Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Petronet LNG Website: http://www.petronetlng.com/ Location: Dahej, Gujarat, India Capacity: 10.0 million tons/annum Status: In Operation Brief D...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | Ownership: Petronet LNG | + | |
− | Website: http://www.petronetlng.com/ | + | * Ownership: Petronet LNG |
− | Location: Dahej, Gujarat, India | + | * Website: http://www.petronetlng.com/ |
− | Capacity: 10.0 million tons/annum | + | * Location: Dahej, Gujarat, India |
− | Status: In Operation | + | * Capacity: 10.0 million tons/annum |
− | Brief Description | + | * Status: In Operation |
− | India's first ever regasification terminal, it has a large capacity and three storage tanks | + | |
− | Technical Details | + | +++ Brief Description |
− | Storage capacity: | + | * India's first ever regasification terminal, it has a large capacity and three storage tanks |
− | Phase 1: 2 tanks total of 148,000 | + | |
− | Phase 2: 1 tank total of 148,000 | + | +++ Technical Details |
− | Unloading capacity: | + | * Storage capacity: |
− | Send out capacity: | + | * Phase 1: 2 tanks total of 148,000 M^^3^^ |
− | Constructor: | + | * Phase 2: 1 tank total of 148,000 M^^3^^ |
− | Foster Wheeler was the project management consultant | + | * Unloading capacity: |
− | Toyo India: | + | * Send out capacity: |
− | Detailed engineering, onshore procurement, construction | + | * Constructor: |
− | EPC-LSTK contract for ’Topside Facility for Standby Jetty | + | * **Foster Wheeler** was the project management consultant |
− | IHI: Construction of LNG system and LNG tanks | + | * **Toyo India:** |
− | Second Expansion | + | * Detailed engineering, onshore procurement, construction |
− | Toyo: EPC work on a turnkey basis, from engineering to construction and commissioning | + | * EPC-LSTK contract for ’Topside Facility for Standby Jetty |
− | Ongoing Projects/Project Status | + | * **IHI:** Construction of LNG system and LNG tanks |
− | The Company has also initiated the process for setting-up a second LNG Jetty at Dahej. The second LNG Jetty is required for risk mitigation as well as to berth the higher capacity Q-Max and Q-Flex LNG vessels. | + | * Second Expansion |
− | The company has decided to increase the capacity by 5 MMTA | + | * **Toyo:** EPC work on a turnkey basis, from engineering to construction and commissioning |
− | Suppliers / Customers | + | |
− | Suppliers: | + | |
− | The company has already tied up 7.5 MMTPA of LNG with Ras Laffan Liquefied Natural Gas Co. Ltd. (RasGas), Qatar on a long term basis. | + | +++ Ongoing Projects/Project Status |
− | Petronet also purchases from GDF Suez | + | * The Company has also initiated the process for setting-up a second LNG Jetty at Dahej. The second LNG Jetty is required for risk mitigation as well as to berth the higher capacity Q-Max and Q-Flex LNG vessels. |
− | Gazprom Marketing & Trading Singapore and Gail signed a 20 year LNG supply deal for this and other terminals | + | * The company has decided to increase the capacity by 5 MMTA |
− | Customers: three off-takers, GAIL (India) Limited (GAIL), Indian Oil Corporation Limited (IOCL) and Bharat Petroleum Corporation Limited (BPCL) | + | |
− | History | + | +++ Suppliers / Customers |
− | 2000 - Contracts awarded | + | * Suppliers: |
− | 2003 - Mechanical Completion of Petronet LNG Facility at Dahej | + | * The company has already tied up 7.5 MMTPA of LNG with Ras Laffan Liquefied Natural Gas Co. Ltd. (RasGas), Qatar on a long term basis. |
