Cleopatra Natural Gas Pipeline

From A Barrel Full
Revision as of 12:27, 13 September 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Source: Southern Green Canyon * Destination: SS332 * Ownership: BP * Website: * Length: kilometres (115 miles) * Capacity: 500 mmcf per day * Statu...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Source: Southern Green Canyon
  • Destination: SS332
  • Ownership: BP
  • Website:
  • Length: kilometres (115 miles)
  • Capacity: 500 mmcf per day
  • Status: Operating

+++ Details

  • It is part of the Mardi Gras Transportation System
  • A 115 mile pipeline providing gathering services in Southern Green Canyon, with access to Atwater Valley, Walker Ridge, and Lund areas in the Gulf of Mexico.
  • From SS332 downstream access is to Manta Ray and Nautilus pipeline systems

++++ Related Oil and Gas Fields

+++ History

  • 2002 - BHP Billiton acquires a stake in the project
  • 2005 - Cleopatra Natural Gas Pipeline entered service

+++ Other Information

  • -

+++ Links

  1. Cleopatra Gas Pipeline, BP
  2. BHP Billiton to Invest in Gulf of Mexico Transportation System