(Created page with "Summary Information Ownership: Dhamra Port Company / IOCL Website: http://www.dhamraport.com/ Location: Dhamra, India Capacity: 5 million tons/annum Status: Planned Brief Desc...")
 
 
(20 intermediate revisions by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
Ownership: Dhamra Port Company / IOCL
+
 
Website: http://www.dhamraport.com/
+
* Ownership: Total Energies / Adani
Location: Dhamra, India
+
* Website: http://www.dhamraport.com/
Capacity: 5 million tons/annum
+
* Location: Dhamra, India
Status: Planned
+
* Capacity: 5 million tons/annum  
Brief Description
+
* Status: In operation
-
+
 
Technical Details
+
=== Brief Description ===
Storage capacity:
+
* The Dhamra LNG import terminal is designed for an initial capacity of 5 MTPA, expandable up to 10 MTPA. Initially, it will have two full containment type tanks of 180,000 m3 capacity each.
Unloading capacity:
+
 
Send out capacity:
+
=== Technical Details ===
Constructor:
+
* Storage capacity: Two full containment type tanks of 170,000 m3
Licensor:
+
* Unloading capacity: It will have a jetty capable of handling a wide range of LNG supply vessels, including the largest Q-max fleet
Ongoing Projects/Project Status
+
* Send out capacity:  
Indian oil is discussing the project with Dhamra Port
+
* Constructor:
Suppliers / Customers
+
** Larsen and Toubro: Construction of the tanks
Suppliers:
+
** Whessoe Engineering: Detailed Engineering & Construction Supervision for the tanks
Customers: IOCL refineries at Paradip (in Orissa) and Haldia (in West Bengal) need 2.5 million tons of LNG
+
** CTCI: Regas Package
History
+
 
-
+
=== Ongoing Projects/Project Status ===
Other Information
+
* The terminal was completed in [[LNG Terminal Projects to be Completed in 2023 | 2023]]
-
+
 
Relevant Links
+
=== Suppliers / Customers ===
East coast to get first LNG import terminal
+
* Suppliers:  
Indian Oil in talks with Dhamra port for LNG terminal
+
* Customers:  
IndianOil and GAIL sign MoU for taking equity stake in upcoming Dhamra LNG terminal
+
** IOCL refineries at Paradip (in Orissa) and Haldia (in West Bengal) need 2.5 million tons of LNG
 +
** GAIL India has booked 1.5 million tonnes per annum (MTPA) regasification capacity for a period of 20 years.
 +
 
 +
=== History ===
 +
* 2017 - Construction started
 +
* 2018 - CTCI awarded regasification package
 +
* 2018 - Gail and IOCL sign contracts for 4.5 mn tons per annum
 +
* 2023 - First cargo delivered
 +
 
 +
=== Other Information ===
 +
* -
 +
 
 +
=== Links ===
 +
# [[Whessoe Engineering LNG References]]
 +
# [http://www.livemint.com/2011/06/12230522/East-coast-to-get-first-LNG-im.html?atype=tp East coast to get first LNG import terminal]
 +
# [https://abarrelfull.blogspot.com/2021/12/adani-ports-signs-long-term_30.html Adani Ports signs a long term regasification pact with Indian Oil for Dhamra LNG terminal]
 +
# [http://killajoules.wikidot.com/archive:indianoil-and-gail-sign-mou-for-taking-equity-stake IndianOil and GAIL sign MoU for taking equity stake in upcoming Dhamra LNG terminal]
 +
# [https://abarrelfull.blogspot.com/2021/12/ctci-wins-regas-package-for-lng.html CTCI Wins Regas Package for LNG Receiving Terminal Project at Dhamra Odisha from Adani Group]
 +
# [https://abarrelfull.blogspot.com/2021/12/adani-ports-signs-long-term.html Adani Ports signs a long term regasification pact with GAIL India Ltd for Dhamra LNG terminal]
 +
# [https://lng-news.blogspot.com/2023/04/qatargas-supplies-commissioning-lng.html Qatargas Supplies Commissioning LNG Cargo To India’s Dhamra Terminal]
 +
 
 +
[[Category:LNG]]
 +
[[Category:India]]
 +
[[Category:Total]]

Latest revision as of 15:05, 17 April 2023

Summary Information

  • Ownership: Total Energies / Adani
  • Website: http://www.dhamraport.com/
  • Location: Dhamra, India
  • Capacity: 5 million tons/annum
  • Status: In operation

Brief Description

  • The Dhamra LNG import terminal is designed for an initial capacity of 5 MTPA, expandable up to 10 MTPA. Initially, it will have two full containment type tanks of 180,000 m3 capacity each.

Technical Details

  • Storage capacity: Two full containment type tanks of 170,000 m3
  • Unloading capacity: It will have a jetty capable of handling a wide range of LNG supply vessels, including the largest Q-max fleet
  • Send out capacity:
  • Constructor:
    • Larsen and Toubro: Construction of the tanks
    • Whessoe Engineering: Detailed Engineering & Construction Supervision for the tanks
    • CTCI: Regas Package

Ongoing Projects/Project Status

  • The terminal was completed in 2023

Suppliers / Customers

  • Suppliers:
  • Customers:
    • IOCL refineries at Paradip (in Orissa) and Haldia (in West Bengal) need 2.5 million tons of LNG
    • GAIL India has booked 1.5 million tonnes per annum (MTPA) regasification capacity for a period of 20 years.

History

  • 2017 - Construction started
  • 2018 - CTCI awarded regasification package
  • 2018 - Gail and IOCL sign contracts for 4.5 mn tons per annum
  • 2023 - First cargo delivered

Other Information

  • -

Links

  1. Whessoe Engineering LNG References
  2. East coast to get first LNG import terminal
  3. Adani Ports signs a long term regasification pact with Indian Oil for Dhamra LNG terminal
  4. IndianOil and GAIL sign MoU for taking equity stake in upcoming Dhamra LNG terminal
  5. CTCI Wins Regas Package for LNG Receiving Terminal Project at Dhamra Odisha from Adani Group
  6. Adani Ports signs a long term regasification pact with GAIL India Ltd for Dhamra LNG terminal
  7. Qatargas Supplies Commissioning LNG Cargo To India’s Dhamra Terminal