Difference between revisions of "Cyprus LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(10 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
* Ownership: Defa | * Ownership: Defa | ||
− | * Website: | + | * Website: https://defa.com.cy/ |
* Location: Vasilikos, south coast of Cyprus | * Location: Vasilikos, south coast of Cyprus | ||
− | * Capacity: million tons/annum | + | * Capacity: 1.9 million tons/annum |
− | * Status: | + | * Status: Under construction |
+ | |||
=== Brief Description === | === Brief Description === | ||
− | - | + | * The terminal will comprise of a Floating Storage Regasification Unit (FSRU), a jetty for the mooring of the FSRU, a jetty-borne gas pipeline |
+ | |||
=== Technical Details === | === Technical Details === | ||
Line 14: | Line 16: | ||
* Unloading capacity: | * Unloading capacity: | ||
* Send out capacity: | * Send out capacity: | ||
− | * Constructor: | + | * Constructor: |
− | * | + | ** China Petroleum Pipeline Engineering CO LTD, |
+ | ** Metron SA, | ||
+ | ** Hudong-Zhonghua Shipbuilding | ||
+ | ** Wilhelmsen Ship Management | ||
+ | |||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
− | * | + | * Under construction, completion expected in [[LNG Terminal Projects to be Completed in 2023 | 2023]] |
− | + | ||
=== Suppliers / Customers === | === Suppliers / Customers === | ||
Line 26: | Line 32: | ||
=== History === | === History === | ||
− | - | + | * 2020 - Contruction of the terminal was launched |
+ | |||
=== Other Information === | === Other Information === | ||
− | - | + | * Financing of the project included |
+ | ** A 101 million euro subsidy by the European Commission, through “Connecting Europe Facility” | ||
+ | ** 43 million from the participation of EAC in the shareholding structure of ETYFA | ||
+ | ** 150 million euros from the European Investment Bank (EIB). | ||
+ | ** 80-million-euro financing by the European Bank for Reconstruction and Development | ||
=== Links === | === Links === | ||
# [http://www.mcit.gov.cy/mcit/mcit.nsf/dmlgas_en/dmlgas_en?OpenDocument Natural Gas, Cyprus] | # [http://www.mcit.gov.cy/mcit/mcit.nsf/dmlgas_en/dmlgas_en?OpenDocument Natural Gas, Cyprus] | ||
− | # [ | + | # [https://defa.com.cy/en/announcement-inner.html?id=23 €150 million funding approved for the introduction of LNG to Cyprus by the European Investment Bank] |
+ | # [https://abarrelfull.blogspot.com/2022/01/lng-terminal-milestone-project-for.html LNG Terminal – A milestone project for the energy role of Cyprus] |
Latest revision as of 10:01, 30 March 2022
Contents
Summary Information
- Ownership: Defa
- Website: https://defa.com.cy/
- Location: Vasilikos, south coast of Cyprus
- Capacity: 1.9 million tons/annum
- Status: Under construction
Brief Description
- The terminal will comprise of a Floating Storage Regasification Unit (FSRU), a jetty for the mooring of the FSRU, a jetty-borne gas pipeline
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
- China Petroleum Pipeline Engineering CO LTD,
- Metron SA,
- Hudong-Zhonghua Shipbuilding
- Wilhelmsen Ship Management
Ongoing Projects/Project Status
- Under construction, completion expected in 2023
Suppliers / Customers
- Suppliers: TBA
- Customers: Vasilikos Power Plant
History
- 2020 - Contruction of the terminal was launched
Other Information
- Financing of the project included
- A 101 million euro subsidy by the European Commission, through “Connecting Europe Facility”
- 43 million from the participation of EAC in the shareholding structure of ETYFA
- 150 million euros from the European Investment Bank (EIB).
- 80-million-euro financing by the European Bank for Reconstruction and Development