Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Quadrant Energy * Country: Australia * Location: 80km northwest of the port of Dampier * Production start: 2011 * Partners: Santos * Type: Gas...") |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | * Operator: | + | * Operator: Santos |
* Country: Australia | * Country: Australia | ||
* Location: 80km northwest of the port of Dampier | * Location: 80km northwest of the port of Dampier | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The development consists of an offshore gas field, Reindeer and an onshore gas processing plant, Devil Creek | * The development consists of an offshore gas field, Reindeer and an onshore gas processing plant, Devil Creek | ||
* Reindeer gas is produced via an unmanned, minimum facility wellhead platform located in 65 metres of water | * Reindeer gas is produced via an unmanned, minimum facility wellhead platform located in 65 metres of water | ||
Line 15: | Line 15: | ||
* The raw natural gas will be processed and then supplied into the [[Dampier To Bunbury Natural Gas Pipeline]]. A second commercial product derived from the gas stream will be condensate. Devil Creek will initially provide up to 110 Terajoules (TJ/d) per day for the Western Australian domestic gas market and has been designed to process up to 220 TJ/d of natural gas | * The raw natural gas will be processed and then supplied into the [[Dampier To Bunbury Natural Gas Pipeline]]. A second commercial product derived from the gas stream will be condensate. Devil Creek will initially provide up to 110 Terajoules (TJ/d) per day for the Western Australian domestic gas market and has been designed to process up to 220 TJ/d of natural gas | ||
− | + | === Contractors === | |
* **Shenzhen Chiwan Sembawang Engineering:** Fabrication of wellhead platform | * **Shenzhen Chiwan Sembawang Engineering:** Fabrication of wellhead platform | ||
* **SapuraAcergy:** Transportation and installation of approximately 91km of 16” rigid pipeline including a shallow water beach approach, subsea tie-in and stabilisation works together with a wellhead platform of a 1,700T four leg jacket and a 450T topside processing module | * **SapuraAcergy:** Transportation and installation of approximately 91km of 16” rigid pipeline including a shallow water beach approach, subsea tie-in and stabilisation works together with a wellhead platform of a 1,700T four leg jacket and a 450T topside processing module | ||
Line 22: | Line 22: | ||
* **FoundOcean:** Grouting | * **FoundOcean:** Grouting | ||
− | + | === History === | |
* 1997 - Reindeer Gas Field discovered | * 1997 - Reindeer Gas Field discovered | ||
* 2007 - Commencement of FEED | * 2007 - Commencement of FEED | ||
Line 30: | Line 30: | ||
* 2011 - First gas from Reindeer / Devil Creek | * 2011 - First gas from Reindeer / Devil Creek | ||
* 2015 - Quadrant Energy acquired Apache's share | * 2015 - Quadrant Energy acquired Apache's share | ||
+ | * 2018 - Santos acquired Quadrant Energy | ||
− | + | === Geology === | |
* Middle Jurassic Legendre Formation | * Middle Jurassic Legendre Formation | ||
− | + | === Links === | |
# [http://www.nopsema.gov.au/assets/epsummaries/EP-Summary-Reindeer-Wellhead-Platform-and-Offshore-Gas-Supply-Pipeline-Ops4.pdf Reindeer Wellhead Platform and Offshore Gas Supply Pipeline Operations Environment Plan Summary] | # [http://www.nopsema.gov.au/assets/epsummaries/EP-Summary-Reindeer-Wellhead-Platform-and-Offshore-Gas-Supply-Pipeline-Ops4.pdf Reindeer Wellhead Platform and Offshore Gas Supply Pipeline Operations Environment Plan Summary] | ||
# [[FoundOcean Subsea References]] | # [[FoundOcean Subsea References]] | ||
Line 48: | Line 49: | ||
