Cili Padi Gas Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Shell
  • Country: Malaysia
  • Location: SK 308, 153 km offshore Bintulu
  • Production start:
  • Partners: Petronas, Nippon Oil
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

+++ Contractors

  • **Technip:** conceptual and detailed design engineering for:
    • topsides(1) and substructure for a new unmanned satellite drilling riser(2) platform,
    • topsides, substructure and bridge for another new riser platform, which will be bridge-linked to the existing F23 gas production platform,
    • modification of the topsides of the F23 platform for the tie-in of the two new platforms,
    • a new 30 km pipeline including a subsea T-piece for the tie-in of the Selasih field, and
    • a new electrical power generation and distribution system.
  • **TL Offshore:**
  • **Kencana:** CPDR-A Topsides


+++ History

  • 2007 - Technip awarded conceptual and detailed design engineering contract

+++ Geology

+++ Links

  1. FoundOcean Subsea References
  2. Anggerik Laksana Platform References
  3. SapuraKencana Platform References
  4. Technip awarded contract for the Cili Padi gas field development in Malaysia