Diamond Crude Oil Pipeline

From A Barrel Full
Revision as of 08:04, 11 March 2020 by Abarrelfull (talk | contribs) (Created page with "=== Summary Information === Source: Cushing, Okla Destination: Memphis Ownership: Plains All American Website: http://www.paalp.com/ Length: kilometres (440 miles) Capacity: 2...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

Source: Cushing, Okla Destination: Memphis Ownership: Plains All American Website: http://www.paalp.com/ Length: kilometres (440 miles) Capacity: 200,000 barrels of oil per day Crude Type: Light Sweet

Brief Description

  • A 440-mile, 20-inch crude oil pipeline that provides capacity of up to 200,000 barrels per day of domestic sweet crude from the Plains Cushing, Okla. terminal to the Valero Memphis Refinery
  • It provides light sweet domestic crude to the refinery
  • It replaced the Capline Oil Pipeline
  • Pipeline Status: In operation

History

  • 2014 - Pipeline project announced
  • 2017 The pipeline begins operations

Other Information

=== Links

  1. Plains All American Announces Plans to Construct Pipeline from Cushing to Memphis
  2. Diamond Pipeline disrupts oil flows around U.S.