Clipper Oil and Gas Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: ATP
  • Country: USA
  • Location: Green Canyon Blocks 299 & 300, Gulf of Mexico
  • Production start: 2013
  • Partners:
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • This field is located in Green Canyon Block 299, at a water depth of 1,055 meters (3,460 feet) and is tied back to the [[[Front Runner Oil Field]]].


+++ Contractors

  • **Technip:**
* design and manufacture of two high pressure flexible risers, approximately 2.4 kilometers long each (1.5 mile),
* engineering for the installation and welding of one pipe-in-pipe oil production flowline and one gas line, each approximately 25 kilometers long (15.5 miles),
* installation of the flowlines, risers, and umbilical,
* fabrication and installation of four subsea structures and associated jumpers, flying leads, and
* pre-commissioning.

+++ History

  • 2005 - Clipper Oil And Gas Field discovered
  • 2009 - Technip awarded SURF contract
  • 2012 - Successful Clipper Well Test completed
  • 2013 - First production

+++ Geology

+++ Links

  1. [[[Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields]]]
  2. Technip awarded two contracts by Bluewater Industries in the Gulf of Mexico
  3. ATP Marks Successful Clipper Well Test