* Ownership: Defa
 
* Ownership: Defa
* Website:
+
* Website: https://defa.com.cy/
 
* Location: Vasilikos, south coast of Cyprus
 
* Location: Vasilikos, south coast of Cyprus
* Capacity: million tons/annum
+
* Capacity: 1.9 million tons/annum
* Status: Planned
+
* Status: Under construction
 +
 
 
=== Brief Description ===
 
=== Brief Description ===
  
Line 15: Line 16:
 
* Unloading capacity:
 
* Unloading capacity:
 
* Send out capacity:
 
* Send out capacity:
* Constructor:
+
* Constructor:  
 +
** China Petroleum Pipeline Engineering CO LTD,
 +
** Metron SA,
 +
** Hudong-Zhonghua Shipbuilding
 +
** Wilhelmsen Ship Management
  
 
=== Ongoing Projects/Project Status ===
 
=== Ongoing Projects/Project Status ===
  
* Under construction, completion expected in [[LNG Terminal Projects to be Completed in 2022 | 2022]]
+
* Under construction, completion expected in [[LNG Terminal Projects to be Completed in 2023 | 2023]]
  
 
=== Suppliers / Customers ===
 
=== Suppliers / Customers ===
Line 39: Line 44:
 
=== Links ===
 
=== Links ===
 
# [http://www.mcit.gov.cy/mcit/mcit.nsf/dmlgas_en/dmlgas_en?OpenDocument Natural Gas, Cyprus]
 
# [http://www.mcit.gov.cy/mcit/mcit.nsf/dmlgas_en/dmlgas_en?OpenDocument Natural Gas, Cyprus]
 +
# [https://defa.com.cy/en/announcement-inner.html?id=23 €150 million funding approved for the introduction of LNG to Cyprus by the European Investment Bank]
 
# [https://abarrelfull.blogspot.com/2022/01/lng-terminal-milestone-project-for.html LNG Terminal – A milestone project for the energy role of Cyprus]
 
# [https://abarrelfull.blogspot.com/2022/01/lng-terminal-milestone-project-for.html LNG Terminal – A milestone project for the energy role of Cyprus]

Latest revision as of 10:01, 30 March 2022

Summary Information

  • Ownership: Defa
  • Website: https://defa.com.cy/
  • Location: Vasilikos, south coast of Cyprus
  • Capacity: 1.9 million tons/annum
  • Status: Under construction

Brief Description

  • The terminal will comprise of a Floating Storage Regasification Unit (FSRU), a jetty for the mooring of the FSRU, a jetty-borne gas pipeline

Technical Details

  • Storage capacity:
  • Unloading capacity:
  • Send out capacity:
  • Constructor:
    • China Petroleum Pipeline Engineering CO LTD,
    • Metron SA,
    • Hudong-Zhonghua Shipbuilding
    • Wilhelmsen Ship Management

Ongoing Projects/Project Status

  • Under construction, completion expected in 2023

Suppliers / Customers

  • Suppliers: TBA
  • Customers: Vasilikos Power Plant

History

  • 2020 - Contruction of the terminal was launched

Other Information

  • Financing of the project included
    • A 101 million euro subsidy by the European Commission, through “Connecting Europe Facility”
    • 43 million from the participation of EAC in the shareholding structure of ETYFA
    • 150 million euros from the European Investment Bank (EIB).
    • 80-million-euro financing by the European Bank for Reconstruction and Development