Cliff Head Oil Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: ROC Oil
  • Country: Australia
  • Location: Perth Basin, WA-286-P
  • Production start: 2006
  • Partners:
  • Type: Oil
  • Estimated Reserves: 80 - 100 million barrels of oil in place (“MMBOIP”)
  • Production Volume:

+++ Description

  • The Cliff Head facilities are the only offshore infrastructure in the Perth Basin and consist of a jack-up installed unmanned platform, connected by 14km pipelines to onshore stabilisation plant at Arrowsmith.
  • Oil is trucked 350km to the BP refinery in Kwinana.

+++ Contractors

  • **Icon Engineering:**
    • Conceptual engineering design and cost estimation
    • Install, hookup and commission the wellhead platform

+++ History

  • 2001 - Mitsui farmed into the licence
  • 2001 - Cliff Head Oil Field discovered
  • 2005 - Final Investment Decision was made and production licence was granted
  • 2006 - First oil produced
  • 2011 - Roc increased its stake to 42.5%

+++ Geology

  • The hydrocarbon play at Cliff Head is a series of stacked Permian sandstone reservoirs within fault and dip-closed structures, sealed by the regional Kockatea Shale.

+++ Links

  1. ROC, Cliff Head Oil Field
  2. Offshore Oil And Gas Production Platforms In Australia
  3. Icon Engineering Platform References
  4. ROC Farms Out 15% of WA-286-P to Mitsui
  5. Cliff Head Oil Field- Update and Future Plans
  6. ROC Acquires Additional Interest in Cliff Head