(Created page with "Summary Information * Operator: Talisman * Country: UK * Location: North Sea * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume:...")
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
 
* Operator: Talisman  
 
* Operator: Talisman  
 
* Country: UK
 
* Country: UK
Line 9: Line 9:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
 
* The Clyde field, plus satellites Leven and Medwin, is located on block 30/17b  
 
* The Clyde field, plus satellites Leven and Medwin, is located on block 30/17b  
 
* It consists of a single large manned steel platform
 
* It consists of a single large manned steel platform
 
* Gas from the [[[Affleck Oil Field]]] is transported to the Clyde Platform
 
* Gas from the [[[Affleck Oil Field]]] is transported to the Clyde Platform
  
++++ Flyndre & Cawdor  
+
==== Flyndre & Cawdor ====
 
* The Flyndre field was discovered in 1974 and straddles the UK/Norway median line. Cawdor was discovered in 2008. The fields will be co-developed as a subsea tie-back to Clyde
 
* The Flyndre field was discovered in 1974 and straddles the UK/Norway median line. Cawdor was discovered in 2008. The fields will be co-developed as a subsea tie-back to Clyde
 
* Flyndre will be developed with a single production well. The Cawdor field will be developed initially with a single production well, with potential development of two further wells
 
* Flyndre will be developed with a single production well. The Cawdor field will be developed initially with a single production well, with potential development of two further wells
  
+++ Contractors
+
=== Contractors ===
 
* **McDermott:** Construction of Clyde Platform
 
* **McDermott:** Construction of Clyde Platform
 
* **Heerema Marine Contractors:** Platform Installation
 
* **Heerema Marine Contractors:** Platform Installation
 
* **Proserv:** Electro-hydraulic multiplex subsea control systems, along with its associated topside and subsea interface systems
 
* **Proserv:** Electro-hydraulic multiplex subsea control systems, along with its associated topside and subsea interface systems
* **Global Maritime:** Warranty surveyor for  16” piggy-backed, trenched infield pipeline - Clyde Q1-B Project
+
* **Global Maritime:** Warranty surveyor for  16” piggy-backed, trenched infield pipeline - Clyde Q1-B Project
  
++++ Flyndre & Cawdor
+
==== Flyndre & Cawdor ====
  
* **Aker Solutions:** EPCI contract – engineering, procurement, construction and installation
+
* **Aker Solutions:** EPCI contract – engineering, procurement, construction and installation
  
+++ History
+
=== History ===
 
* 1982 - Field development approval granted
 
* 1982 - Field development approval granted
 
* 1992 - Leven development approved
 
* 1992 - Leven development approved
Line 35: Line 35:
 
* 2014 - Flyndre and Cawdor field development approval  
 
* 2014 - Flyndre and Cawdor field development approval  
  
+++ Geology
+
=== Geology ===
 
*  
 
*  
  
+++ Links
+
=== Links ===
 
# [[UK Oil and Gas Fields by Approval Date]]
 
# [[UK Oil and Gas Fields by Approval Date]]
 
# [[List Of Oil Production Platforms In The UK]]
 
# [[List Of Oil Production Platforms In The UK]]

Revision as of 15:49, 31 August 2023

Summary Information

  • Operator: Talisman
  • Country: UK
  • Location: North Sea
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Clyde field, plus satellites Leven and Medwin, is located on block 30/17b
  • It consists of a single large manned steel platform
  • Gas from the [[[Affleck Oil Field]]] is transported to the Clyde Platform

Flyndre & Cawdor

  • The Flyndre field was discovered in 1974 and straddles the UK/Norway median line. Cawdor was discovered in 2008. The fields will be co-developed as a subsea tie-back to Clyde
  • Flyndre will be developed with a single production well. The Cawdor field will be developed initially with a single production well, with potential development of two further wells

Contractors

  • **McDermott:** Construction of Clyde Platform
  • **Heerema Marine Contractors:** Platform Installation
  • **Proserv:** Electro-hydraulic multiplex subsea control systems, along with its associated topside and subsea interface systems
  • **Global Maritime:** Warranty surveyor for 16” piggy-backed, trenched infield pipeline - Clyde Q1-B Project

Flyndre & Cawdor

  • **Aker Solutions:** EPCI contract – engineering, procurement, construction and installation

History

  • 1982 - Field development approval granted
  • 1992 - Leven development approved
  • 1993 - Medwin development approved
  • 1996 - BP sells the field to Talisman
  • 2014 - Flyndre and Cawdor field development approval

Geology

Links

  1. UK Oil and Gas Fields by Approval Date
  2. List Of Oil Production Platforms In The UK
  3. List Of Oil and Gas Production Platforms In The UK
  4. FoundOcean Europe Subsea References
  5. Global Maritime Pipeline References
  6. Serimax Pipeline References
  7. BP Considers Sale of Interests in 'MAST' Oilfields
  8. BP's Beatrice, Buchan and Clyde Fields - Sale Completed
  9. Proserv seals double subsea contracts win
  10. Flyndre and Cawdor field development approval supports Maersk Oil UK’s growth ambitions