Difference between revisions of "Chinarevskoye Oil and Gas Field"

From A Barrel Full
Jump to navigation Jump to search
 
Line 6: Line 6:
 
* Partners:  
 
* Partners:  
 
* Type: Oil & Gas
 
* Type: Oil & Gas
* Estimated Reserves:  
+
* Estimated Reserves: Total 2P (Proven plus Probable) reserves are 28.3 mmboe as of 31 December 2022
 
* Production Volume:  
 
* Production Volume:  
  
 
=== Description ===
 
=== Description ===
 +
* An onshore field covering a large geographical area
 
* The Chinarevskoye field has produced more than 100 million boe since 2004. It is positioned in the pre-Caspian basin
 
* The Chinarevskoye field has produced more than 100 million boe since 2004. It is positioned in the pre-Caspian basin
 +
* There have been 103 wells and side-tracks drilled under the PSA between 2004 and 2021.
 +
* The oil treatment facility (OTF) has a maximum throughput capacity of 400,000 tonnes per annum.
 +
* Gas is processed at the [[Chinarevskoye Gas Processing Plant]] along with gas from other fields
  
 
=== Contractors ===
 
=== Contractors ===
Line 19: Line 23:
  
 
=== Geology ===
 
=== Geology ===
*  
+
* Chinarevskoye is a multi-layer structure with 17 reservoirs and 53 compartments spread over three areas. Commercial hydrocarbons have been found in the Lower Permian, Bashkirian, Bobrikovski, Tournaisian, Frasnian, Mullinski, Ardatovski, and Biyski-Afoninski reservoirs.
  
 
=== Links ===
 
=== Links ===

Latest revision as of 09:43, 17 January 2024

Summary Information

  • Operator: Nostrum
  • Country: Kazakhstan
  • Location:
  • Production start: 2004
  • Partners:
  • Type: Oil & Gas
  • Estimated Reserves: Total 2P (Proven plus Probable) reserves are 28.3 mmboe as of 31 December 2022
  • Production Volume:

Description

  • An onshore field covering a large geographical area
  • The Chinarevskoye field has produced more than 100 million boe since 2004. It is positioned in the pre-Caspian basin
  • There have been 103 wells and side-tracks drilled under the PSA between 2004 and 2021.
  • The oil treatment facility (OTF) has a maximum throughput capacity of 400,000 tonnes per annum.
  • Gas is processed at the Chinarevskoye Gas Processing Plant along with gas from other fields

Contractors

  • -

History

  • 1997 - Nostrum was granted an exploration and production licence

Geology

  • Chinarevskoye is a multi-layer structure with 17 reservoirs and 53 compartments spread over three areas. Commercial hydrocarbons have been found in the Lower Permian, Bashkirian, Bobrikovski, Tournaisian, Frasnian, Mullinski, Ardatovski, and Biyski-Afoninski reservoirs.

Links

  1. Nostrum, Assets