Difference between revisions of "Cyprus LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Defa Website: Location: Vasilikos, south coast of Cyprus Capacity: million tons/annum Status: Planned Brief Description - Technical Details S...") |
Abarrelfull (talk | contribs) |
||
(13 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | Ownership: Defa | + | * Ownership: Defa |
− | Website: | + | * Website: https://defa.com.cy/ |
− | Location: Vasilikos, south coast of Cyprus | + | * Location: Vasilikos, south coast of Cyprus |
− | Capacity: million tons/annum | + | * Capacity: 1.9 million tons/annum |
− | Status: | + | * Status: Under construction |
− | |||
− | + | === Brief Description === | |
− | |||
− | Storage | + | * The terminal will comprise of a Floating Storage Regasification Unit (FSRU), a jetty for the mooring of the FSRU, a jetty-borne gas pipeline |
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | === Technical Details === | |
− | |||
− | |||
− | + | * Storage capacity: | |
− | + | * Unloading capacity: | |
− | + | * Send out capacity: | |
+ | * Constructor: | ||
+ | ** China Petroleum Pipeline Engineering CO LTD, | ||
+ | ** Metron SA, | ||
+ | ** Hudong-Zhonghua Shipbuilding | ||
+ | ** Wilhelmsen Ship Management | ||
− | + | === Ongoing Projects/Project Status === | |
− | |||
− | + | * Under construction, completion expected in [[LNG Terminal Projects to be Completed in 2023 | 2023]] | |
− | |||
− | Natural Gas, Cyprus | + | === Suppliers / Customers === |
− | Cyprus | + | |
+ | * Suppliers: TBA | ||
+ | * Customers: Vasilikos Power Plant | ||
+ | === History === | ||
+ | |||
+ | * 2020 - Contruction of the terminal was launched | ||
+ | |||
+ | === Other Information === | ||
+ | |||
+ | * Financing of the project included | ||
+ | ** A 101 million euro subsidy by the European Commission, through “Connecting Europe Facility” | ||
+ | ** 43 million from the participation of EAC in the shareholding structure of ETYFA | ||
+ | ** 150 million euros from the European Investment Bank (EIB). | ||
+ | ** 80-million-euro financing by the European Bank for Reconstruction and Development | ||
+ | |||
+ | === Links === | ||
+ | # [http://www.mcit.gov.cy/mcit/mcit.nsf/dmlgas_en/dmlgas_en?OpenDocument Natural Gas, Cyprus] | ||
+ | # [https://defa.com.cy/en/announcement-inner.html?id=23 €150 million funding approved for the introduction of LNG to Cyprus by the European Investment Bank] | ||
+ | # [https://abarrelfull.blogspot.com/2022/01/lng-terminal-milestone-project-for.html LNG Terminal – A milestone project for the energy role of Cyprus] |
Latest revision as of 10:01, 30 March 2022
Contents
Summary Information
- Ownership: Defa
- Website: https://defa.com.cy/
- Location: Vasilikos, south coast of Cyprus
- Capacity: 1.9 million tons/annum
- Status: Under construction
Brief Description
- The terminal will comprise of a Floating Storage Regasification Unit (FSRU), a jetty for the mooring of the FSRU, a jetty-borne gas pipeline
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
- China Petroleum Pipeline Engineering CO LTD,
- Metron SA,
- Hudong-Zhonghua Shipbuilding
- Wilhelmsen Ship Management
Ongoing Projects/Project Status
- Under construction, completion expected in 2023
Suppliers / Customers
- Suppliers: TBA
- Customers: Vasilikos Power Plant
History
- 2020 - Contruction of the terminal was launched
Other Information
- Financing of the project included
- A 101 million euro subsidy by the European Commission, through “Connecting Europe Facility”
- 43 million from the participation of EAC in the shareholding structure of ETYFA
- 150 million euros from the European Investment Bank (EIB).
- 80-million-euro financing by the European Bank for Reconstruction and Development