Dolphin Area Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: Shell * Country: Trinidad and Tobago * Location: * Production start: 2006 * Partners: * Type: Gas * Estimated Reserves: * Production...") |
Abarrelfull (talk | contribs) |
||
Line 27: | Line 27: | ||
=== Links === | === Links === | ||
# [[FoundOcean North And South America Subsea References]] | # [[FoundOcean North And South America Subsea References]] | ||
+ | # [[Serimax Pipeline References]] | ||
# [http://killajoules.wikidot.com/archive:stolt-offshore-announces-80-million-contract-award-i/ Stolt Offshore Announces $80 Million Contract Award In Trinidad] | # [http://killajoules.wikidot.com/archive:stolt-offshore-announces-80-million-contract-award-i/ Stolt Offshore Announces $80 Million Contract Award In Trinidad] | ||
# [http://killajoules.wikidot.com/archive:bg-announces-first-gas-from-dolphin-deep-field-in-tr BG announces first gas from Dolphin Deep field in Trinidad and Tobago] | # [http://killajoules.wikidot.com/archive:bg-announces-first-gas-from-dolphin-deep-field-in-tr BG announces first gas from Dolphin Deep field in Trinidad and Tobago] |
Latest revision as of 17:58, 31 January 2024
Summary Information
- Operator: Shell
- Country: Trinidad and Tobago
- Location:
- Production start: 2006
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The Dolphin Deep field is located approximately 83 kilometres off the east coast of Trinidad in the East Coast Marine Area (ECMA).
- Gas production is from two wells tied back to existing Dolphin infrastructure
- Gas is exported via a 90km of 24-inch diameter gas transportation pipeline to Beachfield Gas Processing Plant
Contractors
- **Heerema Marine Contractors:** Dolphin 'A' Installation
- **Stolt Offshore:** Gas transportation pipeline
History
- 2004 - Stolt Offshore awarded contract for Gas transportation pipeline
- 2006 - First gas produced