Difference between revisions of "Dhamra LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 16: | Line 16: | ||
* Constructor: | * Constructor: | ||
** Whessoe Engineering: Detailed Engineering & Construction Supervision for the tanks | ** Whessoe Engineering: Detailed Engineering & Construction Supervision for the tanks | ||
+ | ** CTCI: Regas Package | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === |
Revision as of 16:44, 21 December 2021
Contents
Summary Information
- Ownership: Dhamra Port Company / IOCL
- Website: http://www.dhamraport.com/
- Location: Dhamra, India
- Capacity: 5 million tons/annum
- Status: Planned
Brief Description
- The Dhamra LNG import terminal is designed for an initial capacity of 5 MTPA, expandable up to 10 MTPA. Initially, it will have two full containment type tanks of 180,000 m3 capacity each.
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
- Whessoe Engineering: Detailed Engineering & Construction Supervision for the tanks
- CTCI: Regas Package
Ongoing Projects/Project Status
- Indian oil is discussing the project with Dhamra Port
Suppliers / Customers
- Suppliers:
- Customers: IOCL refineries at Paradip (in Orissa) and Haldia (in West Bengal) need 2.5 million tons of LNG
History
- 2018 - CTCI awarded regasification package
Other Information
- -
Links
- Whessoe Engineering LNG References
- East coast to get first LNG import terminal
- Indian Oil in talks with Dhamra port for LNG terminal
- IndianOil and GAIL sign MoU for taking equity stake in upcoming Dhamra LNG terminal
- CTCI Wins Regas Package for LNG Receiving Terminal Project at Dhamra Odisha from Adani Group