− | 2004 - The first LNG ship from Ras Gas, Qatar arrived at the terminal | + | * Petronet also purchases from GDF Suez |
− | 2005 - Contract awarded for expansion project | + | * Gazprom Marketing & Trading Singapore and Gail signed a 20 year LNG supply deal for this and other terminals |
− | 2009 - The terminal has been expanded to 10 MMTPA. The expansion involved construction of 2 additional LNG storage tanks and other vaporization facilities. | + | * Customers: three off-takers, GAIL (India) Limited (GAIL), Indian Oil Corporation Limited (IOCL) and Bharat Petroleum Corporation Limited (BPCL) |
− | 2011 - Decision taken to expand terminal by 5 MMTA | + | |
− | 2012 - Toyo Engineering-India secured an EPC-LSTK contract for ’Topside Facility for Standby Jetty | + | |
− | 2012 - Gazprom Marketing & Trading Singapore and Gail sign 20 year LNG supply deal | + | +++ History |
− | 2014 - Toyo awarded expansion contract | + | * 2000 - Contracts awarded |
− | Other Information | + | * 2003 - Mechanical Completion of Petronet LNG Facility at Dahej |
− | The Asian Development Bank provided an Equity Investment of INR 446,75 million. It is currently looking to sell (Oct 2011) | + | * 2004 - The first LNG ship from Ras Gas, Qatar arrived at the terminal |
− | Relevant Links | + | * 2005 - Contract awarded for expansion project |
− | Terminal Webpage | + | * 2009 - The terminal has been expanded to 10 MMTPA. The expansion involved construction of 2 additional LNG storage tanks and other vaporization facilities. |
− | Foster Wheeler Awarded Indian LNG Contract | + | * 2011 - Decision taken to expand terminal by 5 MMTA |
− | Mechanical Completion of Petronet LNG Facility at Dahej | + | * 2012 - Toyo Engineering-India secured an EPC-LSTK contract for ’Topside Facility for Standby Jetty |
− | Toyo Engineering India, LNG Brochure | + | * 2012 - Gazprom Marketing & Trading Singapore and Gail sign 20 year LNG supply deal |
− | Order Received to Expand India's First LNG Receiving Terminal | + | * 2014 - Toyo awarded expansion contract |
− | Petronet LNG Ltd –Achieves yet again the highest profit | + | |
− | Project Page, Asian Development Bank | + | |
− | Petronet LNG and GDF SUEZ conclude a 0.6 million tons of LNG contract | + | +++ Other Information |
− | Toyo Engineering-India wins contract from Petronet LNG Ltd | + | * The Asian Development Bank provided an Equity Investment of INR 446,75 million. It is currently looking to sell (Oct 2011) |
− | Gazprom Marketing & Trading Singapore and Gail sign 20 year LNG supply deal | + | |
− | TOYO Awarded LNG Regasification Plant Project in India | + | +++ Relevant Links |
+ | # [http://www.petronetlng.com/Dahej_LNG_Terminal.aspx Terminal Webpage] | ||
+ | # [http://killajoules.wikidot.com/archive:foster-wheeler-awarded-indian-lng-contract Foster Wheeler Awarded Indian LNG Contract] | ||
+ | # [http://killajoules.wikidot.com/archive:mechanical-completion-of-petronet-lng-facility-at-da Mechanical Completion of Petronet LNG Facility at Dahej] | ||
+ | # [http://www.toyoindia.com/downloads/brochure_lng.pdf Toyo Engineering India, LNG Brochure] | ||
+ | # [http://killajoules.wikidot.com/archive:order-received-to-expand-india-s-first-lng-receiving Order Received to Expand India's First LNG Receiving Terminal] | ||
+ | # [http://killajoules.wikidot.com/blog:1083 Petronet LNG Ltd –Achieves yet again the highest profit] | ||
+ | # [http://pid.adb.org/pid/PsView.htm?projNo=37905&seqNo=01&typeCd=4 Project Page, Asian Development Bank] | ||
