Difference between revisions of "Chiba Kyokuto Refinery"

From A Barrel Full
Jump to navigation Jump to search
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
Ownership: Kyokuto, (Exxon Mobil Co. & Mitsui Petrochemical Co., Ltd.)
+
* Ownership: Kyokuto, (Exxon Mobil Co. & Mitsui Petrochemical Co., Ltd.)
Website: http://kpi.co.jp/
+
* Website: http://kpi.co.jp/
Location: Chiba, Japan
+
* Location: Chiba, Japan
Capacity: 7.5 million tons/annum & 152,000m bbl/day
+
* Capacity: 7.5 million tons/annum & 152,000m bbl/day
Nelson Complexity:
+
* Nelson Complexity:
Refining Depth:
+
* Refining Depth:
Brief Description
+
=== Brief Description ===
A medium sized, medium complexity refinery
+
* A medium sized, medium complexity refinery
Refining Units
+
=== Refining Units ===
Atmospheric Distillation, 175.000
+
* Atmospheric Distillation, 175.000
Vacuum Crude Oil Distillation, 83.000
+
* Vacuum Crude Oil Distillation, 83.000
Catalytic Cracking, 34.000
+
* Catalytic Cracking, 34.000
Hydro-Cracking, 40.000
+
* Hydro-Cracking, 40.000
Catalytic Reforming, 28.000
+
* Catalytic Reforming, 28.000
Naphtha Desulfurizaton, 28.000
+
* Naphtha Desulfurizaton, 28.000
"FCCG Desulfurization", 14.000
+
* "FCCG Desulfurization", 14.000
Middle Distillate Desulfurization, 83.500
+
* Middle Distillate Desulfurization, 83.500
Terminal Capacity
+
=== Terminal Capacity ===
Crude Oil: 1,100,000 kl
+
* Crude Oil: 1,100,000 kl
Refined Products: 1,510,000 kl
+
* Refined Products: 1,510,000 kl
Crude Supply
+
=== Crude Supply ===
-
+
*
Products Produced
+
=== Products Produced ===
LPG, Gasoline, Jet Fuel, Diesel
+
* LPG, Gasoline, Jet Fuel, Diesel
Ongoing Projects
+
=== Ongoing Projects ===
-
+
* -
Other Information
+
=== Other Information ===
-
+
* -
History
+
=== History ===
1968 - Refinery commissioned with 60,000 bpd capacity
+
* 1968 - Refinery commissioned with 60,000 bpd capacity
1972 - Capacity increased to 100,000 bpd
+
* 1972 - Capacity increased to 100,000 bpd
1974 - Capacity increased to 150,000 bpd
+
* 1974 - Capacity increased to 150,000 bpd
1983 - Hydrocracker and hydrogen unit commissioned
+
* 1983 - Hydrocracker and hydrogen unit commissioned
2014 - 23,000 bpd Reduction in capacity announced
+
* 2014 - 23,000 bpd Reduction in capacity announced
 +
* 2016 - Merger of Tonen General and JX holdings brought refinery under Eneos control
 +
 
 
=== Links ===
 
=== Links ===
 +
# [[Toyo Refinery References]]
 
# [http://kpi.co.jp/facilities/joryutou.html Refinery Units], (Japanese)
 
# [http://kpi.co.jp/facilities/joryutou.html Refinery Units], (Japanese)
 
# [http://killajoules.wikidot.com/blog:5046 TonenGeneral Group to Optimize Operations]
 
# [http://killajoules.wikidot.com/blog:5046 TonenGeneral Group to Optimize Operations]
# [[Toyo Refinery References]]
+
# [https://abarrelfull.blogspot.com/2022/01/execution-of-memorandum-of.html Execution of Memorandum of Understanding regarding Business Integration]
 +
 
 +
 
 +
[[category:Refinery]]
 +
[[category:Japan]]
 +
[[category:Eneos]]

Latest revision as of 16:51, 25 January 2022

Summary Information

  • Ownership: Kyokuto, (Exxon Mobil Co. & Mitsui Petrochemical Co., Ltd.)
  • Website: http://kpi.co.jp/
  • Location: Chiba, Japan
  • Capacity: 7.5 million tons/annum & 152,000m bbl/day
  • Nelson Complexity:
  • Refining Depth:

Brief Description

  • A medium sized, medium complexity refinery

Refining Units

  • Atmospheric Distillation, 175.000
  • Vacuum Crude Oil Distillation, 83.000
  • Catalytic Cracking, 34.000
  • Hydro-Cracking, 40.000
  • Catalytic Reforming, 28.000
  • Naphtha Desulfurizaton, 28.000
  • "FCCG Desulfurization", 14.000
  • Middle Distillate Desulfurization, 83.500

Terminal Capacity

  • Crude Oil: 1,100,000 kl
  • Refined Products: 1,510,000 kl

Crude Supply

Products Produced

  • LPG, Gasoline, Jet Fuel, Diesel

Ongoing Projects

  • -

Other Information

  • -

History

  • 1968 - Refinery commissioned with 60,000 bpd capacity
  • 1972 - Capacity increased to 100,000 bpd
  • 1974 - Capacity increased to 150,000 bpd
  • 1983 - Hydrocracker and hydrogen unit commissioned
  • 2014 - 23,000 bpd Reduction in capacity announced
  • 2016 - Merger of Tonen General and JX holdings brought refinery under Eneos control

Links

  1. Toyo Refinery References
  2. Refinery Units, (Japanese)
  3. TonenGeneral Group to Optimize Operations
  4. Execution of Memorandum of Understanding regarding Business Integration