Difference between revisions of "Corinth LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: * Website: * Location: * Capacity: million tons/annum * Status: === Brief Description === === Technical Details === * Storage...") |
Abarrelfull (talk | contribs) |
||
(8 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Ownership: | + | * Ownership: Dioriga Gas |
− | * Website: | + | * Website: https://dioriga.gr/ |
− | * Location: | + | * Location: Corinth, Greece |
* Capacity: million tons/annum | * Capacity: million tons/annum | ||
− | * Status: | + | * Status: Planning |
+ | |||
=== Brief Description === | === Brief Description === | ||
− | + | * Dioriga Gas will be a near shore LNG (Liquified Natural Gas) import terminal based on the Floating Storage and Regasification Unit (FSRU) configuration. | |
+ | * It will have a maximum storage capacity up to 210.000 m3 LNG | ||
+ | * It includes a jetty/ trestle, including a central platform, breasting and mooring dolphins, for the permanent berthing of the FSRU at about 150 m from the coastline and at depths of up to 25 m Mean Sea Level | ||
=== Technical Details === | === Technical Details === | ||
− | * Storage capacity: | + | * Storage capacity: 210.000 m3 LNG |
− | * Unloading capacity: | + | * Unloading capacity: 10,000 m3/hr |
− | * Send out capacity: | + | * Send out capacity: 132,000 MWh/day |
* Constructor: | * Constructor: | ||
* Licensor: | * Licensor: | ||
+ | |||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
− | + | * We expect the project to be completed in [[LNG Terminal Projects to be Completed in 2024 | 2024]] | |
=== Suppliers / Customers === | === Suppliers / Customers === | ||
* Suppliers: | * Suppliers: | ||
− | * Customers: | + | * Customers: |
+ | ** The Bulgarian and other markets will be supplied via the [[Greece-Bulgaria Interconnector ICGB]] | ||
+ | |||
=== History === | === History === | ||
− | * | + | * 2021 - Agreement signed for connection to grid |
+ | * 2022 - Non binding market test process completed | ||
+ | * 2023 - Second phase of Market test completed | ||
+ | |||
=== Other Information === | === Other Information === | ||
- | - | ||
=== Links === | === Links === | ||
− | # | + | # [https://lng-news.blogspot.com/2021/06/signing-of-advanced-reservation-of.html Signing of Advanced Reservation of Capacity Agreement (ARCA) between DESFA and Dioriga Gas] |
+ | # [https://lng-news.blogspot.com/2022/01/the-first-phase-of-market-test-for.html The First phase of the Market Test for Dioriga Gas was successfully completed] | ||
+ | # [https://lng-news.blogspot.com/2023/02/second-phase-of-market-test-for-corinth.html Second phase of Market test for Corinth FSRU] | ||
+ | |||
+ | [[category:LNG]] | ||
+ | [[category:Greece]] |
Latest revision as of 11:38, 10 February 2023
Contents
Summary Information
- Ownership: Dioriga Gas
- Website: https://dioriga.gr/
- Location: Corinth, Greece
- Capacity: million tons/annum
- Status: Planning
Brief Description
- Dioriga Gas will be a near shore LNG (Liquified Natural Gas) import terminal based on the Floating Storage and Regasification Unit (FSRU) configuration.
- It will have a maximum storage capacity up to 210.000 m3 LNG
- It includes a jetty/ trestle, including a central platform, breasting and mooring dolphins, for the permanent berthing of the FSRU at about 150 m from the coastline and at depths of up to 25 m Mean Sea Level
Technical Details
- Storage capacity: 210.000 m3 LNG
- Unloading capacity: 10,000 m3/hr
- Send out capacity: 132,000 MWh/day
- Constructor:
- Licensor:
Ongoing Projects/Project Status
- We expect the project to be completed in 2024
Suppliers / Customers
- Suppliers:
- Customers:
- The Bulgarian and other markets will be supplied via the Greece-Bulgaria Interconnector ICGB
History
- 2021 - Agreement signed for connection to grid
- 2022 - Non binding market test process completed
- 2023 - Second phase of Market test completed
Other Information
-