Didon Offshore Oil Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Enquest
  • Country: Tunisia
  • Location: Zarat Permit, Offshore
  • Production start: 1998
  • Partners:
  • Type: Oil
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The development consists of a WH Platform connected to the vessel Didon FSO

+++ Contractors

  • **Micoperi:** Phase II
    • Offshore installation of the production jacket, topside drilling and production platform, inst. & hook up
    • Installation of 5”coiled tubing and umbilicals

+++ History

  • 1998 - First oil produced
  • 2005 - PA Resources became the major shareholder
  • 2006 - New platform starts production
  • 2007 - Phase II of the Didon development completed
  • 2008 - Oil Discovery At Didon North
  • 2013 - Enquest acquired a 70% interest in the field

+++ Geology

+++ Links

  1. Micoperi Offshore Pipeline References
  2. FoundOcean Subsea References
  3. Oil And Gas Concessions In Tunisia
  4. Supplementary Information To The PA Resources Acquisition Of Tunisian Assets
  5. Closing Of Didon/Zarat
  6. First Oil From The Platform On The Didon-Field
  7. PA Resources’ Vessel Didon FSO Is Back In Operation At The Didon Field
  8. PA Resources Makes Oil Discovery At Didon North
  9. Enquest Announces Its Entry Into North Africa Through A 70% Operating Interest In The Producing Didon Oil Field And The Zarat Permit In Tunisia