* Partners: | * Partners: | ||
* Type: Oil & Gas | * Type: Oil & Gas | ||
− | * Estimated Reserves: | + | * Estimated Reserves: Total 2P (Proven plus Probable) reserves are 28.3 mmboe as of 31 December 2022 |
* Production Volume: | * Production Volume: | ||
=== Description === | === Description === | ||
+ | * An onshore field covering a large geographical area | ||
* The Chinarevskoye field has produced more than 100 million boe since 2004. It is positioned in the pre-Caspian basin | * The Chinarevskoye field has produced more than 100 million boe since 2004. It is positioned in the pre-Caspian basin | ||
+ | * There have been 103 wells and side-tracks drilled under the PSA between 2004 and 2021. | ||
+ | * The oil treatment facility (OTF) has a maximum throughput capacity of 400,000 tonnes per annum. | ||
+ | * Gas is processed at the [[Chinarevskoye Gas Processing Plant]] along with gas from other fields | ||
=== Contractors === | === Contractors === | ||
Line 19: | Line 23: | ||
=== Geology === | === Geology === | ||
− | * | + | * Chinarevskoye is a multi-layer structure with 17 reservoirs and 53 compartments spread over three areas. Commercial hydrocarbons have been found in the Lower Permian, Bashkirian, Bobrikovski, Tournaisian, Frasnian, Mullinski, Ardatovski, and Biyski-Afoninski reservoirs. |
=== Links === | === Links === |
Latest revision as of 09:43, 17 January 2024
Summary Information
- Operator: Nostrum
- Country: Kazakhstan
- Location:
- Production start: 2004
- Partners:
- Type: Oil & Gas
- Estimated Reserves: Total 2P (Proven plus Probable) reserves are 28.3 mmboe as of 31 December 2022
- Production Volume:
Description
- An onshore field covering a large geographical area
- The Chinarevskoye field has produced more than 100 million boe since 2004. It is positioned in the pre-Caspian basin
- There have been 103 wells and side-tracks drilled under the PSA between 2004 and 2021.
- The oil treatment facility (OTF) has a maximum throughput capacity of 400,000 tonnes per annum.
- Gas is processed at the Chinarevskoye Gas Processing Plant along with gas from other fields
Contractors
- -
History
- 1997 - Nostrum was granted an exploration and production licence
Geology
- Chinarevskoye is a multi-layer structure with 17 reservoirs and 53 compartments spread over three areas. Commercial hydrocarbons have been found in the Lower Permian, Bashkirian, Bobrikovski, Tournaisian, Frasnian, Mullinski, Ardatovski, and Biyski-Afoninski reservoirs.