=== Summary Information ===
 
=== Summary Information ===
  
* Ownership:  
+
* Ownership: Dioriga Gas
* Website:  
+
* Website: https://dioriga.gr/
* Location:  
+
* Location: Corinth, Greece
 
* Capacity: million tons/annum
 
* Capacity: million tons/annum
* Status:  
+
* Status: Planning
 +
 
 
=== Brief Description ===
 
=== Brief Description ===
 
+
* Dioriga Gas will be a near shore LNG (Liquified Natural Gas) import terminal based on the Floating Storage and Regasification Unit (FSRU) configuration.
 +
* It will have a maximum storage capacity up to 210.000 m3 LNG
 +
* It includes a jetty/ trestle, including a central platform, breasting and mooring dolphins, for the permanent berthing of the FSRU at about 150 m from the coastline and at depths of up to 25 m Mean Sea Level
  
 
=== Technical Details ===
 
=== Technical Details ===
  
* Storage capacity:  
+
* Storage capacity: 210.000 m3 LNG
* Unloading capacity:
+
* Unloading capacity: 10,000 m3/hr
* Send out capacity:
+
* Send out capacity: 132,000 MWh/day
 
* Constructor:
 
* Constructor:
 
* Licensor:
 
* Licensor:
 +
 
=== Ongoing Projects/Project Status ===
 
=== Ongoing Projects/Project Status ===
 
+
* We expect the project to be completed in [[LNG Terminal Projects to be Completed in 2024 | 2024]]
  
 
=== Suppliers / Customers ===
 
=== Suppliers / Customers ===
  
 
* Suppliers:
 
* Suppliers:
* Customers:
+
* Customers:  
 +
** The Bulgarian and other markets will be supplied via the [[Greece-Bulgaria Interconnector ICGB]]
 +
 
 
=== History ===
 
=== History ===
  
* 200X -  
+
* 2021 - Agreement signed for connection to grid
 +
* 2022 - Non binding market test process completed
 +
* 2023 - Second phase of Market test completed
 +
 
 
=== Other Information ===
 
=== Other Information ===
  
 
-
 
-
 
=== Links ===
 
=== Links ===
#
+
# [https://lng-news.blogspot.com/2021/06/signing-of-advanced-reservation-of.html Signing of Advanced Reservation of Capacity Agreement (ARCA) between DESFA and Dioriga Gas]
 +
# [https://lng-news.blogspot.com/2022/01/the-first-phase-of-market-test-for.html The First phase of the Market Test for Dioriga Gas was successfully completed]
 +
# [https://lng-news.blogspot.com/2023/02/second-phase-of-market-test-for-corinth.html Second phase of Market test for Corinth FSRU]
 +
 
 +
[[category:LNG]]
 +
[[category:Greece]]

Latest revision as of 11:38, 10 February 2023

Summary Information

  • Ownership: Dioriga Gas
  • Website: https://dioriga.gr/
  • Location: Corinth, Greece
  • Capacity: million tons/annum
  • Status: Planning

Brief Description

  • Dioriga Gas will be a near shore LNG (Liquified Natural Gas) import terminal based on the Floating Storage and Regasification Unit (FSRU) configuration.
  • It will have a maximum storage capacity up to 210.000 m3 LNG
  • It includes a jetty/ trestle, including a central platform, breasting and mooring dolphins, for the permanent berthing of the FSRU at about 150 m from the coastline and at depths of up to 25 m Mean Sea Level

Technical Details

  • Storage capacity: 210.000 m3 LNG
  • Unloading capacity: 10,000 m3/hr
  • Send out capacity: 132,000 MWh/day
  • Constructor:
  • Licensor:

Ongoing Projects/Project Status

  • We expect the project to be completed in 2024

Suppliers / Customers

History

  • 2021 - Agreement signed for connection to grid
  • 2022 - Non binding market test process completed
  • 2023 - Second phase of Market test completed

Other Information

-

Links

  1. Signing of Advanced Reservation of Capacity Agreement (ARCA) between DESFA and Dioriga Gas
  2. The First phase of the Market Test for Dioriga Gas was successfully completed
  3. Second phase of Market test for Corinth FSRU