Difference between revisions of "Chissonga Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 26: | Line 26: | ||
=== Links === | === Links === | ||
+ | # [[Total Upstream History in Africa]] | ||
# [http://www.maerskoil.com/GlobalOperations/Angola/Pages/angola.aspx Maersk, Angola] | # [http://www.maerskoil.com/GlobalOperations/Angola/Pages/angola.aspx Maersk, Angola] | ||
# [http://killajoules.wikidot.com/archive:angola-block-16-chissonga-1-well Angola, Block 16, Chissonga-1 Well] | # [http://killajoules.wikidot.com/archive:angola-block-16-chissonga-1-well Angola, Block 16, Chissonga-1 Well] |
Latest revision as of 10:55, 2 December 2023
Summary Information
- Operator: TotalEnergies
- Country: Angola
- Location: Block 16
- Production start:
- Partners: Maersk Oil - 65%, Sonangol - 20% and Odebrecht 15%
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The field is operated using the Chissonga FPSO
+++ Contractors
- -
History
- 2005 - Maersk Oil entered Angola with the acquisition of a 50% interest in the deepwater Block 16 from CNR
- 2009 - First successful exploratory well drilled
- 2010 - Second exploratory well successful
- 2011 - Maersk Oil acquired another 15% of the block from Devon energy
- 2017 - Total acquired a stake in its take over of Maersk
+++ Geology