+ | # [http://killajoules.wikidot.com/blog:1572 Petronet LNG and GDF SUEZ conclude a 0.6 million tons of LNG contract] | ||
+ | # [http://killajoules.wikidot.com/blog:3069 Toyo Engineering-India wins contract from Petronet LNG Ltd] | ||
+ | # [http://killajoules.wikidot.com/blog:3198 Gazprom Marketing & Trading Singapore and Gail sign 20 year LNG supply deal] | ||
+ | # [http://killajoules.wikidot.com/blog:5010 TOYO Awarded LNG Regasification Plant Project in India] |
Revision as of 16:02, 30 December 2021
Summary Information
- Ownership: Petronet LNG
- Website: http://www.petronetlng.com/
- Location: Dahej, Gujarat, India
- Capacity: 10.0 million tons/annum
- Status: In Operation
+++ Brief Description
- India's first ever regasification terminal, it has a large capacity and three storage tanks
+++ Technical Details
- Storage capacity:
* Phase 1: 2 tanks total of 148,000 M^^3^^ * Phase 2: 1 tank total of 148,000 M^^3^^
- Unloading capacity:
- Send out capacity:
- Constructor:
* **Foster Wheeler** was the project management consultant * **Toyo India:** * Detailed engineering, onshore procurement, construction * EPC-LSTK contract for ’Topside Facility for Standby Jetty * **IHI:** Construction of LNG system and LNG tanks
- Second Expansion
* **Toyo:** EPC work on a turnkey basis, from engineering to construction and commissioning
+++ Ongoing Projects/Project Status
- The Company has also initiated the process for setting-up a second LNG Jetty at Dahej. The second LNG Jetty is required for risk mitigation as well as to berth the higher capacity Q-Max and Q-Flex LNG vessels.
- The company has decided to increase the capacity by 5 MMTA
+++ Suppliers / Customers
- Suppliers:
* The company has already tied up 7.5 MMTPA of LNG with Ras Laffan Liquefied Natural Gas Co. Ltd. (RasGas), Qatar on a long term basis. * Petronet also purchases from GDF Suez * Gazprom Marketing & Trading Singapore and Gail signed a 20 year LNG supply deal for this and other terminals
- Customers: three off-takers, GAIL (India) Limited (GAIL), Indian Oil Corporation Limited (IOCL) and Bharat Petroleum Corporation Limited (BPCL)
+++ History
- 2000 - Contracts awarded
- 2003 - Mechanical Completion of Petronet LNG Facility at Dahej
- 2004 - The first LNG ship from Ras Gas, Qatar arrived at the terminal
- 2005 - Contract awarded for expansion project
- 2009 - The terminal has been expanded to 10 MMTPA. The expansion involved construction of 2 additional LNG storage tanks and other vaporization facilities.
- 2011 - Decision taken to expand terminal by 5 MMTA
- 2012 - Toyo Engineering-India secured an EPC-LSTK contract for ’Topside Facility for Standby Jetty
- 2012 - Gazprom Marketing & Trading Singapore and Gail sign 20 year LNG supply deal
- 2014 - Toyo awarded expansion contract
+++ Other Information
- The Asian Development Bank provided an Equity Investment of INR 446,75 million. It is currently looking to sell (Oct 2011)
+++ Relevant Links
- Terminal Webpage
- Foster Wheeler Awarded Indian LNG Contract
- Mechanical Completion of Petronet LNG Facility at Dahej
- Toyo Engineering India, LNG Brochure
- Order Received to Expand India's First LNG Receiving Terminal
- Petronet LNG Ltd –Achieves yet again the highest profit
- Project Page, Asian Development Bank
- Petronet LNG and GDF SUEZ conclude a 0.6 million tons of LNG contract
- Toyo Engineering-India wins contract from Petronet LNG Ltd
- Gazprom Marketing & Trading Singapore and Gail sign 20 year LNG supply deal
- TOYO Awarded LNG Regasification Plant Project in India