Difference between revisions of "Cyprus LNG Terminal"
Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Defa Website: Location: Vasilikos, south coast of Cyprus Capacity: million tons/annum Status: Planned Brief Description - Technical Details S...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
Ownership: Defa | Ownership: Defa | ||
Line 30: | Line 30: | ||
- | - | ||
− | + | === Links === | |
− | + | # [http://www.mcit.gov.cy/mcit/mcit.nsf/dmlgas_en/dmlgas_en?OpenDocument Natural Gas, Cyprus] | |
− | Natural Gas, Cyprus | + | # [http://www.bloomberg.com/news/2010-12-31/cyprus-power-authority-will-consult-partner-on-lng-terminal.html Cyprus Power Authority |
− | Cyprus Power Authority |
Revision as of 10:38, 22 August 2020
Summary Information
Ownership: Defa Website: Location: Vasilikos, south coast of Cyprus Capacity: million tons/annum Status: Planned Brief Description
- Technical Details
Storage capacity: Unloading capacity: Send out capacity: Constructor: Licensor: Ongoing Projects/Project Status
The Energy Centre will be built on the south coast of Cyprus, at a distance of 25Km east of Limassol, in the area formerly occupied by the Hellenic Chemical Industries fertiliser manufacturing facility. This area was considered as the most appropriate for the erection of storage and distribution facilities for petroleum products, as well as for the establishment of a receiving and storage terminal for LNG, due to its location and nature. Initially, natural gas will be mainly used by the nearby Power Station of the Electricity Authority of Cyprus (EAC) for power generation; hence the site chosen for locating the Energy Centre borders the aforesaid Power Station. The terminal is expected to be operational by 2014 Suppliers / Customers
Suppliers: TBA Customers: Vasilikos Power Plant History
- Other Information
-