Difference between revisions of "Cyprus LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
Line 32: Line 32:
 
=== Links ===
 
=== Links ===
 
# [http://www.mcit.gov.cy/mcit/mcit.nsf/dmlgas_en/dmlgas_en?OpenDocument Natural Gas, Cyprus]
 
# [http://www.mcit.gov.cy/mcit/mcit.nsf/dmlgas_en/dmlgas_en?OpenDocument Natural Gas, Cyprus]
# [http://www.bloomberg.com/news/2010-12-31/cyprus-power-authority-will-consult-partner-on-lng-terminal.html Cyprus Power Authority
+
# [http://www.bloomberg.com/news/2010-12-31/cyprus-power-authority-will-consult-partner-on-lng-terminal.html Cyprus Power Authority]

Revision as of 10:39, 22 August 2020

Summary Information

Ownership: Defa Website: Location: Vasilikos, south coast of Cyprus Capacity: million tons/annum Status: Planned Brief Description

- Technical Details

Storage capacity: Unloading capacity: Send out capacity: Constructor: Licensor: Ongoing Projects/Project Status

The Energy Centre will be built on the south coast of Cyprus, at a distance of 25Km east of Limassol, in the area formerly occupied by the Hellenic Chemical Industries fertiliser manufacturing facility. This area was considered as the most appropriate for the erection of storage and distribution facilities for petroleum products, as well as for the establishment of a receiving and storage terminal for LNG, due to its location and nature. Initially, natural gas will be mainly used by the nearby Power Station of the Electricity Authority of Cyprus (EAC) for power generation; hence the site chosen for locating the Energy Centre borders the aforesaid Power Station. The terminal is expected to be operational by 2014 Suppliers / Customers

Suppliers: TBA Customers: Vasilikos Power Plant History

- Other Information

-

Links

  1. Natural Gas, Cyprus
  2. Cyprus Power Authority