# [http://www.johnholland.com.au/Documents.asp?ID=13967&ProjectID=15&ProjCont=Details John Holland, Project page] | # [http://www.johnholland.com.au/Documents.asp?ID=13967&ProjectID=15&ProjCont=Details John Holland, Project page] | ||
# [http://killajoules.wikidot.com/archive:john-holland-to-deliver-devil-creek-development-proj/ John Holland to deliver Devil Creek development project for Apache Energy Limited] | # [http://killajoules.wikidot.com/archive:john-holland-to-deliver-devil-creek-development-proj/ John Holland to deliver Devil Creek development project for Apache Energy Limited] | ||
− | # [ | + | # [https://abarrelfull.blogspot.com/2023/11/brookfield-and-macquarie-capital.html Brookfield and Macquarie Capital Consortium to purchase Apache WA oil and gas assets] |
+ | # [https://abarrelfull.blogspot.com/2023/11/santos-announced-today-acquisition-of.html Santos announced today the acquisition of 100% of Quadrant Energy] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:Australia]] | ||
+ | [[category:Santos]] |
Latest revision as of 08:05, 29 November 2023
Summary Information
- Operator: Santos
- Country: Australia
- Location: 80km northwest of the port of Dampier
- Production start: 2011
- Partners: Santos
- Type: Gas
- Estimated Reserves: The Reindeer field proven and probable (2P) reserves are estimated at approximately 485 Petajoules of sales gas and 1.6 million barrels of condensate.
- Production Volume:
Description
- The development consists of an offshore gas field, Reindeer and an onshore gas processing plant, Devil Creek
- Reindeer gas is produced via an unmanned, minimum facility wellhead platform located in 65 metres of water
- The WHP is a four leg jacket with one skirt pile per leg and four level topsides with an integrated helideck location on the upper deck. A single 406 mm (16”) subsea and offshore gas pipeline links the WHP to an onshore gas treatment plant (the Devil Creek Gas Plant).
- The raw natural gas will be processed and then supplied into the Dampier To Bunbury Natural Gas Pipeline. A second commercial product derived from the gas stream will be condensate. Devil Creek will initially provide up to 110 Terajoules (TJ/d) per day for the Western Australian domestic gas market and has been designed to process up to 220 TJ/d of natural gas
Contractors
- **Shenzhen Chiwan Sembawang Engineering:** Fabrication of wellhead platform
- **SapuraAcergy:** Transportation and installation of approximately 91km of 16” rigid pipeline including a shallow water beach approach, subsea tie-in and stabilisation works together with a wellhead platform of a 1,700T four leg jacket and a 450T topside processing module
- **John Holland:** Contract for construction of onshore facilities
- **Clough:** Engineering, Procurement and Fabrication of the onshore gas plant
- **FoundOcean:** Grouting
History
- 1997 - Reindeer Gas Field discovered
- 2007 - Commencement of FEED
- 2008 - Reindeer Project Sanctioned
- 2009 - SapuraAcergy awarded offshore contract
- 2009 - Groundbreaking ceremony for gas processing plant
- 2011 - First gas from Reindeer / Devil Creek
- 2015 - Quadrant Energy acquired Apache's share
- 2018 - Santos acquired Quadrant Energy
Geology
- Middle Jurassic Legendre Formation
Links
- Reindeer Wellhead Platform and Offshore Gas Supply Pipeline Operations Environment Plan Summary
- FoundOcean Subsea References
- Shenzhen Chiwan Sembawang Engineering Platform References
- Reindeer 1
- Commencement of FEED for Reindeer Field
- Reindeer Project Sanctioned
- Award for $170 million Offshore Australia contract to SapuraAcergy Joint Venture
- Reindeer Project Update
- First gas from Reindeer / Devil Creek
- Groundbreaking signals commencement of new WA domestic gas hub
- John Holland, Project page
- John Holland to deliver Devil Creek development project for Apache Energy Limited
- Brookfield and Macquarie Capital Consortium to purchase Apache WA oil and gas assets
- Santos announced today the acquisition of 100% of Quadrant Energy