Difference between revisions of "Culzean Gas and Condensate Field"

From A Barrel Full
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 11: Line 11:
 
=== Description ===
 
=== Description ===
 
* The Culzean project development is an ultra high-pressure, high-temperature (uHPHT) gas condensate development located approximately 145 miles East of Aberdeen in the UK sector of the Central North Sea.  
 
* The Culzean project development is an ultra high-pressure, high-temperature (uHPHT) gas condensate development located approximately 145 miles East of Aberdeen in the UK sector of the Central North Sea.  
* The field development comprises of three platforms; wellhead platform (WHP), central processing platform (CPF) with flare tower and separate living quarters and utility platform (ULQ) plus an FSO for storing condensate
+
* The field development comprises of three platforms; wellhead platform (WHP), central processing platform (CPF) with flare tower and separate living quarters and utility platform (ULQ) plus [[Culzean Ailsa FSO]] for storing condensate
The FSO will have receiving capacity of 25,000 barrels of condensate per day and storage capacity of 350,000 barrels.
+
* The FSO has a receiving capacity of 25,000 barrels of condensate per day and storage capacity of 350,000 barrels.
 
* The Culzean development is one of the largest gas discoveries of recent years in the UK North Sea, located in water depths of about 88m and the reservoir around 4,300m below sea level
 
* The Culzean development is one of the largest gas discoveries of recent years in the UK North Sea, located in water depths of about 88m and the reservoir around 4,300m below sea level
  
Line 31: Line 31:
 
* 2022 - NEO acquired a stake from JX Nippon
 
* 2022 - NEO acquired a stake from JX Nippon
  
=== Geology
+
=== Geology ===
 
*
 
*
  
 
=== Links ===
 
=== Links ===
 +
# [[UK Oil and Gas Fields by Approval Date]]
 
# [http://killajoules.wikidot.com/archive:gas-discovery-in-culzean-prospect-in-uk-north-sea/ Gas discovery in Culzean prospect in UK North Sea]
 
# [http://killajoules.wikidot.com/archive:gas-discovery-in-culzean-prospect-in-uk-north-sea/ Gas discovery in Culzean prospect in UK North Sea]
 
# [http://killajoules.wikidot.com/blog:618 Eni announces a significant hydrocarbon discovery in the UK sector of the Central North Sea]
 
# [http://killajoules.wikidot.com/blog:618 Eni announces a significant hydrocarbon discovery in the UK sector of the Central North Sea]

Latest revision as of 17:52, 11 November 2023

Summary Information

  • Operator: TotalEnergies
  • Country: UK
  • Location: Block 22/25a in the UK North Sea
  • Production start:
  • Partners: TotalEnergies (49.99%), NEO (34.01%) and Britoil (BP) (16%)
  • Type: Gas & Condensate
  • Estimated Reserves:
  • Production Volume:

Description

  • The Culzean project development is an ultra high-pressure, high-temperature (uHPHT) gas condensate development located approximately 145 miles East of Aberdeen in the UK sector of the Central North Sea.
  • The field development comprises of three platforms; wellhead platform (WHP), central processing platform (CPF) with flare tower and separate living quarters and utility platform (ULQ) plus Culzean Ailsa FSO for storing condensate
  • The FSO has a receiving capacity of 25,000 barrels of condensate per day and storage capacity of 350,000 barrels.
  • The Culzean development is one of the largest gas discoveries of recent years in the UK North Sea, located in water depths of about 88m and the reservoir around 4,300m below sea level

Contractors

  • **KBR:** Front end engineering and design (FEED) for the topsides
  • **INTECSEA:** Subsea front-end engineering and design (FEED)
  • **SMOE:** Fabrication of Central Processing Facility plus 2 connecting bridges, Wellhead Platform and Utilities & Living Quarters Platform Topsides
  • **MODEC:** Engineering, procurement and construction (EPC) of the FSO
  • **SOFEC:** Design and supply of the Internal Turret mooring system for the FSO

History

  • 2009 - Culzean Gas And Condensate Field discovered
  • 2012 - JX Nippon acquires an additional stake from ENI
  • 2014 - Final investment decision announced
  • 2015 - Development approval awarded
  • 2017 - Total acquired the majority stake in its take over of Maersk
  • 2018 - FSO completed
  • 2022 - NEO acquired a stake from JX Nippon

Geology

Links

  1. UK Oil and Gas Fields by Approval Date
  2. Gas discovery in Culzean prospect in UK North Sea
  3. Eni announces a significant hydrocarbon discovery in the UK sector of the Central North Sea
  4. Major asset acquisition in the UKCS
  5. Oil & Gas UK Welcomes The News That BG Group and Maersk Oil Will Develop Two New Projects
  6. KBR wins Maersk Oil FEED Contract for the Culzean Field Development Topsides
  7. INTECSEA Announces Award of the Maersk Culzean Project
  8. Field Development Plan approved for Culzean in UK North Sea
  9. Sembcorp Marine Subsidiary Smoe Secures An EPC Contract To Build Three Topsides For The Culzean Field Development In The UK North Sea
  10. MODEC Awarded Contract to Provide FSO for Maersk Oil’s Culzean Field; A Significant Milestone for MODEC in Gaining Entry into North Sea
  11. Sembcorp Marine completes world’s first Floating Storage and Offloading vessel with a 40-year hull lifespan
  12. Total acquires Maersk Oil for $7.45 billion in a share and debt transaction
  13. Acquisition of JX Nippon Exploration and Production (U.K.) Limited