Difference between revisions of "Coral South LNG Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
Line 34: | Line 34: | ||
* 2017 - Project implementation phase launched | * 2017 - Project implementation phase launched | ||
* 2018 - Construction of the hull began | * 2018 - Construction of the hull began | ||
+ | * 2022 - First gas produced | ||
=== Other Information === | === Other Information === |
Revision as of 17:02, 21 June 2022
Contents
Summary Information
- Ownership:
- Eni East Africa (EEA) - 70% (Eni - 71.4%, CNPC - 28.6%)
- Galp Energia, South Korea’s Kogas and Mozambique’s Empresa Nacional de Hidrocarbonetos (ENH), each hold 10% stake
- Website:
- Location: Rovuma Basin, Offshore Mozambique
- Capacity: 3.4 million tons/annum
- Status: Under Construction
Brief Description
- The Floating Liquefied Natural Gas (FLNG) unit, a symbol of engineering expertise, will have a capacity of around 3.4 MTPA (million tons per year) and will be the first FLNG in Africa
Technical Details
- Storage capacity:
- Constructor:
- **TechnipFMC, JGC Corporation and Samsung Heavy Industries:** Engineering, Procurement, Construction, Installation, Commissioning and Start-up (EPCIC) of the Coral South FLNG facility and its associated risers and subsea flowlines system, as well as the installation of the umbilicals and subsea equipment.
- **Samsung** is constructing the hull and topsides
- **Baker Hughes:** Supply of four Turbo-compression trains for mix refrigeration services, and four Turbo-generation units
- **Sofec:** Turret Mooring System
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 2022
Suppliers / Customers
- Suppliers: Gas is supplied by the Coral Gas Field
- Customers: BP will purchase all the LNG produced
History
- 2012 - Coral gas field discovered
- 2014 - KBR Daewoo Consortium Wins FEED Contract
- 2016 - BP signed contract to off-take all the LNG produced
- 2017 - Project implementation phase launched
- 2018 - Construction of the hull began
- 2022 - First gas produced
Other Information
- Korea Eximbank is financing about 23% of the project
Links
- KBR Daewoo Consortium Wins FLNG FEED Contract/Competes for EPCIC
- Eni and its partners in Area 4, offshore Mozambique, sign with BP a binding agreement for the sale of LNG produced in Coral South
- Korea Eximbank·K-sure, KOGAS, and Samsung Heavy Industries collaborate on Coral South FLNG Project in Mozambique
- TechnipFMC awarded a major integrated contract for the Coral South FLNG project offshore Mozambique
- Eni launches Coral South project in Mozambique
- Baker Hughes, A GE Company Awarded Second Major Contract For ENI East Africa’s Coral South FLNG
- SOFEC Awarded Turret Mooring System Contract for ENI Coral South FLNG Project Mozambique
- Eni begins construction of the Hull for Coral South Floating LNG Unit
- Coral South Introduces Hydrocarbons to FLNG Offshore Mozambique