Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Talisman * Country: UK * Location: North Sea * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume:...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: Talisman | * Operator: Talisman | ||
* Country: UK | * Country: UK | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The Clyde field, plus satellites Leven and Medwin, is located on block 30/17b | * The Clyde field, plus satellites Leven and Medwin, is located on block 30/17b | ||
* It consists of a single large manned steel platform | * It consists of a single large manned steel platform | ||
* Gas from the [[[Affleck Oil Field]]] is transported to the Clyde Platform | * Gas from the [[[Affleck Oil Field]]] is transported to the Clyde Platform | ||
− | + | ==== Flyndre & Cawdor ==== | |
* The Flyndre field was discovered in 1974 and straddles the UK/Norway median line. Cawdor was discovered in 2008. The fields will be co-developed as a subsea tie-back to Clyde | * The Flyndre field was discovered in 1974 and straddles the UK/Norway median line. Cawdor was discovered in 2008. The fields will be co-developed as a subsea tie-back to Clyde | ||
* Flyndre will be developed with a single production well. The Cawdor field will be developed initially with a single production well, with potential development of two further wells | * Flyndre will be developed with a single production well. The Cawdor field will be developed initially with a single production well, with potential development of two further wells | ||
− | + | === Contractors === | |
* **McDermott:** Construction of Clyde Platform | * **McDermott:** Construction of Clyde Platform | ||
* **Heerema Marine Contractors:** Platform Installation | * **Heerema Marine Contractors:** Platform Installation | ||
* **Proserv:** Electro-hydraulic multiplex subsea control systems, along with its associated topside and subsea interface systems | * **Proserv:** Electro-hydraulic multiplex subsea control systems, along with its associated topside and subsea interface systems | ||
− | * **Global Maritime:** Warranty surveyor for 16” piggy-backed, | + | * **Global Maritime:** Warranty surveyor for 16” piggy-backed, trenched infield pipeline - Clyde Q1-B Project |
− | + | ==== Flyndre & Cawdor ==== | |
− | * **Aker Solutions:** | + | * **Aker Solutions:** EPCI contract – engineering, procurement, construction and installation |
− | + | === History === | |
* 1982 - Field development approval granted | * 1982 - Field development approval granted | ||
* 1992 - Leven development approved | * 1992 - Leven development approved | ||
Line 35: | Line 35: | ||
* 2014 - Flyndre and Cawdor field development approval | * 2014 - Flyndre and Cawdor field development approval | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [[UK Oil and Gas Fields by Approval Date]] | # [[UK Oil and Gas Fields by Approval Date]] | ||
# [[List Of Oil Production Platforms In The UK]] | # [[List Of Oil Production Platforms In The UK]] |
Revision as of 15:49, 31 August 2023
Contents
Summary Information
- Operator: Talisman
- Country: UK
- Location: North Sea
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Clyde field, plus satellites Leven and Medwin, is located on block 30/17b
- It consists of a single large manned steel platform
- Gas from the [[[Affleck Oil Field]]] is transported to the Clyde Platform
Flyndre & Cawdor
- The Flyndre field was discovered in 1974 and straddles the UK/Norway median line. Cawdor was discovered in 2008. The fields will be co-developed as a subsea tie-back to Clyde
- Flyndre will be developed with a single production well. The Cawdor field will be developed initially with a single production well, with potential development of two further wells
Contractors
- **McDermott:** Construction of Clyde Platform
- **Heerema Marine Contractors:** Platform Installation
- **Proserv:** Electro-hydraulic multiplex subsea control systems, along with its associated topside and subsea interface systems
- **Global Maritime:** Warranty surveyor for 16” piggy-backed, trenched infield pipeline - Clyde Q1-B Project
Flyndre & Cawdor
- **Aker Solutions:** EPCI contract – engineering, procurement, construction and installation
History
- 1982 - Field development approval granted
- 1992 - Leven development approved
- 1993 - Medwin development approved
- 1996 - BP sells the field to Talisman
- 2014 - Flyndre and Cawdor field development approval
Geology
Links
- UK Oil and Gas Fields by Approval Date
- List Of Oil Production Platforms In The UK
- List Of Oil and Gas Production Platforms In The UK
- FoundOcean Europe Subsea References
- Global Maritime Pipeline References
- Serimax Pipeline References
- BP Considers Sale of Interests in 'MAST' Oilfields
- BP's Beatrice, Buchan and Clyde Fields - Sale Completed
- Proserv seals double subsea contracts win
- Flyndre and Cawdor field development approval supports Maersk Oil UK’s growth ambitions